THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16301 - 16350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA Mabaso Gravel Road | Proposed construction of 6.9km gravel road in Mabaso Village, Klip River Native Location 4665 Msinga LM, Mzinyathi District DM, KwaZulu-Natal | Heritage Scoping | 10/03/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 11/04/2017 - 11:18 |
INGLESBY 580 OLIFANTSHOEK, | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/05/2014 | Cobus Dreyer | RE A Kgona General Services CC | RE A Kgona General Services CC | 27/09/2014 - 21:35 |
Bloemsmond 5 BESS Heritage Impact Statement | HERITAGE STATEMENT – PROPOSED BATTERY ENERGY STORAGE SYSTEM FOR THE AUTHORISED BLOEMSMOND SOLAR 5 | Heritage Statement | 01/04/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Cape Environmental Assessment Practitioners | 28/06/2021 - 18:04 |
AIA_Fluorspar_Kromdraai_Kusel_U_Sep11 | Cultural Heritage Resources Impact Assessment of the proposed new Fluorspar Mine on the Farms Kromdraai 209JR and Naaupoort 208JR, Nokeng, Gauteng Province | AIA Phase 1 | 05/09/2011 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:45 | |
KHOMFINI VEHICULAR BRIDGE - PALEONTOLOGY REPORT | PALAENTOLOGY REPORT | AIA Phase 1 | 01/12/2015 | Nonhlanhla Vilakazi | Evolutionary Studies Institute | Isolendalo Environmental Consulting | 04/12/2015 - 13:13 |
Gamma Kappa 2 Scoping VIA | THE PROPOSED GAMMA KAPPA 2ND 765KV TRANSMISSION POWERLINE AND SUBSTATIONS UPGRADE, NORTHERN AND WESTERN CAPE (NEAS REFERENCE DEA/EIA/0001267/2012 DEA REFERENCE14/12/16/3/3/2/353) VISUAL IMPACT ASSESSMENT | Visual Impact Assessment | 01/01/2014 | Axis Landscape Architecture cc | Nzumbululo Heritage Solutions | 20/01/2015 - 12:14 | |
PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED SWAZILAND-MOZAMBIQUE BORDER PATROL ROAD AND MOZAMBIQUE BARRIER STRUCTURE | PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED SWAZILAND-MOZAMBIQUE BORDER PATROL ROAD AND MOZAMBIQUE BARRIER STRUCTURE | PIA Phase 1 | 05/02/2018 | Elize Butler | Royal Haskoning DHV | 16/08/2018 - 11:25 | |
PROPOSED NEW THEMBALETHU SECONDARY SCHOOL | PROPOSED NEW THEMBALETHU SECONDARY SCHOOL ON THE ERF 6925 IN THE GREATER KOKSTAD LOCAL MUNICIPALITY OF HARRY GWALA DISTRICT MUNICIPALITY IN KWAZULU-NATAL PROVINCE. | AIA Phase 1 | 20/08/2021 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 07/09/2021 - 16:30 |
Marathon 275 JT HIA | Phase 1 Archaeological and Heritage Impact Assessment on the farm Marathon 275 JT in respect of proposed agricultural development, Mbombela, Mpumalanga Province. | HIA Phase 1 | 06/09/2018 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 05/11/2018 - 20:07 |
Phase 1 AIA - Bulk Water Pipeline to the Boxwood Development, East London, BCMM, Eastern Cape | Phase 1 AIA - Bulk Water Pipeline to the Boxwood Development, East London, BCMM, Eastern Cape | AIA Phase 1 | 18/03/2020 | Karen Van Ryneveld | Sandy van der Waal | 18/03/2020 - 11:47 | |
Heritage Scoping: Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3) | Heritage Scoping Report and Letter of Exemption: Proposed Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3), Richards Bay | HIA Letter of Exemption | 15/11/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 09:57 |
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR WATER SUPPLY PIPELINE AND SEWEGE TREATMENT PLANT IN INGWAVUMA TOWN | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR PROPOSED WATER SUPPLY PIPELINE AND SEWEGE TREATMENT PLANT IN INGWAVUMA TOWN, JOZINI LOCAL MUNICIPALITY IN THE KWAZULU NATAL PROVINCE. | Heritage Impact Assessment Specialist Reports | 06/09/2013 | McEdward Murimbika | Enaq Consulting | Nzumbululo Heritage Solutions | 06/09/2013 - 11:39 |
Phase 1 AIA Heritage Screener Borrow Pits Sterkspruit Eastern Cape | PHASE 1 AIA HERITAGE SCREENER BORROW PITS STERKSPRUIT EASTERN CAPE. PROPOSED DEVELOPMENT OF BORROW PITS ALONG ROADS DR08606 AND DR08515, FARM 301 RE/88, STERKSPRUIT, SENQU LOCAL MUNICIPALITY, JOE GQABI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | Heritage Scoping | 28/06/2020 | Sky-Lee Fairhurst, Heidi Fivaz, Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Eastern Cape - Department of Transport | 05/08/2020 - 12:42 |
Palaeontological Impact Assessment for Kendal plots | Palaeontological Impact Assessment for the Section 102 amendment for Kendal Plots expansion, north of Kendal, Mpumalanga Province | PIA Phase 2 | 05/12/2022 | Marion Bamford | Amber Earth (Pty) Ltd | 07/12/2022 - 13:20 | |
HIA Ptn 29 Tweefontein 915 LS | Phase 1 Heritage Resources Scoping Report: Portion 29 of the farm Tweefontein 915 LS, proposed fuel depot and township establishment, Polokwane, Limpopo Province | Heritage Scoping | 14/02/2022 | Liesl Stegmann-Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 19/09/2023 - 12:07 |
Paleontology report for Du Plessis Dam Farm, De Aar | 12/11/2013 - 08:09 | ||||||
Thabong PIA | PALAEONTOLOGICAL ASSESSMENT OF THE PROPOSED DEVELOPMENT OF A 75MW PHOTOVOLTAIC SOLAR FARM, ON THE FARM UITKYK 509, WELKOM, FREE STATE PROVINCE. | PIA Desktop | 14/10/2013 | Gideon Groenewald | Enviroworks | 20/01/2015 - 12:23 | |
AIA_Copperton_wind_2099_Kaplan_JM_Oct11 | ARCHAEOLOGICAL IMPACT ASSESSMENT OF A PROPOSED WIND ENERGY FACILITY, POWER LINE AND LANDING STRIP IN COPPERTON, SIYATHEMBA MUNICIPALITY, NORTHERN CAPE | AIA Phase 1 | 30/10/2011 | Jonathan Kaplan, Nicholas Wiltshire | Agency for Cultural Resources Management | 16/06/2012 - 14:44 | |
HIA for the Proposed Manlenox Expansion Solar Park and the Manlenox 2 Solar Park, Kgatelopele Local Municipality, Northern Cape Province. | Heritage Impact Assessment for the Proposed Manlenox Expansion Solar Park and the Manlenox 2 Solar Park on the Farm Grootvlei 296, west of Barkley West in the Kgatelopele Local Municipality, Northern Cape Province. | AIA Phase 1 | 02/09/2016 | Marko Hutten | Hutten Heritage Consultants | AGES (PTY) Ltd - Limpopo | 14/08/2021 - 14:11 |
Phase 1 Heritage Impact Assessment Mynplaas 931 | Phase 1 Heritage Impact Assessment of an existing open pit mine on farm Mynplaas 931, Thaba Phatswa, FS Province. | HIA Phase 1 | 06/10/2022 | Lloyd Rossouw | Paleo Field Services | Golcor(PTY) LTD | 11/02/2023 - 20:54 |
Mpumalanga Parliamentary Village | Proposed Mpumalanga Parliamentary village on portion of the farm,Woodhouse 309JT,City of Mbombela Local Municipality of Ehlanzeni District | AIA Phase 1 | 03/08/2017 | Ndivhuwo Eric Mathoho | Vhufa Hashu Heritage Consultants | Vhufa Hashu Heritage Consultancy CC | 03/08/2017 - 12:24 |
Palaeontology Du Plessis PV1 | Palaeontological Specialist Study: Combined Desktop and Field-based Assessments: Proposed Photovoltaic (Solar) Energy Facilities on Du Plessis Dam Farm near De Aar, Northern Cape. | Palaeontological Specialist Reports | 15/06/2013 | John Almond | Natura Viva CC | Aurecon - Cape Town | 23/03/2015 - 17:44 |
ZINKWAZI SEPTIC TANK | SCOPING HERITAGE SURVEY OF THE ZINKWAZI MAIN BEACH – UPGRADE TO THE SEPTIC TANK | HIA Phase 1 | 30/08/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 26/10/2017 - 12:57 |
AIA FOR THE PROPOSED KYA SANDS EXTENSION 104 PROJECT, GAUTENG | AIA FOR THE PROPOSED KYA SANDS EXTENSION 104 PROJECT, GAUTENG | AIA Phase 1 | 24/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Terra Pacis Environmental (Pty) Ltd | 21/07/2016 - 09:36 |
EC-KZN Group 2 Heritage Report | Heritate assessment of Group 2 Sites of the proposed EC-KZN Afforestation EIA | Heritage Impact Assessment Specialist Reports | 20/07/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Sigwela and Associates | 17/02/2019 - 02:18 |
A report on a Heritage Impact Assessment study for the proposed residential twon on Portions 34, 250 and 319 of the farm Waterkloof 305JR, Rustenburg Local Municipality | A report on a Heritage Impact Assessment study for the proposed residential twon on Portions 34, 250 and 319 of the farm Waterkloof 305JR, Rustenburg Local Municipality | HIA Phase 1 | 02/01/2009 | Anton Pelser | Archaetnos CC | 16/06/2012 - 08:54 | |
PIA: Haalhoutbomen PV Cluster | Palaeontological Impact Assessment for the proposed Houthaalbomen PV Cluster near Lichtenburg, North West Province | PIA Phase 1 | 30/09/2021 | Marion Bamford | Savannah Environmental (Pty) Ltd | 08/02/2022 - 11:03 | |
HIA Mainstream Pofadder Wind and Solar | Scoping Heritage Impact Assessment for the Pofadder Wind and Solar Energy Facility, Kenhardt Magisterial District, Northern Cape | HIA Phase 1 | 27/07/2012 | Jayson Orton, Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 24/08/2012 - 11:26 |
Mooiplaats HIA | THE PROPOSED MOOIPLAATS COLLIERY EXPANSION, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 01/10/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 08/10/2020 - 11:28 |
Phase 1 Archaeological Assessment | Report on a Phase 1 Archaeological Assessment for a proposed Prospecting Right (bulk sampling) in the name of Misabrite (Pty) Ltd at a portion of Portion 1, Vooruitzigt-81, Kimberley, Northern Cape. | 30/11/2021 | David Morris | McGregor Museum | misabrite Pty Ltd | 19/04/2022 - 15:33 | |
St. Faiths Anglican Church. | PROPOSED ALTERATIONS AND ADDITIONS TO CHURCH AT 80 CARLISLE STREET, DURBAN. | Heritage Statement | 22/01/2014 | Rodney Harber | KwaZulu-Natal Amafa and Research Institute | Arch Urban Plan t/a Harber & Associates | 06/02/2014 - 13:55 |
HIA Report Eldorado Park Extension 6 Erf 6459 | Phase 1 Heritage Impact Assessment Report. Proposed Eldorado Park Extension 6 Housing Development – Erf 6459 within the City of Johannesburg Metropolitan Municipality. Gauteng Province. | HIA Phase 1 | 23/11/2020 | Frans Roodt | Department of Human Settlements (Provincial - Gauteng) | 30/11/2020 - 10:29 | |
Palaeo Report Greenbushes Solar PV Facility | PALAEONTOLOGICAL DESKTOP REPORT for Proposed development of a Solar PV Facility at Greenbushes, Eastern Cape | PIA Desktop | 08/10/2022 | Francois Durand | Francois Durand | CEN Integrated Environmental Management Unit | 14/04/2023 - 20:07 |
Allied Farms Solar Park Development | Heritage Impact Assessment for the Proposed Solar Park and Power Line Development on the Farm Liverpool near Koedoeskop, Limpopo Province. | HIA Phase 1 | 02/06/2015 | Marko Hutten | Hutten Heritage Consultants | Jonk Begin Omgewings Dienste | 16/06/2015 - 10:11 |
THE CONSTRUCTION OF 2X20MVA 132/22KV HOXANE SUBSTATION AND APPROXIMATELY 1.8KM LOOP-IN-LOOP-OUT (LILO) 132KV POWER LINES | A HERITAGE IMPACT ASSESSMENT STUDY FOR THE CONSTRUCTION OF 2X20MVA 132/22KV HOXANE SUBSTATION AND APPROXIMATELY 1.8KM LOOP-IN-LOOP-OUT (LILO) 132KV POWER LINES, HAZYVIEW, BUSHBUCKRIDGE LOCAL MUNICIPALITY, MPUMLANGA PROVINCE, SOUTH AFRICA | HIA Phase 1 | 27/03/2014 | Nkosinathi Godfrey Tomose | 27/03/2014 - 12:21 | ||
Rietfontein-Rietspruit Mixed Residential Development | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE DEMACATION OF RIETFONTEIN-REITSPRUIT MIXED RESIDENTIAL DEVELOPMENT ON FARMS RIETFONTEIN 152IR AND RIETSPRUIT 153 IR NEAR PALM RIDGE WITHIN EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE: GDARD Ref: Gaut (002/13-14/e0038) | AIA Phase 1 | 17/06/2015 | Ndivhuwo Eric Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 10/07/2015 - 10:35 |
AIA Lot 1768 Kakamas South | Heritage Impact Assessment of proposed sand mining in the bed of the Hartebees River on Lot 1768 Kakamas South, near Kakamas, Northern Cape. | AIA Phase 1 | 17/12/2017 | David Morris | Archaeology department, McGreggor Museum | Archaeology department, McGreggor Museum | 17/01/2018 - 07:15 |
Addendum to Platreef HIA | Heritage Impact Assessment Addendum Report: Addendum to the Environmental Impact Assessment Report for the Proposed Platreef Underground Mine, near Mokopane, Limpopo Province | Heritage Impact Assessment Specialist Reports | 31/03/2016 | Justin du Piesanie | Digby Wells Environmental | Platreef Resources (Pty) Ltd | 15/09/2016 - 14:53 |
PIA Jannelsepan, near Louisvale, Northern Cape. | Palaeontological Impact Assessment for the proposed sand mining operation farm Jannelsepan northeast of Louisvale, !Kai Garib Municipality, Northern Cape Province | PIA Desktop | 25/02/2018 | Marion Bamford | University of the Witwatersrand - Wits School of Arts | University of the Witwatersrand - Wits School of Arts | 09/04/2018 - 16:11 |
Investigation report of exposed human skeletal material for Blaauwbosch Kopia Diamonds | INVESTIGATION REPORT OF EXPOSED HUMAN SKELETAL MATERIAL DURING MINING OPERATIONS AT BLAAUWBOSCH (KOPHIA) DIAMOND MINE, BOSHOF DISTRICT, FREE STATE PROVINCE | Archaeological Specialist Reports | 14/06/2019 | Loudine Philip | National Museum: Department of Archaeology | 14/05/2019 - 11:10 | |
Makana Human settlement, Archaeology | A letter of recommendations (with conditions) for the exemption of a full Phase 1 archaeological impact assessment for the proposed Makana Human Settlement project, Alicedale, Makana local municipality, Eastern Cape Province. | AIA Phase 1 | 21/08/2012 | Johan Binneman | Eastern Cape Heritage Consultants | Public Process Consultants | 17/01/2013 - 10:25 |
Epayipini bridge HIA | DESKTOP SURVEY OF THE EPAYIPINI PEDESTRIAN BRIDGE | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 16:37 | ||
MBU5710 - HSR | Heritage Scoping Report: Proposed Weltervreden Coal Mining Project near Belfast, Mpumalanga Province | Heritage Scoping | 05/08/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Mbuyelo Group (Pty) Ltd | 05/08/2019 - 15:48 |
HIA: Msenge Emoyeni OHL | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the PROPOSED DEVELOPMENT OF A 66KV OHL FOR THE AUTHORISED MSENGE EMOYENI WIND ENERGY FACILITY, EASTERN CAPE | HIA Phase 1 | 20/06/2022 | Jenna Lavin, Nicholas Wiltshire, marion Bamford | CTS Heritage | African Clean Energy Developments (Pty) Ltd | 20/06/2022 - 10:25 |
PORTION 1 OF FARM 118, BARKLY WEST DISTRICT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~3.5 HA AREA, SOUTH-WEST OF THE GRASPAN HOMESTEAD, ON PORTION 1 OF FARM 118, LOCATED ~45 KM NORTH-EAST OF DANIËLSKUIL, BARKLY WEST MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 22/02/2013 | Peter Beaumont | McGregor Museum | De Beers Consolidated Mines - Kimberley Mines | 04/04/2013 - 12:33 |
PIA KOLOMELA AIRFIELD | PHASE 1 PIA COMPLETED IN SUPPORT OF EIA FOR THE DEVELOPMENT OF THE KOLOMELA AIRFIELD | PIA Phase 1 | 20/08/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 23/02/2021 - 13:40 |
Eternal Flame | Phase 1 Heritage Impact Assessment of a proposed new agricultural development on Kakamas South Settlement No. 2094, Augrabies, NC Province. | AIA Phase 1 | 09/08/2022 | Lloyd Rossouw | Paleo Field Services | Eternal Flame | 12/08/2022 - 14:35 |
ABO Ujekamanzi 1 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 1 near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 29/05/2023 - 16:39 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED LITTLE FISH EMBEDDED SMALL HYDRO PROJECT | A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED LITTLE FISH EMBEDDED SMALL HYDRO PROJECT IN THE BLUE CRANE ROUTE LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE | AIA Phase 1 | 29/07/2016 | Johan Binneman, Kobus Reichert | Eastern Cape Heritage Consultants | CEN Integrated Environmental Management Unit | 08/02/2017 - 09:39 |
Heritage Screener: Modderfontein Amendment | Desktop Heritage Screening Assessment for the Proposed part 2 amendment to the existing Environmental Authorisation for the Modderfontein WEF, near Victoria West located in both the Northern and Western Cape | Heritage Scoping | 25/03/2021 | Jenna Lavin | CTS Heritage | Terramanzi Group (Pty) Ltd | 09/04/2021 - 10:08 |