FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitlesort descending ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
PROPOSED CONSTRUCTION OF A FLUORIDE REMOVAL PLANT AT LAASTEHOOP PROPOSED CONSTRUCTION OF A FLUORIDE REMOVAL PLANT AT LAASTEHOOP REGIONAL WATER SCHEME: Ga-Maboi Village, POLOKWANE LOCAL MUNICIPALITY, CAPRICORN DISTRICT Heritage Statement 03/11/2015 Frans Roodt Phaki Phakanani 04/11/2015 - 09:29
AIA_Lusikisiki_SAPS_Fourie_W_Dec11 Proposed construction of a new Police Station in Lusikisik, Ingquza Local Municipality, O.R. Tambo District Municipality, Eastern Cape AIA Phase 1 02/12/2011 Wouter Fourie PGS Heritage and Grave Relocation Consultants 16/06/2012 - 14:47
Lusikisiki SAPS Proposed construction of a new police station in Lusikisiki, Ingquza Local Municipality, O.R. Tambo District Municipality, Eastern Cape AIA Phase 1 02/12/2011 Wouter Fourie PGS Heritage and Grave Relocation Consultants Terreco Environmental 17/07/2012 - 11:11
Heinrich Avenue Stormwater infrastructure PROPOSED CONSTRUCTION OF A STORMWATER NETWORK, FORMALISATION OF A NATURAL STREAM AND THE RELOCATION OF SERVICES AS NEEDED, IN KARENPARK, TSHWANE Heritage Study 28/02/2014 Johnny Van Schalkwyk National Cultural History Museum Interdesign Landscape Architects 23/04/2014 - 09:45
APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY TELECOMMUNICATIONS MAST, LETAMO ESTATE PROPOSED CONSTRUCTION OF A TELECOMMUNICATIONS MAST, LETAMO ESTATE, GAUTENG PROVINCE. APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY HIA Letter of Exemption 13/10/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Lokisa Environmental Consulting CC 13/10/2015 - 13:55
Proposed construction of access road, dam, shed and dwelling on Farm 560, Plettenberg Bay Proposed construction of access road, dam, shed and dwelling on Farm 560, Plettenberg Bay, Bitou, Western Cape Province Heritage Statement 06/02/2012 Peter Nilssen Nilssen Archaeological Resources Management bluepebble independent environmental agency CTS_329725 09/09/2015 - 12:39
HIA Dwarsug 07-01-19 Proposed Construction of an Access Road for the Dwarsrug Wind Farm, Near Loeriesfontein Phase 1 HIA Heritage Impact Assessment Specialist Reports 07/01/2019 IIan Smeyatsky PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 04/04/2019 - 15:59
MIDRAND LICENSING PROPOSED OFFICE BLOCK PROPOSED CONSTRUCTION OF AN OFFICE BLOCK ON KAALFONTEIN FARM NO 23IR PORTION 6 IN MIDRAND WITHIN THE CITY OF JOHANNESBURG HIA Letter of Exemption 06/05/2022 Leonie Marais-Botes Gauteng - Department of Agriculture and Rural Development GKM Consulting PTY LTD 06/05/2022 - 13:21
AIA_Balmoral-Florida_Sewerage_Van_Ryneveld_K_Jan11 Proposed construction of Balmoral-Florida Collector Sewerage System near Uitenhage and Despatch, Eastern Cape, South Africa AIA Phase 1 03/01/2011 Karen Van Ryneveld 16/06/2012 - 14:43
Integrated Heritage Impact Assessment for Construction of combined Dyasonsklip and Sirius Grid Connections PROPOSED CONSTRUCTION OF COMBINED DYASONSKLIP AND SIRIUS GRID CONNECTIONS ON PORTIONS OF THE FARM DYASON’S KLIP 454/ REMAINDER, FARM 638/ REMAINDER AND AGRICULTURAL HOLDING 1080, SIYANDA DISTRICT, KHAI GARIB LOCAL MUNICIPALITY, NORTHERN CAPE HIA Phase 2 18/09/2015 Stefan de Kock Perception Heritage Planning 21/09/2015 - 20:56
Cosmo Lanseria HIA PROPOSED CONSTRUCTION OF COSMO CITY/LANSERIA BULK SUPPLY PIPELINE, JOHANNESBURG, GAUTENG Heritage Impact Assessment Specialist Reports 19/12/2013 Johnny Van Schalkwyk CTS_158348 04/03/2014 - 10:18
Proposed Ezakheni AutoHub Proposed Construction of Ezakheni AutoHub on Erf 1923 Ezakheni D Section, Emnambithi-Ladysmith Municipality, UThukela District, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 27/05/2015 Frans Prins Active Heritage CC Active Heritage CC 08/06/2015 - 09:23
PROPOSED CONSTRUCTION OF HUMAN SETTLEMENTS CLUSTER 1, BELLAIR SITES A & B PROPOSED CONSTRUCTION OF HUMAN SETTLEMENTS CLUSTER 1, BELLAIR SITES A & B WITHIN THE ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. HIA Phase 1 15/09/2016 Frans Prins Active Heritage CC Triplo4 Sustainable Solutions (Pty) Ltd 17/08/2018 - 05:10
Bellair Cluster 2 PROPOSED CONSTRUCTION OF HUMAN SETTLEMENTS CLUSTER 2, BELLAIR SITES WITHIN THE ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. HIA Phase 1 17/12/2017 Frans Prins Triplo4 Sustainable Solutions (Pty) Ltd Active Heritage CC 11/01/2018 - 07:40
Chansbury Layer Poultry Houses Proposed construction of Layer Poultry Houses, Chansbury Farm, REM of Farm Vaalkranz, No. 140038, Winterton, KwaZulu-Natal HIA Phase 1 13/05/2019 Jean Beater JLB Consulting Sivest - PMB 19/08/2019 - 09:14
MANGETHE SUBSTATION PROPOSED CONSTRUCTION OF MANGETHE SUBSTATION IN MANDENI LOCAL MUNICIPALITY ,KZN Archaeological Specialist Reports 01/06/2015 McEdward Murimbika Nzumbululo Heritage Solutions Nzumbululo Heritage Solutions 22/06/2015 - 14:03
Marang B Substation and 400kV Powerline Proposed construction of Marang B - a new 3 x 500MVA 400/132kV Main Transmission Substation east of Rustenburg, North West Province PIA Desktop 15/02/2014 JF Durand Skarab CC Dynamic Integrated Geo-Environmental Services cc 17/11/2014 - 22:04
AIA_132_kV_Wilge_-_Bravo_Murimbika_M_May08 Proposed Construction of New 132 kV Powerline from Wilge Substation to Bravo Substation, Telecommunications Tower and Wilge Substation in Emalahleni Local Municipality, Nkangala District, Mpumalanga Province AIA Phase 1 01/05/2008 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:43
off take 11D PROPOSED CONSTRUCTION OF OFF TAKE 11D POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT MGIGIMBI / HANGUZA, ILEMBE DISTRICT MUNICIPALITY, KZN AIA Phase 1 29/10/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 03/11/2014 - 09:17
offtake 1b PROPOSED CONSTRUCTION OF OFF TAKE 1B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT SANS SOUCIS, ILEMBE DISTRICT MUNICIPALITY, KZN HIA Phase 1 22/01/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 18/03/2015 - 17:01
off take 5b PROPOSED CONSTRUCTION OF OFF TAKE 5B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT HYDE PARK, ILEMBE DISTRICT MUNICIPALITY, KZN AIA Phase 1 09/12/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 07/02/2015 - 11:04
Off take 6 PROPOSED CONSTRUCTION OF OFF TAKE 6 POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT SHAKAVILLE/MZUMBE TO THE LINDELANI & SIYAPHAMBILI RESERVOIRS, ILEMBE DISTRICT MUNICIPALITY, KZ AIA Phase 1 30/10/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 30/10/2014 - 09:54
off take 6b PROPOSED CONSTRUCTION OF OFF TAKE 6B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT NEW GUELDERLAND TO NEW GUELDERLAND RESERVOIR ILEMBE DISTRICT MUNICIPALITY, KZN AIA Phase 1 28/10/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 03/11/2014 - 09:00
CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 22/09/2017 Nkosinathi Godfrey Tomose BAAGI ENVIRONMENTAL CONSULTANCY 22/09/2017 - 15:38
ROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 22/09/2017 Nkosinathi Godfrey Tomose BAAGI ENVIRONMENTAL CONSULTANCY 02/10/2017 - 11:49
PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE. HIA Phase 1 22/09/2017 Nkosinathi Godfrey Tomose BAAGI ENVIRONMENTAL CONSULTANCY 02/10/2017 - 10:59
Construction of steel smelter Proposed construction of steel smelter, Colenso, Alfred Duma Local Municipality, KwaZulu-Natal HIA Phase 1 06/09/2019 Jean Beater JLB Consulting Fuze Environmental Services 13/10/2019 - 08:54
9-2-021-0014-20041209-ACRM Proposed Construction of the 132/66 kV Subdivision and Tie-In Powerlines in Romansrivier, Witzenberg Municipality AIA Phase 1 09/12/2004 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02805 16/06/2012 - 14:34
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 16/03/2022 Stephan Gaigher Tekplan Environmental 30/03/2022 - 12:30
Heuweltjies WEF Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE HEUWELTJIES WIND ENERGY FACILITY, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 14/12/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 10/01/2023 - 15:25
Karee WEF&Grid Heritage Impact Assessment Report PROPOSED CONSTRUCTION OF THE KAREE WIND ENERGY FACILITY, BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED GRID INFRASTRUCTURE, NEAR TOUWSRIVIER, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/11/2022 John E. Almond Natura Viva CC SiVEST SA (Pty) Ltd 07/12/2022 - 14:29
Klipkraal WEF 4 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 4 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 13/09/2023 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 24/09/2023 - 15:35
Klipkraal WEF 5 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 13/09/2023 Wouter Fourie PGS Heritage and Grave Relocation Consultants SiVEST SA (Pty) Ltd 24/09/2023 - 17:54
Klipkraal 5 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Scoping Report Heritage Scoping 13/09/2023 24/10/2023 - 12:25
Klipkraal 5 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Scoping Report Heritage Scoping 13/09/2023 Wouter Fourie, Nikki Mann 23/10/2023 - 14:30
Klipkraal WEF 1 Heritge Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 1, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 16/09/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:32
Klipkraal WEF 2 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 2, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 19/08/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:42
Koup 1 Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE KOUP 1 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/04/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 22/11/2021 - 13:30
Koup 1 Grid HIA PROPOSED CONSTRUCTION OF THE KOUP 1 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/04/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 29/04/2022 - 10:49
Koup 2 Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE KOUP 2 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/04/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 22/11/2021 - 16:39
Koup 2 Grid HIA PROPOSED CONSTRUCTION OF THE KOUP 2 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 30/05/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 29/04/2022 - 11:02
Kraaltjies WEF Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE KRAALTJIES WIND ENERGY FACILITY, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 14/12/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 10/01/2023 - 15:37
LEEUDORINGSTAD 132KV POWER LINE HIA PROPOSED CONSTRUCTION OF THE LEEUDORINGSTAD 132KV POWERLINE, NORTH WEST PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 08/11/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 15/12/2022 - 15:36
Limestone 1 Heritage Report Proposed Construction of the Limestone 1 - 132kV Power Line and the associated Switchyards on Portion 0 (remaining extent) of the Farm 267, Northern Cape Province 03/12/2013 Wouter Fourie PGS Heritage and Grave Relocation Consultants 16/05/2014 - 12:29
PIA Proposed Construction of the New Eskom Rethabiseng North 132/11 kV Substation and Associated Loop-in and Loop-out Powerlines in Ekangala, within the City of Tshwane Metropolitan Municipality and Thembisile Hani Local Municipality. Palaeontological Impact Assessment: Phase 1 Field Study PIA Phase 1 24/02/2017 Dr. Heidi Fourie Dr Heidi Fourie JG AFRIKA 02/03/2017 - 07:39
Patatskloof WEF&Grid Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE PATATSKLOOF WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR CERES, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/11/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 07/12/2022 - 15:18
Meyerton PIA Proposed Construction of the R59 (P156/2) Pedestrian Bridge Located Close to Sicelo Township, Meyerton, within the Midvaal Local Municipality, in the Sedibeng District Municipality, Gauteng Province PIA Desktop 05/12/2021 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Tsimba Archaeological Footprints (Pty) Ltd 10/12/2021 - 07:25
Palaeontological Impact Assessment: Phase 1: Field Study Proposed Construction of the Ventilation Shaft Access Road Seriti Coal (Pty) Ltd.: New Denmark Colliery - Palaeontological Impact Assessment: Phase 1: Field Study PIA Phase 1 11/08/2020 Dr. Heidi Fourie Dr Heidi Fourie 19/06/2020 - 14:30
Wilger 132KV Power Line Proposed Construction of the Wilger 132kV Power Line and the associated Switchyards on the Farm 267 Arriesfontein, Northern Cape Province Heritage Impact Assessment Specialist Reports 03/12/2013 Wouter Fourie PGS Heritage and Grave Relocation Consultants 16/05/2014 - 12:15
Construction of trunk sewer at Gwala Farm Proposed construction of trunk sewer at Gwala Farm, eThekwini Municipality, KwaZulu-Natal HIA Phase 1 05/03/2021 Jean Beater JLB Consulting ECA CONSULTING 04/05/2021 - 15:00