THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16151 - 16200 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
9-2-228-0001-20021101-NCHM | Documentation of a Historical Site on the Farm Surbiton, in the Twickenham-Paschaskraal-Hackney Mining Area, Sekhukhune District, Limpopo Province | AIA Phase 1 | 01/11/2002 | Johnny Van Schalkwyk, S Moifatswane | National Cultural History Museum | MAPID_00621 | 16/06/2012 - 14:38 | |
AIA_Bersfort_Line_Fourie_W_Feb08 | Archaeological Impact Assessment the Proposed 25 km New 132 kV Bersfort Line from Leseding Mountains to Dilokong Substation, Burgersfort, Limpopo Province | AIA Phase 1 | 29/02/2008 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01702 | 16/06/2012 - 14:43 | |
AIA_Nelsonkop_PV_Plant_Van_Schalkwyk_JA_Oct11 | Heritage Impact Assessment report for the proposed establishment of the exxaro PV plant on the farm Nelsonkop, North-West of Lephalale, Limpopo Province. | AIA Phase 1 | 01/10/2011 | Johnny Van Schalkwyk | 16/06/2012 - 14:48 | |||
AIA_Zwartkoppies_Pta_East_Kusel_U_Sep05 | A Cultural Heritage Resouces Impact Assessment of the farm Zwartkoppies, Pretoria East | AIA Phase 1 | 01/09/2005 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:51 | ||
Grooge Veldt 292 | Phase 1 Archaeological impact assessment report on the farm Drooge Veldt 292, ~30 km West of Barkly West, Frances Baard District Municipality, Northern Cape Province. | AIA Phase 1 | 14/07/2012 | CJ Esterhuyse, D Visser | SRK Consulting (Pty) Ltd - Pretoria | Theta Mining (Pty) Ltd | 06/12/2012 - 10:32 | |
AIA for Vlakkeland Residential Development, Paarl | ARCHAEOLOGICAL IMPACT ASSESSMENT OF MULTIPLE ERVEN IN NORTHERN PAARL, PAARL MAGISTERIAL DISTRICT, WESTERN CAPE | AIA Phase 1 | 24/05/2013 | Jayson Orton | ACO Associates CC | Guillaume Nel Environmental Consultancy | 26/09/2014 - 15:51 | |
Archaeological Impact Assessment for proposed Magalies Cemetery and waste transfer station | Archaeological Impact Assessment for proposed development of Magalies Cemetery and Waste Transfer Station, Portion 22 of the farm Rietpoort 395JQ, Mogale City Local Municipality, Gauteng Province | AIA Phase 1 | 04/03/2015 | Eric Ndivhuho Mathoho | Naledzi Environmental Consultants | Naledzi Environmental Consultants | 29/09/2015 - 09:54 | |
9-2-064-0029-19990122-NONE | The Point, Mossel Bay: Proposed Development Phase 1 Archaeological Report | AIA Phase 1 | 22/01/1999 | Hilary Deacon | MAPID_01338 | 16/06/2012 - 14:36 | ||
Middelburg Solar Park 1 and 2 AIA | A Phase 1 AIA for the proposed establishment of the ACED Middelburg Solar park (Park 1 and Park 2) on the Farm Tweetfontein Remiander of Farm 11 (Solar Park 1) and Tweetfontein Portion 4 of Farm 11 (Solar Park 2), Middelburg, Eastern Cape Province | AIA Phase 1 | 01/02/2012 | Albany Museum - Archaeology | Savannah Environmental (Pty) Ltd | 06/06/2012 - 16:00 | ||
AIA_Doornboschfontein_513_JQ_Dreyer_C_Nov92 | An Archaeological Survey of Doornboschfontein 513 JQ, Magaliesburg | AIA Phase 1 | 01/11/1992 | Cobus Dreyer | National Museum Bloemfontein - Archaeology Contracts Office | MAPID_03034 | 16/06/2012 - 14:44 | |
AIA_Rakwena_Crocodile_Farm_Ratho_Gaigher_S_Jan09 | Heritage Impact Assessment for the Proposed Extension to the Rakwena Crocodile Farm, Ratho, Limpopo Province | AIA Phase 1 | 01/01/2009 | Stephan Gaigher | Gaigher & Associates | MAPID_03249 | 16/06/2012 - 14:49 | |
9-2-089-0005-20060310-ACRM | Phase 1 Archaeological Impact Assessment of Portion 18 of Farm 959 Gordon's Bay Western Cape Province | AIA Phase 1 | 10/03/2006 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_00070 | 16/06/2012 - 14:37 | |
9-2-302-0052-20071005-PAHS | First Phase Archaeological and Cultural Heritage Investigation of the Proposed Residential Developments on the Remainder of the Farm Bergkraal 2213, Bloemfontein | AIA Phase 1 | 05/10/2007 | Cobus Dreyer | MAPID_01495 | 16/06/2012 - 14:42 | ||
AIA_Krynaauws_Lust_Van_der_Walt_J_Sep09 | Archaeological Impact Assessment: Application for mining permit for BP 31 on the remainder of the Farm Krynaauws Lust 275 RD, Free State Province | AIA Phase 1 | 17/09/2009 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_03398 | 16/06/2012 - 14:47 | |
AIA ON PORTIONS FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTIONS OF FARM 1038 FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 02/07/2020 | Neels Kruger | Exigo3 Sustainability | ControLab South Africa (Pty) Ltd | 05/08/2020 - 15:04 | |
WELTEVREDE 190 QWAQWA | FIRST PHASE ARCHAEOLOGICAL AND HERITAGE INVESTIGATION OF THE PROPOSED RESIDENTIAL DEVELOPMENTS AT WELTEVREDE 190, PHUTHADITJABA, QWAQWA | AIA Phase 1 | 06/09/2013 | Cobus Dreyer | NSVT Consultants | NSVT Consultants | 15/09/2013 - 21:05 | |
AIA-Hillendale August 2007 | The Archaeological Survey of Hillendale Mine | AIA Phase 1 | 24/08/2007 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exxaro Resources | CTS_305494 | 03/07/2015 - 12:38 |
9-2-032-0001-20080205-McGM | Phase 1 Heritage Impact Assessment Report on a Portion of the Farm Schuitdrift-West 5, wnw of Kakamas, Siyanda District Municipality, Northern Cape Province | AIA Phase 1 | 05/02/2008 | Peter Beaumont | McGregor Museum | MAPID_01685 | 16/06/2012 - 14:35 | |
9-2-253-0003-20070305-RRCRC | Phase 1 Heritage Impact Assessment (Scoping & Evaluation) Labonte 5 Mine Lephalale, Limpopo | AIA Phase 1 | 05/03/2007 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00862 | 16/06/2012 - 14:39 | |
AIA_Addendum_Kenhardt_100MW_Kaplan_JM_Sep11 | Addendum to report: Archaeological Impact Assessment - the proposed solar Cape 100MW photovoltaic energy generation facility near Kenhardt, Northern Cape Province | AIA Phase 1 | 04/09/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:43 | ||
AIA_Moorreesburg_river_Deacon_HJ_Dec08 | Archaeological and Heritage Impact Assessment: No Go River Clearing Project (Moorreesberg) | AIA Phase 1 | 17/12/2008 | Hilary Deacon | MAPID_01780 | 16/06/2012 - 14:48 | ||
AIA_Medupi-Spitskop_Van_der_Walt_J_Dec09 | Heritage Walkthrough for the 132 km Medupi-Spitskop Transmission Powerline project, Northam, Limpopo Province | AIA Phase 1 | 14/12/2009 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 26/07/2018 - 15:30 | ||
9-2-055-0002-20050620a-PAHS | Archaeological and Historical Investigation of the Proposed New Road from Vergenoeg to Maruping (Moropeng), Kuruman District, Northern Cape | AIA Phase 1 | 20/06/2005 | Cobus Dreyer | MAPID_00915 | 16/06/2012 - 14:36 | ||
9-2-263-0020-20060201-ACHMC | A Phase 1 Heritage Impact Assessment (HIA) Study for the Impala Platinum Shaft 17 Complex on the Farm Vlakfontein 276 JQ near Rustenburg in the North-West Province of South Africa | AIA Phase 1 | 01/02/2006 | Julius CC Pistorius | MAPID_00804 | 16/06/2012 - 14:40 | ||
AIA_Fort_Brown_Housing_Van_Ryneveld_K_Sep09 | Fort Brown Housing Project, (portion of) Fletchers Outspan 104, Albany District, Eastern Cape, South Africa | AIA Phase 1 | 21/09/2009 | Karen Van Ryneveld | 16/06/2012 - 14:45 | |||
AIA_SUB_10_ERINA_121_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment Subdivision 10 of the Farm Erina 121, Sasolburg, Free-State Province | AIA Phase 1 | 13/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_02485 | 16/06/2012 - 14:50 | |
9-2-006-0001-20071005h-PAHS | First Phase Archaeological and Cultural Heritage Assessment of the Proposed Diamond Prospecting on the Farm Saamwerk (Portion 14 Grootrivierwagendrif 29), Aliwal North, Eastern Cape: | AIA Phase 1 | 05/10/2007 | Cobus Dreyer | MAPID_01458 | 16/06/2012 - 14:33 | ||
9-2-213-0001-20031101-NCHM | Proposed Clover Hill Development, Bronkhorstspruit Dam | AIA Phase 1 | 01/11/2003 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00580 | 16/06/2012 - 14:38 | |
9-2-300-0012-20051109-PAHS | First Phase Archaeological and Cultural Heritage Assessment of the Proposed Residential Developments at the Farms Grootkrans 238, Kasteel 106 & Bergplaats 120, Kestel, Free State | AIA Phase 1 | 09/11/2005 | Cobus Dreyer | MAPID_01764 | 16/06/2012 - 14:41 | ||
AIA_Khayamnandi_Van_Ryneveld_K_Oct09 | Khayamnandi extension housing development. Despatch, Eastern Cape, South Africa | AIA Phase 1 | 19/10/2009 | Karen Van Ryneveld | 16/06/2012 - 14:46 | |||
AIA_Wilgeheuwel_Ext_26_Fourie_W_Aug07 | Wilgeheuwel Ext 26: Proposed Residential Development on Holdings 14, 15 and 16 Aanwins AH, Johannesburg, Gauteng Province | AIA Phase 1 | 24/08/2007 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_03235 | 16/06/2012 - 14:51 | |
AIA Agulhas Boardwalk | PROPOSED CONSTRUCTION OF A 771 M BOARDWALK FROM THE LIGHTHOUSE TO THE SOUTHERNMOST POINT, CAPE AGULHAS, AGULHAS NATIONAL PARK, WESTERN CAPE PROVINCE | AIA Phase 1 | 01/08/2011 | Lita Webley | ACO Associates CC | Enviroworks | CTS_329719 | 09/09/2015 - 11:26 |
9-2-022-0029-20071101-ACRM | Archaeological Impact Assessment Proposed Development Baboon Point Erven 65, 66 and Ptn 4 of Verlorenvlei Farm No. 8 Elands Bayconstraints, Opportunities and Challenges | AIA Phase 1 | 01/11/2007 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02941 | 16/06/2012 - 14:34 | |
9-2-242-0004-20060913-NCHM | Heritage Scoping Assessment: Doornkop Township | AIA Phase 1 | 13/09/2006 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01154 | 16/06/2012 - 14:39 | |
AIA_Commonage_687_Mbonose_Morris_D_Aug10 | Phase 1 Archaeological Impact Assessment on Remaining Extent of Barkly West Commonage No 687 (claim of M.N. Mbonose), Barkly West, Northern Cape | AIA Phase 1 | 22/08/2010 | David Morris | McGregor Museum | 16/06/2012 - 14:44 | ||
AIA_Port_of_Durban_Tunnel_Anderson_G_May05 | The Archaeological Survey of the Proposed North and South Entrance Shaft Sites of the New Sub-aqueous Tunnel at the Port of Durban Entrance Channel | AIA Phase 1 | 31/05/2005 | Gavin Anderson, L Anderson | Umlando: Archaeological Surveys & Heritage Management | MAPID_03357 | 16/06/2012 - 14:49 | |
AIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC | AIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC | AIA Phase 1 | 22/12/2020 | Karen Van Ryneveld | 22/12/2020 - 08:57 | |||
9-2-080-0001-20040601-ACRM | Phase 1 Archaeological Impact Assessment Portion 4 of the Farm Olifantsdoorn No 210, Robertson | AIA Phase 1 | 01/06/2004 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02797 | 16/06/2012 - 14:37 | |
9-2-258-0184-20080121-AHCC | Cultural Heritage Resources Impact Assessment of Portion 206iᆴ 300 and 301 of the Farm Zwavelpoort 373 JR Swavelpoort Tshwane Gauteng | AIA Phase 1 | 21/01/2008 | Udo Kusel | African Heritage Consultants CC | MAPID_01705 | 16/06/2012 - 14:40 | |
AIA_Slatercoal_Viljoenskroon_Van_Vollenhoven_AC_Sep11 | A Report On A Baseline Heritage Assessment For The Slatercoal Exploration And Mining Project, Close To Viljoenskroon, Free State Province | AIA Phase 1 | 01/09/2011 | Anton van Vollenhoven | Archaetnos CC | 16/06/2012 - 14:50 | ||
AIA Of Zulti North Mining Lease | The Archaeological Survey of the Zulti North Mining Lease | AIA Phase 1 | 28/10/2010 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | CTS_304017 | 02/07/2015 - 13:51 |
9-2-203-0016-20030504-APP | Assessment of and Recommendations on Human Remains Discovered During Construction at Afsaal Picnic Spot/Traders Rest, Kruger National Park | AIA Phase 1 | 04/05/2003 | Willem Coenraad Nienaber | Anthropology Private Practice (APP) | MAPID_00322 | 16/06/2012 - 14:38 | |
AIA_MBET_Pipleline_Nel_J_Apr12 | Phase 1 Archaeological Impact Assessment for Mbet Pipeline | AIA Phase 1 | 01/04/2012 | Johan Nel | Digby Wells Environmental | 16/06/2012 - 14:47 | ||
AIA_Villa_Del_Country_Estate_Van_Vollenhoven_AC_Oct07 | A Report on a Cultural Heritage Impact Assessment at the Proposed Villa Del Country Estate Delmas Ext 17, Mpumalanga Province | AIA Phase 1 | 01/10/2007 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | 16/06/2012 - 14:51 | ||
9-2-049-0001-20070307-McGM | Phase 1 Heritage Impact Assessment Report on the Farm Eureka 200 near Kimberley, Frances Baard District Municipality, Northern Cape Province | AIA Phase 1 | 07/03/2007 | Peter Beaumont | McGregor Museum | MAPID_00996 | 16/06/2012 - 14:35 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED KOPPIES SUBSTATION WITHIN THE JURISDICTION OF NGWETHE LOCAL MUNICIPALITY OF FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE, SOUTH AFRICA. | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED KOPPIES SUBSTATION WITHIN THE JURISDICTION OF NGWETHE LOCAL MUNICIPALITY OF FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 15/03/2021 | Mathoho Ndivhuho Eric , Mathoho Ndivhuho Eric | Millennium Heritage Group (PTY) LTD | 10/01/2020 - 12:15 | ||
9-2-236-0002-20051212-KA | Report on Archaeological Survey on the Farm Sterkspruit in the Lydenburg District, 33 JT | AIA Phase 1 | 12/12/2005 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_00670 | 16/06/2012 - 14:39 | |
AIA_Bucklands_Morris_D_Jan09 | Report on a Phase 1 Archaeological Impact Assessment at Bucklands Settlement near Douglas, Northern Cape | AIA Phase 1 | 01/01/2009 | David Morris | McGregor Museum | MAPID_03251 | 16/06/2012 - 14:43 | |
AIA_Oranje_1385_sub_8_Pelser_AJ_Dec06 | A Report on a Cultural Heritage Impact Assessment on Subdivision 8 of the Farm Oranje 1385, Vaaldam, Free State Province | AIA Phase 1 | 01/12/2006 | Anton Pelser | Archaetnos CC | 16/06/2012 - 14:48 | ||
9-2-280-0002-20070802-AHCC | Cultural Heritage Resources Impact Assessment of Portion 8 of the Farm Roodepoort 467 KR in Bela-Bela Limpopo Province | AIA Phase 1 | 02/08/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_03099 | 16/06/2012 - 14:41 |