Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16201 - 16250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
New croplands on the re and portion 2 of the farm Maroelaknop 844 LS | Heritage scoping report for proposed new croplands on the remaining portion and portion 2 of the farm Maroelaknop 844 LS, near Polokwane, Limpopo Province | Heritage Scoping | 23/04/2021 | Liesl Stegmann | AGES (PTY) Ltd - Limpopo | 02/11/2021 - 09:49 | |
Kokerboom 3 Heritage report for the DEIR | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARMS 214/1 AND 214/2, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | 23/04/2021 | Jayson Orton | 07/09/2021 - 16:34 | |||
Heritage Impact Assessment Kokerboom 3 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARMS 214/1 AND 214/2, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Scoping | 23/04/2021 | Jayson Orton | Department of Environmental Affairs | Business Venture Investments No. 1788 (Pty) Ltd. | 07/05/2021 - 13:28 |
Kokerboom 3 Heritage Report | Heritage Impact assessment for the proposed kokerboom 3 Wind Energy Facility on Farms 214/1 and 214/2, North of Loeriesfontein, Calvinia Magisterial District, Northern Cape. | AIA Phase 1 | 23/04/2021 | Jayson Orton | 07/05/2021 - 15:23 | ||
PIA Power Line Corridor, Lejweleputswa District Municipality, Free State Province - Virginia 1, Virginia 2, Virginia 3 Solar Parks, and Power Line Corridor | PIA Power Line Corridor, Lejweleputswa District Municipality, Free State Province - Virginia 1, Virginia 2, Virginia 3 Solar Parks, and Power Line Corridor | PIA Phase 1 | 23/04/2021 | Bruce Rubidge | Bruce Rubidge | AGES (PTY) Ltd - Limpopo | 25/10/2021 - 11:46 |
Kokerboom 3 Heritage Report | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARMS 214/1 AND 214/2, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | AIA Phase 1 | 23/04/2021 | Jayson Orton | 07/05/2021 - 15:46 | ||
Kokerboom 3 Heritage Report | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARMS 214/1 AND 214/2, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | AIA Phase 1 | 23/04/2021 | Jayson Orton | 07/05/2021 - 15:55 | ||
Kokerboom 3 Heritage Report | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARM 213/REM, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | 23/04/2021 | Jayson Orton | 07/05/2021 - 16:04 | |||
Kokerboom 3 Heritage Report | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARM 213/REM, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | 23/04/2021 | Jayson Orton | 07/05/2021 - 16:17 | |||
Langaville Ext 12 Sewer and Water | The Proposed Construction of the Bulk Sewer Pipeline and Upgrade of the Bulk Water Pipeline in Langaville Ext 12, City of Ekurhuleni, Gauteng Province | Heritage Scoping | 28/04/2021 | Jenna Lavin | CTS Heritage | CTS Heritage | 04/06/2021 - 14:09 |
HIA: Vrede Solar Energy Facilities | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Vrede Solar Energy Facilities near Kroonstad, Free State Province | HIA Phase 1 | 28/04/2021 | Jenna Lavin, Dominic Stratford, Kimberley Chapelle | CTS Heritage | Savannah Environmental (Pty) Ltd | 30/04/2021 - 19:22 |
Calodex Solar PV Heritage Report | Archaeological Impact Assessment (AIA) for the proposed establishment of a 115 megawatt (MW) Solar Photovoltaic (PV) Facility in Springs. | AIA Phase 1 | 28/04/2021 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Archaetnos Culture & Cultural Resource Consultants | 25/06/2021 - 15:18 |
HIA: Rondavel Solar Energy Facilties | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Rondawel Solar Energy Facilities near Kroonstad, Free State Province | HIA Phase 1 | 28/04/2021 | Jenna Lavin, Dominic Stratford, Kimberley Chapelle | CTS Heritage | Savannah Environmental (Pty) Ltd | 30/04/2021 - 19:29 |
SAHRIS CaseID 16010 - Letter 1 | SAHRIS CaseID 16010 - Letter 1 | 28/04/2021 | Karen Van Ryneveld | 28/04/2021 - 13:05 | |||
UCD6097 - Draft EIA Appendix J (Palaeontology) | Palaeontological Impact Assessment for the proposed Universal Coal Ubuntu Colliery road diversion, South east of Delmas, Mpumalanga Province | PIA Phase 2 | 30/04/2021 | Marion Bamford | Digby Wells Environmental | Universal Coal (Pty) Ltd | 30/07/2021 - 11:33 |
Cottonlands in-situ housing development | Proposed in-situ housing development, Cottonlands, eThekwini Municipality | HIA Phase 1 | 30/04/2021 | Jean Beater | JLB Consulting | EnviroPro | 14/06/2021 - 09:54 |
SAS6986 - DBAR Appendix E (NID & RfE) | Basic Assessment Process for the Construction of a Pump Station and Pipeline for Wollie se Gat, Secunda: Notification of Intent to Develop | HIA Phase 1 | 30/04/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 10/06/2021 - 14:35 |
PIA for the proposed Beeshoek Mine Optimisation Project April 2021 | Palaeontological Impact Assessment for the proposed Beeshoek Mine Optimisation Project, just west of Postmasburg, Northern Cape Province: April 2021 | PIA Desktop | 30/04/2021 | Marion Bamford | Prof Marion Bamford | Envirogistics (Pty) Ltd | 03/03/2022 - 06:31 |
Heritage Impact Assessment (Cuchron Mine & Steamboat Beneficiation) | The Phase 1 Heritage Impact Assessment for the Cuchron Mine Development and Steamboat Beneficiation Development. | HIA Phase 1 | 30/04/2021 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | Diphororo Development (Pty) Ltd | 14/07/2021 - 10:06 |
HIA for Sable Hill Dam and Cultivation, Winterton | Phase one Heritage Impact Assessment for the proposed Sable Hill dam and cultivation of pivot lands, uThukela District Municipality, Winterton, KZN | HIA Phase 1 | 30/04/2021 | Frans Prins | Active Heritage CC | Green Door Environmental | 02/08/2021 - 15:37 |
Palaeontological Desktop | PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE ON THE FARM LIZBETH 325, JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | PIA Desktop | 30/04/2021 | Francois Durand | Francois Durand | Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD | 29/06/2021 - 16:47 |
UCD6097 - Draft EIA Appendix J (Heritage) | Environmental Authorisation for Proposed Additional Infrastructure at the Universal Coal Development III (Pty) Ltd Ubuntu Colliery, Mpumalanga Province | HIA Phase 1 | 30/04/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Universal Coal (Pty) Ltd | 10/06/2021 - 16:51 |
Development of a citrus orchard on farm Nooitgedacht 338 KQ | The development of a citrus orchard and associated facilities on portions of the farm Nooitgedacht 338KQ in the Thabazimbi local municipality of Limpopo Province | Heritage Impact Assessment Specialist Reports | 30/04/2021 | Johan van Schalkwyk | Limpopo Department of Economic Development, Environmental and Tourism | Jonk Begin Omgewings Dienste | 21/11/2021 - 22:01 |
PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE ON THE FARM LIZBETH 325, JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE ON THE FARM LIZBETH 325, JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | PIA Desktop | 30/04/2021 | Francois Durand | Francois Durand | Integrated Specialist Services (Pty) Ltd | 29/06/2021 - 17:02 |
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE, COPPER AND IRON ORE LOCATED ON REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 AND THE REMAINING EXTENT OF FARMJONES NO 595, IN THE HAY MAGISTERIA | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE, COPPER AND IRON ORE LOCATED ON REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 AND THE REMAINING EXTENT OF FARMJONES NO.595, IN THE HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 30/04/2021 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD | 29/06/2021 - 17:35 |
PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING LOCATED ON THE REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 | PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING LOCATED ON THE REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596. | PIA Phase 1 | 30/04/2021 | Francois Durand | Francois Durand | Integrated Specialist Services (Pty) Ltd | 29/06/2021 - 17:38 |
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 30/04/2021 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | TSX Mining (Pty) Ltd | 30/06/2021 - 19:48 |
PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. | PIA Desktop | 30/04/2021 | Francois Durand | Francois Durand | TSX Mining (Pty) Ltd | 30/06/2021 - 19:50 |
Heritage Impact Assessment Klipplaat Drift Farm | Phase One Heritage Impact Assessment for the proposed SHOPPING CENTRE ON PTN 51 (OF 7) FARM KLIPPLAAT DRIFT NO.1009, WEMBEZI - KWAZULU NATAL | HIA Phase 1 | 30/04/2021 | Frans Prins | Active Heritage CC | Active Heritage CC | 19/10/2021 - 15:16 |
AIA for Farm Gloria | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Expansion of the East Manganese Mine on a Portion Intersecting Portion 1 of the Farm East 207 and Portion 1 of the Farm Gloria 266, Hotazel, Northern Cape | AIA Phase 1 | 01/05/2021 | Tobias Coetzee | Tobias Coetzee | Sitatunga Resources | 14/06/2021 - 09:40 |
HIA MTHOMBOWESIZWE | HERITAGE IMPACT ASSESSMENT(HIA) FOR PROPOSED ALTERATIONS TO MTHOMBOWESIZWE SECONDARY SCHOOL | HIA Phase 1 | 01/05/2021 | JENNIFER MUKAKABYE | PLANET DEVELOPMENT SYSTEMS | DELCA SYSTEMS (PTY) LTD | 08/07/2021 - 15:44 |
New mining permit for Mattioda Collabora aggregate borrow pit | Proposed new mining permit for Mattioda Collabora aggregate borrow pit, Portion 4, Farm Lower Oaklands 16728, Illembe District Municipality, KwaZulu-Natal | HIA Phase 1 | 03/05/2021 | Jean Beater | JLB Consulting | Afzelia Environmental Consultants Pty Ltd | 14/06/2021 - 11:26 |
Inchgarth Farm HIA | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CULTIVATION OF APPROXIMATELY 50 HA OF LAND, LOCATED ON DUBLIN NO. 2 9929, INCHGARTH FARM, WITHIN THE DR NKOSAZANA DLAMINI ZUMA LOCAL AND HARRY GWALA DISTRICT MUNICIPALITY, HIMEVILLE, KWAZULU-NATAL | HIA Phase 1 | 03/05/2021 | Frans Prins | Active Heritage CC | Green Door Environmental | 02/09/2021 - 08:49 |
Phase 1 HIA for vineyard development on Farm Uitdraai in Prieska | Phase 1 Heritage Impact Assessment for establishment of a vineyard on Portion 18 (Ptn of Ptn 15) of the Farm Uitdraai No. 33, Prieska | HIA Phase 1 | 03/05/2021 | Lloyd Rossouw | Paleo Field Services | 07/06/2021 - 15:27 | |
Pedestrian bridges near Ncombo & Esikhaweni, uMhlatuze LM | Proposed pedestrian bridges near Ncombo and Esikhawini, uMhlatuze Local Municipality, KwaZulu-Natal | HIA Phase 1 | 03/05/2021 | Jean Beater | JLB Consulting | ECA CONSULTING | 21/06/2021 - 09:39 |
Public Participation Report_Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville | Public Participation Report for Section 41 Application of the KwaZulu Natal Heritage Act No 4 of 2008. Portion 3,4,5 & 68 of Erf 498 Scottsville Pietermaritzburg | Heritage Impact Assessment Specialist Reports | 03/05/2021 | Judith Muindisi | Tsica Heritage Consultants | ADOWA Property Developers | 03/05/2021 - 17:22 |
Phase 1 HIA for Farm Uitdraai no 33, Prieska | Phase 1 Heritage Impact Assessment for establishment of a vineyard on Portion 18 (ptn of pth 15) of the Farm Uitdraai No. 33, Prieska, Northern Cape Province | HIA Phase 1 | 03/05/2021 | Lloyd Rossouw | Paleo Field Services | 07/06/2021 - 16:21 | |
Public Participation Report _Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, of Erf 498 Scottsville | Public Participation Report Section 37 Application of the KwaZulu Natal Heritage Act No 4 of 2008 for the Heritage Impact Assessment Report for Portion 3 of Erf 498 Scottsville Pietermaritzburg. | Heritage Impact Assessment Specialist Reports | 03/05/2021 | Judith Muindisi | Tsica Heritage Consultants | ADOWA Property Developers | 03/05/2021 - 17:37 |
Public Participation Report_ Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville | Public Participation Report_ Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville | Heritage Impact Assessment Specialist Reports | 03/05/2021 | Judith Muindisi | Tsica Heritage Consultants | ADOWA Property Developers | 03/05/2021 - 17:54 |
PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADE AND CONSTRUCTION OF COASTAL INFRASTRUCTURE COFFEE BAY - HOLE IN THE WALL | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADE AND CONSTRUCTION OF COASTAL INFRASTRUCTURE WITHIN THE KING SABATA DALINDYEBO LOCAL MUNICIPALITY, COFFEE BAY & HOLE IN THE WALL, EASTERN CAPE. | HIA Phase 1 | 03/05/2021 | Frans Prins | Active Heritage CC | ACER (Africa) Environmental Management Consultants | 12/04/2022 - 03:24 |
Wildebeestkuil PV 2 Heritage Impact Report | DEVELOPMENT OF THE 9.9MW WILDEBEESTKUIL 1 SOLAR PV PLANT & 132KV POWER LINE, 9.9MW WILDEBEESTKUIL 2 SOLAR PV PLANT & 132KV POWER LINE AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 21/06/2021 - 13:40 |
A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FIVE FOOTBRIDGES TO VILLAGES (MONONTSHA), QWA-QWA, FREE STATE PROVINCE | A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FIVE FOOTBRIDGES TO VILLAGES (MONONTSHA), QWA-QWA, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Spatial Solutions Inc. | 25/02/2022 - 16:51 |
Leeudoringstad Substation Heritage Impact Report | PROPOSED DEVELOPMENT OF THE 132/11kV LEEUDORINGSTAD SOLAR PLANT SUBSTATION NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 21/06/2021 - 14:10 |
DEPLOYMENT OF A FIBRE NETWORK WITHIN THE SOL PLAATJE MUNICIPAL AREA | DEPLOYMENT OF A FIBRE NETWORK WITHIN THE SOL PLAATJE MUNICIPAL AREA SECTION 38: HERITAGE IMPACT ASSESSMENT SECTION 34: PROPOSED ALTERATIONS TO STRUCTURES OLDER THAN 60 YEARS (SIDEWALKS) | HIA Phase 3 | 05/05/2021 | Christine Havenga and Associates | Frogfoot Networks | 05/05/2021 - 13:33 | |
Leeuwbosch 1 Solar Plant Heritage Impact Report | DEVELOPMENT OF THE 9.9MW LEEUWBOSCH 1 SOLAR PV PLANT, 9.9MW LEEUWBOSCH 2 SOLAR PV PLANT AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 18/06/2021 - 13:42 |
Leeuwbosch 2 Solar Plant Heritage Impact Report | DEVELOPMENT OF THE 9.9MW LEEUWBOSCH 1 SOLAR PV PLANT, 9.9MW LEEUWBOSCH 2 SOLAR PV PLANT AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 18/06/2021 - 14:07 |
Wildebeestkuil PV 1 Heritage Impact Report | DEVELOPMENT OF THE 9.9MW WILDEBEESTKUIL 1 SOLAR PV PLANT & 132KV POWER LINE, 9.9MW WILDEBEESTKUIL 2 SOLAR PV PLANT & 132KV POWER LINE AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 18/06/2021 - 15:37 |
Heritage Cover Letter and Impact Assessment - Updated | Archaeological Specialist Reports | 06/05/2021 | Gavin Anderson | 06/05/2021 - 14:59 | |||
Palaeontological Cover Letter and Impact Assessment - Updated | Palaeontological Specialist Reports | 06/05/2021 | John Almond | 06/05/2021 - 15:00 | |||
Richmond Road excavation report | Excavation / recovery of skeletal remains: Farm Dwars River 372 KT, Richmond Road Project | Heritage Impact Assessment Specialist Reports | 06/05/2021 | Frans Roodt | 06/05/2021 - 15:18 |