THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16001 - 16050 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
PIA: Phase 1: Field Study and Walkdown Addendum Report | PIA: Phase 1: Field Study and Walkdown Addendum Report | PIA Phase 1 | 11/07/2018 | Dr. Heidi Fourie | Zitholele Consulting | 11/07/2018 - 09:39 | ||
PIA: Kudu and Tango WEFs | PIA: Proposed Development of the Kudu and Tango Wind Energy Facilities near Aberdeen in the Eastern Cape | PIA Phase 1 | 16/08/2023 | John Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 19/09/2023 - 11:00 | |
Palaeontology Amahleke Water Supply | PIA: Proposed expansion of the Amahleke Water Supply Scheme near Dimbaza outside King Williams Town, Buffalo City Metropolitan Municipality, Eastern Cape | PIA Phase 1 | 10/12/2015 | John Almond | Buffalo City Municipality | 15/01/2016 - 12:16 | ||
PIA: PROPOSED ST. HELENA COMMUNITY WIND FARM DEVELOPMENT Saldanha Bay Municipality, Vredenburg District, Western Cape | PIA: PROPOSED ST. HELENA COMMUNITY WIND FARM DEVELOPMENT Saldanha Bay Municipality, Vredenburg District, Western Cape | PIA Phase 1 | 10/02/2012 | John Pether | Arcus Gibb (Pty) Ltd | CTS_350990 | 08/12/2015 - 14:22 | |
PIA[D]-Maidenhead Farming Development, near Queenstown, CHDM, Eastern Cape | PIA[D]-Maidenhead Farming Development, near Queenstown, CHDM, Eastern Cape | PIA Desktop | 26/05/2021 | Elize Butler | 26/05/2021 - 09:54 | |||
PIA[HS]-Ezibeleni Waste Buy-back Centre (near Queenstown), EMLM, Eastern Cape | PIA[HS]-Ezibeleni Waste Buy-back Centre (near Queenstown), EMLM, Eastern Cape | Heritage Statement | 27/09/2016 | Elize Butler | isi-Xwiba Consulting cc | 27/09/2016 - 17:42 | ||
PIA[P1]-Two Gravel Mines for Upgrading of the DR02614 and DR02625, Sterkstroom Area, EMLM, Eastern Cape | PIA[P1]-Two Gravel Mines for Upgrading of the DR02614 and DR02625, Sterkstroom Area, EMLM, Eastern Cape | PIA Phase 1 | 28/09/2016 | Elize Butler | isi-Xwiba Consulting cc | 28/09/2016 - 10:14 | ||
Pienaars Poort Phase Two Archaeological Test Excavations: Erf 197/5 Saldanha Bay, Vredenburg Magisterial District, Western Cape | Pienaars Poort Phase Two Archaeological Test Excavations: Erf 197/5 Saldanha Bay, Vredenburg Magisterial District, Western Cape | Archaeological Permit Report | 01/01/2007 | Mary Patrick, Nicholas Wiltshire, Andrew B Smith | Cape Archaeological Survey CC | 16/06/2012 - 14:33 | ||
9-2-253-0003-20000331-RRCRC | Pietersburg Main Outfall Sewer | HIA Letter of Exemption | 31/03/2000 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00274 | 16/06/2012 - 14:39 | |
PIA PPM Chrome Project | Pilanesburg Platinum Mine Chrome Project – Palaeontological Impact Assessment | PIA Desktop | 10/02/2011 | Bruce Rubidge | Evolutionary Studies Institute | SLR Consulting (Africa) | 14/09/2012 - 15:41 | |
Pilansberg Nature Reserve HIA | Pilansberg Nature Reserve Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 26/02/2014 | Nkosinathi Godfrey Tomose | Aurecon - Cape Town | 05/03/2014 - 12:07 | ||
Pilgrim X housing project, Isipingo, eThekwini Municipality | Pilgrim X Housing Project, Isipingo, Ward 90, eThekwini Municipality, KwaZulu-Natal | HIA Phase 1 | 05/07/2021 | Jean Beater | JLB Consulting | Vuvamu (Pty) Ltd | 28/07/2021 - 14:08 | |
CO2 Injection HIA Report | PILOT CARBON DIOXIDE STORAGE PROJECT NEAR LEANDRA, MPUMALANGA PROVINCE | HIA Phase 1 | 18/05/2023 | Jennifer Kitto | Nitai Consulting | 01/06/2023 - 08:12 | ||
PINQUER PIGGERY | Pinquer Multi Trading Pty Ltd proposes to construct pinquer piggery houses for 50 sow with total of 1,500 standing pigs on pig houses, waste water ponds, carcases pit, internal roads. | HIA Letter of Exemption | 14/10/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Nature's Environmental Agency | 14/10/2021 - 12:44 | |
Rooipunt Water Pipeline Heritage Assessment | PIPELINES FOR PROPOSED ROOIPUNT SOLAR THERMAL POWER PLANT NEAR UPINGTON, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 25/04/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 22/06/2016 - 07:46 | |
Plaas de Eenzaamheid, Agter-Paarl: Bywerk van struktuuranalise (Mrt) | Plaas de Eenzaamheid, Agter-Paarl: Bywerk van struktuuranalise (Mrt) | 01/01/2005 | Hennie Vos | ArCape | 16/06/2012 - 14:33 | |||
Plaas Eenzaamheid, Agter-Paarl: Historiese oorsig en strukturele ondersoek van 'n c.1700 pioniersgebou (Bohuis, Porsie 1) (Okt) | Plaas Eenzaamheid, Agter-Paarl: Historiese oorsig en strukturele ondersoek van 'n c.1700 pioniersgebou (Bohuis, Porsie 1) (Okt) | 01/01/2002 | Hennie Vos | ArCape | 16/06/2012 - 14:33 | |||
Plaas Meerlust: Klipbrug oor Eerste Rivier | Plaas Meerlust: Klipbrug oor Eerste Rivier | AIA Phase 1 | 01/01/1986 | Hennie Vos | Stellenbosch Museum | CTS_3651 | 16/06/2012 - 14:33 | |
9-2-069-0056-20060401-AAHM | Plaisir De Merle. Proposed Additional 1 Dwelling Units: Remodelling of Homestead and Longhouse: Long-Term Lease Agreement. Farm No 968 Paarl | HIA Phase 1 | 01/04/2006 | H Aikman | AIKMAN ASSOCIATES HERITAGE MANAGEMENT | MAPID_01341 | 16/06/2012 - 14:36 | |
Plastic and and Coal Gasification in Waltloo, Pretoria | Plastic and Coal Gasification in Waltloo, Pretoria | AIA Phase 1 | 03/12/2019 | Matt Lotter | EScience Associates (Pty) Ltd | 27/08/2020 - 09:35 | ||
Plastic and Coal Glassification Plant in Waltloo, Pretoria Phase 1 AIA | Plastic and Coal Glassification Plant in Waltloo, Pretoria Phase 1 Archaeological Impact Assessment | AIA Phase 1 | 03/12/2019 | Matt Geoffrey Lotter | EScience Associates (Pty) Ltd | 03/12/2019 - 09:48 | ||
Progress Report | Platberg mission station excavation, fieldwork report on season one. | Archaeological Permit Report | 28/09/2015 | Shelona Klatzow | 28/09/2015 - 18:09 | |||
Platreef GPR Report 1 | Platreef GPR Assesment 2015 Consolidated Report | Burial Grounds and Graves Specialist Reports | 05/11/2015 | Willem Coenraad Nienaber | PGS Heritage and Grave Relocation Consultants | 19/11/2015 - 14:28 | ||
Heritage Reports | Please note that there are two reports 1) Report done for the Goedetrouw Infrastructure Option (preferred option with the least impact on heritage resources and graves), and 2) The Ketting Infrastructure Option, which was evaluated as an alternative option. | Heritage Impact Assessment Specialist Reports | 23/07/2019 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 16/08/2019 - 10:35 | |
Mining and Prospecting rights in bloemfontein Free State Testing | Please provide a more detailed description of your application in 3-4 lines. Finish off your proposal description with the name of the province in which this application is taking place. For built environment permit applications specify the erf and drawing numbers. For example: Proposed 240 hectare housing development on erf 12345, Hilton, Bloemfontein, Mangaung Municipality, Free State Built Environment example: Proposed alterations & additions to Erf 12345, 12 Main Road, Berea, Durban, Ethekwini, KwaZulu-Natal. Drawing 12/555678 | Heritage Impact Assessment Specialist Reports | 14/04/2015 | 28/04/2015 - 15:35 | ||||
AIA_Pofadder_Solar_Thermal_Facility_Morris_D_Apr10 | Pofadder Solar Thermal Facility. Specialist Input for the Scoping Phase of the Environmental Impact Assessment for the Proposed Pofadder Solar Thermal Facility, Northern Cape Province. Archaeology | AIA Desktop | 28/04/2010 | David Morris | McGregor Museum | 16/06/2012 - 14:49 | ||
Permit_Kirsten_Patrick_M_Jun07 | Pollsmoor final report on the exhumation of the Kirsten Family Burial Ground erf 4702, Constantia. | Archaeological Permit Report | 01/06/2007 | Mary Patrick, Belinda Mutti | 16/06/2012 - 14:53 | |||
Permit_Pollsmoor_Patrick_M_Jun07 | Pollsmoor Final Report on the Exhumation of the Kirsten Family Burial Ground Erf 4702, Constantia. Report Prepared | Export Permit Report | 01/06/2007 | Mary Patrick, Belinda Mutti | Cape Archaeological Survey CC | 16/06/2012 - 14:53 | ||
AIA_Pollsmoor_Patrick_M_Jul06 | Pollsmoor: Historical Background, Erf 4702, Constantia; First Phase Archaeological Assessment | AIA Phase 1 | 01/07/2006 | Mary Patrick, J Blackenberg | Cape Archaeological Survey CC | MAPID_00608 | 16/06/2012 - 14:49 | |
POLOKWANE EMERGENCY PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT | POLOKWANE EMERGENCY PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT | Tsimba Archaeological Footprints (Pty) Ltd | 09/06/2022 - 10:16 | |||||
HIA Pongola-Candover 132kv Power Line BA2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover Switching Station, development of the Golela 132/22 kV Substation | HIA Phase 1 | 15/04/2014 | Wouter Fourie | Department of Environmental Affairs | Zitholele Consulting | 09/04/2014 - 06:58 | |
Pongola-Ca dover 132kV Power Line and Golela 132/22kV BAR2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover switching station, development of the Golela 132/22kV substation | HIA Phase 1 | 01/11/2012 | Wouter Fourie | Zitholele Consulting | Zitholele Consulting | 30/10/2013 - 09:01 | |
Pongola-Candover 132kV Turn-in Lines BAR2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover switching station, development of the Golela 132/22kV substation DBAR2 | HIA Phase 1 | 15/04/2014 | Wouter Fourie | Zitholele Consulting | CTS_137535 | 29/10/2013 - 21:32 | |
Pongola-Candover 132kV Turn-in Lines BAR2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover switching station, development of the Golela 132/22kV substation DBAR2 | HIA Phase 1 | 29/11/2013 | Wouter Fourie | Zitholele Consulting | 29/10/2013 - 21:32 | ||
Poortjie (Dark City) | Poortjie (Dark City) – upgrading of informal settlement and township establishment, Extent of the Farm Poortjie 338 IQ and Portion 143 of the Farm Rietfontein 336 IQ, City of Johannesburg Metropolitan Municipality, Gauteng Province | PIA Desktop | 30/08/2016 | 30/09/2016 - 13:28 | ||||
Popo heritage | Popo heritage | HIA Phase 1 | 09/10/2019 | A Abzhanov | Maropeng 'a Afrika | Maropeng 'a Afrika | 14/08/2020 - 15:48 | |
Popo Molefe heritage | Popo Molefe heritage | HIA Phase 1 | 09/10/2019 | A Stone | Newshelf 1282 (Pty) Ltd | Newshelf 1282 (Pty) Ltd | 28/07/2020 - 11:24 | |
Permit_PORT_DURNFORD_PRE-FEASIBILITY_STUDY_Anderson_G_Oct07 | PORT DURNFORD PRE-FEASIBILITY STUDY: IDENTIFICATION OF SITES OF ARCHAEOLOGICAL AND CULTURAL SIGNIFICANCE | Archaeological Permit Report | 29/10/2007 | Gavin Anderson | 16/06/2012 - 14:53 | |||
New Light House, Port Nolloth section 38.8 | Port Nolloth Light House Basic Assessment Report - Heritage | HIA Phase 1 | 13/02/2013 | Timothy Hart | ACO Associates CC | Council for Scientific and Industrial Research | 13/02/2013 - 09:10 | |
Port Shepstone Gaol HIA Part 2014 12 07 | Port Shepstone Gaol | Heritage Impact Assessment Specialist Reports | 05/12/2014 | Robert J W Brusse | Robert J W Brusse | Robert J W Brusse | 03/04/2017 - 11:18 | |
AIA_Taaiboschfontein_88_Morris_D_Aug06 | Portion 1 and remaining extent of Taaiboschfontein 88 | AIA Phase 1 | 30/08/2006 | David Morris | McGregor Museum | MAPID_03435 | 16/06/2012 - 14:50 | |
Portion 11 of Farm 1426 Paarl NID | Portion 11 of Farm 1427 NID Graphic Material and NID Form | Heritage Scoping | 17/08/2022 | Lize Malan | 28/03/2023 - 13:12 | |||
AIA_Knopjeslaagte_115_Huffman_TN_May09 | Portion 115 of Knopjeslaagte: Heritage Assessment | AIA Phase 1 | 01/05/2009 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | 16/06/2012 - 14:47 | ||
Paleontology reports | Portion 2 of the Farm Ganspan 194, Portion 11 of the farm Oersonskraal 250, Northwest Province DESKTOP STUDY PALAEONTOLOGY | PIA Desktop | 06/10/2018 | JF Durand | Exigo Sustainability | LW Consultatns | 17/10/2018 - 20:57 | |
PIA_Maitland_Mines_Almond_JE_Jan10 | Portion 30 of Farm Maitland Mines No. 478, Uitenhage (Eastern Cape Province | PIA Phase 1 | 18/01/2010 | John E Almond | Natura Viva CC | 16/06/2012 - 14:54 | ||
Permit_Uitkomst_23_ptn_37_TP13_Yates_R_Sep06 | Portion 37 of the Farm Uitkomst 23, Paternoster, Saldanha Bay Municipality, Western Cape Province. Archaeological Excavation of Mitigation of the Area Around Test Pit 13. Progress Report | Archaeological Permit Report | 27/09/2006 | Royden Yates, Peter Nilssen | Centre for Heritage and Archaeological Resource Management cc | MAPID_00082 | 16/06/2012 - 14:53 | |
Permit_Uitkomst_23_ptn_37_Shell_Yates_R_Sep06 | Portion 37 of the Farm Uitkomst 23, Paternoster, Saldanha Bay Municipality, Western Cape Province. Sampling of Shellfish Residues from Th06, Th07, Th08, Th09 and Th15 | Archaeological Permit Report | 01/09/2006 | Royden Yates, Peter Nilssen | MAPCRM CC | MAPID_01934 | 16/06/2012 - 14:53 | |
AIA_Nooitgedacht_62_JU_Ptn_6_Fourie_W_Oct05 | Portion 6 of the Farm Nooitgedacht 62 JU, White River. Heritage Assessment | AIA Phase 1 | 19/10/2005 | Wouter Fourie, Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_00695 | 16/06/2012 - 14:48 | |
9-2-258-0005-20070701-NCHM | Portion 70 of the Farm Mooiplaats 355 JR, Pretoria Municipal District, Gauteng Province | AIA Phase 1 | 01/07/2007 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01272 | 16/06/2012 - 14:40 | |
AIA_Cromdale_453_JT_Fourie_W_Sep05 | Portion 9 of the Farm Cromdale 453 JT, Nelspruit / Mbombela Area Heritage Assessment | AIA Phase 1 | 16/09/2005 | Wouter Fourie, Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_03062 | 16/06/2012 - 14:44 |