Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort ascending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
AIA Construction of a Citrus Packaging Facility Phase 1 Archaeological Impact Assessment Report Construction of a Citrus Packaging Facility of 13 500m2 on a Portion of Farm 567 (Ouwerf), Clanwilliam, Cederberg Local Municipality, West Coast District Municipality, Western Cape 01/06/2011 Liezl van Pletzen-Vos, Renee Rust Pro-Active Archaeology Cape Lowlands Environmental Services cc. CTS_329644 07/09/2015 - 13:47
AIA Constantia Trial Excavation at ERF 162247 TRIAL EXCAVATION TO EXAMINE STATE OF HISTORIC FURROW (LEIWATER) AT ERF 162247, SILLERY, CONSTANTIA, SOUTH WESTERN CAPE PROVINCE. AIA Phase 2 01/01/2004 Jayson Orton, Timothy Hart ACO Associates CC Doug Jeffery Environmental Consultants CTS_329552 02/09/2015 - 13:55
AIA Chloorkop South Archaeological Impact Assessment Of the Proposed Industrial Park known as Chloorkop South, Gauteng AIA Phase 1 15/05/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Eco Assessments 05/05/2014 - 21:39
AIA CAMPBELL BORROW PIT FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE BORROW PIT DEVELOPMENTS NEAR CAMPBELL, NORTHERN CAPE AIA Phase 1 20/11/2012 Cobus Dreyer MDA Town and Regional Planners MDA Town and Regional Planners 12/08/2013 - 17:34
AIA Buchuberg Archaeological Impact Assessment Report for the Proposed re-use of a hard rock quarry on the Farm Buchuberg 296 in the Hay Magisterial District 24km East of Groblershoop AIA Phase 1 12/12/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting Site Plan Consulting 28/01/2013 - 12:49
AIA Bronkhorstspruit AIA Bronkhorstpruit Railway Siding Original Report. AIA Phase 1 26/08/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Zantow Environmental Consulting Services 24/10/2017 - 04:37
AIA BREIDBACH SEWER AND PUMPSTATION PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED BREIDBACH CROSS CATCHMENT TRANSFER PUMPING SCHEME (SEWER PIPELINE), BREIDBACH, KING WILLIAMS TOWN, AMATHOLE DISTRICT MUNICIPALITY. AIA Phase 1 31/07/2019 Celeste Booth Booth Heritage Consulting Makhetha Environmental Consultants 11/09/2019 - 10:13
AIA Brakpoort Kliphokkies 75 MW A Phase 1 Archaeological Impact Assessment for the Proposed 75 MW Brakfontein Photovoltaic Solar Farm, Victoria West, Northern Cape Province AIA Phase 1 01/03/2012 Celeste Booth Albany Museum SRK Consulting (Pty) Ltd - Pretoria 11/06/2012 - 16:34
AIA Bospoort 558 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF THE REMAINDER OF THE FARM BOSPOORT 558 FOR THE PROPOSED BOSPOORT SAND MINE PROJECT IN THE FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE AIA Phase 1 25/02/2019 Nelius Kruger Exigo3 Sustainability LW Consultatns 14/03/2019 - 12:59
AIA Borrow Pit, Klaarstroom, Prince Albert ARCHAEOLOGICAL IMPACT ASSESSMENT OF A PROPOSED BORROW PIT ON KLEINVLEI, KLAARSTROOM, PRINCE ALBERT MUNICIPALITY, WESTERN CAPE AIA Phase 1 01/03/2012 Madelon Tusenius Vidamemoria Heritage Consultants Aurecon South Africa (Pty) Ltd CTS_503284 11/04/2018 - 14:48
AIA Bolubedu Lebaka 22kV Powerline Archaeological and Heritage Impact Assessment scoping report for proposed 20.450km 22kV Bolubedu Lebaka in Greater Letaba Local Municipality in the Limpopo Province. AIA Phase 1 31/10/2012 McEdward Murimbika, Trust Mlilo Nzumbululo Heritage Solutions Eskom - NOU 16/01/2013 - 13:53
AIA Boikarabelo Archaeological Impact Assessment. Res Gen SA Boikarabelo Coal Mine Project on Portions of the Farms Orsono 700 LQ, Zeekoevley 421 LQ, Vischpan 274 LQ, Kruishout 271 LQ, Kalkpan 243 LQ, Witkopje 238 LQ, and Diepspruit 386 LQ, District Lephalale, Limpopo AIA Phase 1 Wouter Fourie PGS Heritage and Grave Relocation Consultants Digby Wells Environmental 24/01/2014 - 14:38
AIA Birmingham Mine AIA Proposed Birmingham Mining Project AIA Phase 1 20/09/2021 Tobias Coetzee 29/09/2021 - 12:10
AIA Avontuur 725 JT Phase 1 Archaeological Impact Assessment on Plot 34 of the farm Avontuur 725 JT near Badplaas Resort, Mpumalanga Province. AIA Phase 1 12/02/2016 Jean-Pierre Celliers Kudzala Antiquity Henwood Environmental Services 09/03/2016 - 12:38
AIA Aveng Storage Yard ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Aveng Grinaker LTE Storage Yard On Portions 109 And 110 of the Farm Olifantsfontein 402 J. R, Gauteng AIA Phase 1 30/04/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting LEAP - Lanscape Architect Environmental Planner 15/09/2016 - 09:47
AIA ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF TWO BORROW PITS ON PORTIONS 12 & 18 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF TWO BORROW PITS ON PORTIONS 12 & 18, WATERKLIP NO. 103, VREDENBURG AREA, WEST COAST DISTRICT, WESTERN CAPE AIA Phase 1 01/07/2012 Madelon Tusenius Nadeson Consulting Services Vidamemoria Heritage Consultants CTS_329755 10/09/2015 - 10:58
AIA ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THREE BORROW PITS IN THE ROAD RESERVE (NODEWEE 141) ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THREE BORROW PITS IN THE ROAD RESERVE (NODEWEE 141) AND MERTENHOF 586, CEDERBERG, CLANWILLIAM DISTRICT, WESTERN CAPE AIA Phase 1 01/08/2012 Madelon Tusenius Nadeson Consulting Services Vidamemoria Heritage Consultants CTS_329753 10/09/2015 - 10:25
AIA ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF AN EXISTING BORROW PIT ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF AN EXISTING BORROW PIT AND THE DEVELOPMENT OF A NEW BORROW PIT NEAR RHEENENDAL, KNYSNA AREA, EDEN DISTRICT MUNICIPALITY, WESTERN CAPE AIA Phase 1 01/10/2012 Madelon Tusenius Aurecon - Cape Town Vidamemoria Heritage Consultants CTS_329736 09/09/2015 - 14:25
AIA ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON FARM NO. 581 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON FARM NO. 581 (KEURBOS), CLANWILLIAM DISTRICT, WESTERN CAPE AIA Phase 1 01/08/2012 Madelon Tusenius Nadeson Consulting Services Vidamemoria Heritage Consultants CTS_329752 10/09/2015 - 10:14
AIA and PIA (2 reports) 1st Report PALAEONTOLOGICAL MITIGATION IN THE ENVIRONMENTAL MANAGEMENT PLAN and J Pether 2nd report ARCHAEOLOGICAL IMPACT ASSESSMENT, PROPOSED PROSPECTING FOR PHOSPHATE ON PORTIONS 7 AND 12 OF THE FARM LANGEBERG 185 AND FARM 1043 LANGEBERG by J Kaplan AIA Phase 1 11/12/2012 Gecko Fert (Pty) Ltd 18/06/2013 - 16:14
AIA and HIA for the proposed realignment of the water pipeline, Khanyisa Power Station Phase 1 Archaeological and Heritage Impact Assessment of the Farm Groenfontein 331 JS in respect of the proposed realignment of a water pipeline connecting the Khanyisa Power Station with the eMalahleni Water Reclamation Plant, Witbank, Mpumalanga Province Heritage Impact Assessment Specialist Reports 16/07/2015 Jean-Pierre Celliers Kudzala Antiquity ACWA Power Khanyisa Thermal Power Station (RF) (Pty) Ltd 12/01/2017 - 11:23
AIA Alton Sewer Pipeline Upgrade ARCHAEOLOGICAL SURVEY OF THE PROPOSED ALTON SEWER PIPE UPGRADE AIA Phase 1 09/10/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exigent Environmental CTS_303819 02/07/2015 - 10:57
AIA Agulhas Boardwalk PROPOSED CONSTRUCTION OF A 771 M BOARDWALK FROM THE LIGHTHOUSE TO THE SOUTHERNMOST POINT, CAPE AGULHAS, AGULHAS NATIONAL PARK, WESTERN CAPE PROVINCE AIA Phase 1 01/08/2011 Lita Webley ACO Associates CC Enviroworks CTS_329719 09/09/2015 - 11:26
AIA AGRICULTURAL LAND & CONSTRUCTION OF OFF-CHANNEL STORAGE DAM ON PORTION 18 FARM UITNOORD NO. 129 ROBERTSON ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT OF AGRICULTURAL LAND AND CONSTRUCTION OF AN OFF-CHANNEL STORAGE DAM ON PORTION 18 OF THE FARM UITNOORD NO. 129 ROBERTSON. AIA Phase 1 01/02/2011 Jonathan Kaplan Enviroafrica CC Eilandia Plase (Pty) Ltd CTS_329570 03/09/2015 - 10:26
AIA Agricultural development, Onseepkans AIA Phase 1 report of proposed agricultural development, solar energy facility and reservoir with pipeline, Onseepkans, Northern Cape. AIA Phase 1 23/11/2015 Jan Engelbrecht UBIQUE HERITAGE CONSULTANTS Enviroafrica CC, Khâi Ma Local Municipality 28/11/2015 - 11:26
AIA Addendum: CHICKEN LAYER HOUSES ON BOTHA FARM EXPANSION OF AGRICULTURAL ACTIVITIES: PROPOSED CONSTRUCTION OF CHICKEN LAYER HOUSES ON BOTHA FARM (REMAIDER ERF 4000) PRIESKA, NORTHERN CAPE PROVINCE AIA Phase 2 01/10/2018 Jonathan Kaplan Agency for Cultural Resources Management Enviro Logic 07/05/2019 - 10:56
AIA Addendum: CHICKEN LAYER HOUSES ON BOTHA FARM EXPANSION OF AGRICULTURAL ACTIVITIES: PROPOSED CONSTRUCTION OF CHICKEN LAYER HOUSES ON BOTHA FARM (REMAIDER ERF 4000) PRIESKA, NORTHERN CAPE PROVINCE AIA Phase 2 01/10/2018 Jonathan Kaplan Agency for Cultural Resources Management Enviro Logic 07/05/2019 - 13:41
AIA 132 kV Powerline from Melkspruit Substation to Rouxville Substation Phase 1 Heritage Impact Assessment of a proposed new Eskom 132kV power line between the Rouxville substation in the Free State Province and the Melkspruit substation in Aliwal North, Eastern Cape Province AIA Phase 1 06/09/2017 Lloyd Rossouw National Museum Bloemfontein NSVT Consultants 15/11/2017 - 13:55
AIA -BloemsmondPV2 AIA for the Proposed AEP Bloemsmond PV 2 Solar Project Archaeological Specialist Reports 21/10/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 12/11/2015 - 10:12
AIA - Wesley-Peddie A Phase 1 Archaerological Impact Assessments of the Proposed Wesley-Peddie 132 KV Power Line for the Authorised Uncedo Lwethu Wind Energy Facility, Ngqushwa Local Municipality, Amathole District, Eastern Cape Province AIA Phase 1 21/04/2014 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 25/04/2014 - 16:26
AIA - Upington Two Proposed Development of the Upington Solar Thermal Plant Two within Portion 3 of the Farm McTaggarts Camp, West of Upington, Northern Caope: Archaeological Impact Assessment AIA Phase 1 31/03/2014 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 26/08/2014 - 16:33
AIA - The 'Vriesfontein Voerkraal', near Middelburg, Eastern Cape Phase 1 AIA - The 'Vriesfontein Voerkraal', RE of Vries Fontein Annex 40 & Portion 9 of Vries Fontein 44, near Middelburg, Inxuba Yethemba Local Municipality, Eastern Cape, South Africa AIA Phase 1 03/12/2013 Karen Van Ryneveld isi-Xwiba Consulting cc 10/12/2013 - 08:10
AIA - Thabametsi Archaeological Impact Assessment for the Proposed Thabemetsi Coal-Fired Power Station, Lephalale, Limpopo Province AIA Phase 1 28/02/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 12/03/2014 - 16:46
AIA - Stella Archaeological Impact Assessment Report for the Proposed Stella - Helpmekaaar 5 MW Solar Energy Facility near the town of Stella, North West Province Archaeological Specialist Reports 20/11/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 09/12/2013 - 11:26
AIA - Springfontein Power AIA for a proposed additional 132 KV Power Line for the Authorised Springfontein Wind Energy Facility, Free-State Province Archaeological Specialist Reports 25/02/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 24/04/2014 - 13:21
AIA - Solis Water Pipe Archaeological Impact Assessment for the Water Supply Pipleline for the Authorised Solis Concentrated Solar Power (CSP) Plant, Upington, Northern Cap Province AIA Desktop 16/04/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 09/05/2014 - 07:41
AIA - Rooifontein Bulk Water Supply ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a PROPOSED ROOIFONTEIN BULK WATER SUPPLY AIA Phase 1 16/08/2018 Jenna Lavin, Jonathan Kaplan Cedar Tower Services Enviroafrica CC 16/08/2018 - 15:33
AIA - Robben Island Archaeological Impact Assessment (AIA) Report on the survey of a site on Robben Island situated south of the Dog Unit (Robert Sobukwe House) between Murray’s Bay and Murray’s Road AIA Phase 1 01/04/2013 Ute Seemann WSP Environmental Pty Ltd - Cape Town 23/08/2021 - 13:34
AIA - RBM Feb 2005 Richards Bay Minerals February 2005 AIA Phase 1 01/02/2005 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Richards Bay Minerals CTS_303980 02/07/2015 - 13:20
AIA - R63 Upgrade from Bisho to the N6 ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for The Improvement Of National Route R63 Sections 15 And 16 From Bhisho (km 5.8) To The N6 Bridge Intersection (km 1.0) AIA Phase 1 02/04/2018 Karen Van Ryneveld, Jenna Lavin Cedar Tower Services Terreco Environmental 16/05/2018 - 10:44
AIA - Port Durnford Extension ARCHAEOLOGICAL SURVEY OF PROPOSED EXXARO PORT DURNFORD MINING LEASE AIA Phase 1 29/10/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305346 03/07/2015 - 10:39
AIA - Pongola AIA for the Proposed Construction of the 2.5MW Pongola Solar Energy Facility near Pongola, Kwazulu Natal Archaeological Specialist Reports 14/07/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 05/03/2015 - 11:57
AIA - Paulshoek Bulk Water Supply ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a PROPOSED PAULSHOEK BULK WATER SUPPLY AIA Phase 1 16/08/2018 Jenna Lavin, Jonathan Kaplan Cedar Tower Services Enviroafrica CC 16/08/2018 - 15:13
AIA - Newcastle AIA for the Proposed Construction of the 5MW Newcastle Solar Energy Facility near Newcastle, KwaZulu Natal Archaeological Specialist Reports 14/07/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/07/2014 - 09:43
AIA - MTUBATUBA INTERCHANGE DEVELOPMENT ARCHAEOLOGICAL SURVEY OF THE PROPOSED MATUBATUBA DEVELOPMENTS Archaeological Specialist Reports 24/08/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management CTS_127075 08/08/2013 - 13:32
AIA - Morgenzon AIA for the Proposed Morgenzon (15MW) photovoltaic plant on the farm Morgenzon No 35, Northern Cape Province Archaeological Specialist Reports 16/02/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 09/12/2013 - 15:40
AIA - MkuzeStorage Archaeological Impact Assessment for the Mkuze Biomass Plant and Associated Infrastructure, Near Mkuze, Kwazulu Natal Province Archaeological Specialist Reports 05/01/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 05/03/2015 - 11:40
AIA - Merensky-Uchoba 132kV Deviation REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE ESKOM MERENSKY-UCHOBA DEVIATION ROUTE AIA Phase 1 17/01/2023 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants 29/03/2023 - 15:38
AIA - Merensky 132kV Deviation A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE ESKOM MERENSKY-UCHOBA DEVIATION ROUTE AIA Phase 1 17/01/2023 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants 29/03/2023 - 16:03
AIA - Kuruman Archaeological Impact Assessment Report for the Proposed Metals Industrial Cluster near Kuruman, Northern Cape Province 20/07/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 03/11/2016 - 13:32