THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16451 - 16500 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
HIA Wilmar | Proposed Development Of The Proposed Edible Oil Pipeline For Wilmar Sa (pty) Ltd, From Berth 706 / 707 / 708 To Rb IDZ Phase 1a, Richards Bay | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/05/2019 - 12:45 | |
HIA Wilmar Vegetable Oil Pipeline | Proposed Development Of The Proposed Edible Oil Pipeline For Wilmar Sa (pty) Ltd, From Berth 706 / 707 / 708 To Rb IDZ Phase 1a, Richards Bay | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/05/2019 - 13:50 | |
HIA Wilmar | Proposed Development Of The Proposed Edible Oil Pipeline For Wilmar Sa (pty) Ltd, From Berth 706 / 707 / 708 To Rb IDZ Phase 1a, Richards Bay | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 21/05/2019 - 16:01 | |
STEENBOKPAN EXT 3 TOWNSHIP DEVELOPMENT | Proposed Development of the Steenbokpan Extension 3 Township on the Remainder and Portions 1, 2, 3 and 4 of the Farm Grootdoorn 292 LQ, Portions 20, 22 and 25 of the Farm Theunispan 293 LQ and Portion 3 of the Farm Steenbokpan 295 LQ at Steenbokpan, west of Lephalale in the Lephalale Local Municipality, Waterberg District, Limpopo Province. | HIA Phase 1 | 31/01/2014 | Marko Hutten | PGS Heritage and Grave Relocation Consultants | Flexilor Properties (Pty) | 03/03/2014 - 21:55 | |
Tournee 1 HIA | Proposed development of the Tournée 1 Solar PV Park near Standerton, Mpumalanga | HIA Phase 1 | 01/02/2023 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 27/03/2023 - 16:24 | |
Tournee 2 HIA | Proposed development of the Tournée 2 Solar PV Park near Standerton, Mpumalanga | HIA Phase 1 | 01/02/2023 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 27/03/2023 - 16:21 | |
ABO Ujekamanzi MTS & LILO1 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 1 LILO and MTS Infrastructure near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 20/06/2023 - 15:59 | |
ABO Ujekamanzi 1 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 1 near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 29/05/2023 - 16:39 | |
ABO Ujekamanzi MTS & LILO2 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 2 LILO and MTS Infrastructure near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 20/06/2023 - 16:16 | |
ABO Ujekamanzi 2 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 2 near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 29/05/2023 - 16:49 | |
Heritage - Upington Solar Thermal Phase 3 | Proposed Development of the Upington Solar Thermal Plant Three within Portion 3 of the Farm McTaggasrts Camp 453 near Upington, Northern Cape: Archaeological Impact Assessment | AIA Phase 1 | 28/02/2014 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 31/10/2013 - 11:09 | |
AIA - Upington Two | Proposed Development of the Upington Solar Thermal Plant Two within Portion 3 of the Farm McTaggarts Camp, West of Upington, Northern Caope: Archaeological Impact Assessment | AIA Phase 1 | 31/03/2014 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 26/08/2014 - 16:33 | |
Detailed Site Recording at 34471 | Proposed Development of the Vetlaagte infrastructure associated with the authorised PV Facilities near De Aar: Detailed Site Recording at SA03, SAHRIS ID 34471 | AIA Phase 2 | 19/04/2022 | Nicholas Wiltshire | CTS Heritage | Landscape Dynamics Environmental Consultants | 21/04/2022 - 11:34 | |
Heritage Screener_Watt PV | Proposed Development of the Watt Solar PV Facility in the Gauteng Province | HIA Letter of Exemption | 21/09/2023 | Jenna Lavin | Savannah Environmental (Pty) Ltd | 12/10/2023 - 15:01 | ||
CTS15_033 CEN Bayethe Game Lodge | Proposed development of three tented lodges within the Bayethe Tented Lodge Camp, Shamwari Game Reserve, Eastern Cape. | 21/10/2015 | Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire | CTS Heritage | CEN Integrated Environmental Management Unit | 21/10/2015 - 12:00 | ||
PROPOSED DEVELOPMENT OF TURFLOOP ACCOMMODATION | PROPOSED DEVELOPMENT OF TURFLOOP ACCOMMODATION MANKWENG, POLOKWANE LOCAL MUNICIPALITY, CAPRICORN DISTRICT | Heritage Statement | 30/10/2015 | Frans Roodt | Phaki Phakanani | 04/11/2015 - 09:19 | ||
9-2-269-0017-20070201-NHS | Proposed Development of Waste Disposal Facility (Landfill) Project at Makwilidza Village of Mutale Local Municipality, Vhembe District, Limpopo Province | AIA Phase 1 | 01/02/2007 | McEdward Murimbika | Nzumbululo Heritage Solutions | MAPID_01472 | 16/06/2012 - 14:40 | |
HIA_de_kroon_Van_Schalkwyk_JA_Oct07 | Proposed development on a portion of the farm de Kroon 444 JQ, to be known as Brits Ext. 135, in the Brits Magisterial District, North West Province | HIA Phase 1 | 01/10/2007 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_02965 | 16/06/2012 - 14:52 | |
Draft Phase 2 HIA - ERVEN 3025 AND 9795 CONSTANTIA UITSIG | PROPOSED DEVELOPMENT ON ERVEN 3025 AND 9795 CONSTANTIA: CONSTANTIA UITSIG | HIA Phase 2 | 01/10/2015 | Henry Aikman | AIKMAN ASSOCIATES HERITAGE MANAGEMENT | Meerenhof Properties (Pty) Ltd | 28/10/2015 - 09:03 | |
FARM 468 (WELMOED ESTATE), STELLENBOSCH | PROPOSED DEVELOPMENT ON PORTION 128 OF FARM 468 (WELMOED ESTATE), STELLENBOSCH, WESTERN CAPE PROVINCE | AIA Phase 1 | 01/08/2012 | Lita Webley, Dave Halkett | ACO Associates CC | CTS_368814 | 02/09/2016 - 12:05 | |
HIA for Vlakkeland Residential Development, Paarl | PROPOSED DEVELOPMENT: ERVEN 8359, 8378, 8399, Rem 8370, 8400, 12628, 12633 & 33027 PAARL HERITAGE IMPACT ASSESSMENT REPORT | HIA Phase 1 | 01/07/2014 | Cindy Postlethwayt | Guillaume Nel Environmental Consultancy | 26/09/2014 - 15:47 | ||
HIA Vlakkeland | PROPOSED DEVELOPMENT: ERVEN 8359, 8378, 8399, Rem 8370, 8400, 12628, 12633 & 33027 PAARL HERITAGE IMPACT ASSESSMENT REPORT | HIA Phase 2 | 14/10/2013 | Cindy Postlethwayt | Guillaume Nel Environmental Consultancy | 14/10/2013 - 16:00 | ||
PIA_Middelburg 400kV power line | PROPOSED DEVIATION AND RE-ALIGNMENT OF THE ESKOM 44KV POWER LINE ON THE FARM ELANDSPRUIT 291 JS PORTIONS 14 AND 35 NEAR MIDDELBURG, MPUMALANGA | PIA Phase 1 | JF Durand | Cabanga Concepts | 06/03/2013 - 15:40 | |||
9-2-092-0062-20060301-CA | Proposed Deviation to the Eskom Overberg Powerline Vryheid Substation to Riviersonderend Substation: Heritage Impact Assessment Report | AIA Phase 1 | 01/03/2006 | Hilary Deacon | MAPID_02828 | 16/06/2012 - 14:37 | ||
17 Champion Place Deviations | PROPOSED DEVIATIONS FROM APPROVED PLAN, GARAGE OMMITED, TIMBER WINDOWS TO BE REPLACED WITH ALUMINIUM | BE & CL Phase 1 | 20/04/2022 | Corne Johan Nothnagel | Cormiru Architecture & Design | 26/04/2022 - 10:35 | ||
Palaentological desk assessment Palmietfontein 208JP | Proposed diamond mining on the farm Palmietfontein 208JP near Pilanesberg, Moses Kotane Local Municipality, Bojanala District, Northwest Province | PIA Desktop | 19/09/2017 | John Almond | Natura Viva CC | Natura Viva CC | 19/09/2017 - 17:06 | |
PALAEONTOLOGICAL ASSESSMENT: DESKTOP STUDY | Proposed diamond prospecting on a Portion of Farm 21 near Pampierstad, Frances Baard District, Northern Cape Province | PIA Desktop | 25/03/2021 | John Edward Almond | Natura Viva CC | Natura Viva CC | 26/03/2021 - 18:46 | |
EIA 516 PDA EBUTLER June 2022 | PROPOSED DIAMOND PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION ON PORTION 1 OF THE FARM DOUTS DAM 142 & THE WHOLE FARM WITPAN 296, REGISTRATION DIVISION: HOPETOWN; NORTHERN CAPE PROVINCE | PIA Desktop | 01/07/2022 | 25/07/2022 - 14:09 | ||||
EIA 516 PDA EBUTLER June 2022 | PROPOSED DIAMOND PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION ON PORTION 1 OF THE FARM DOUTS DAM 142 & THE WHOLE FARM WITPAN 296, REGISTRATION DIVISION: HOPETOWN; NORTHERN CAPE PROVINCE | PIA Desktop | 01/07/2022 | 25/07/2022 - 14:20 | ||||
Dingo's Animal Kingdom | Proposed Dingo's Animal Kingdom Project, Umgungundlovu District Municipality, KwaZulu-Natal | HIA Phase 1 | 30/09/2021 | Jean Beater | JLB Consulting | Kerry Seppings Environmental Management | 22/11/2021 - 12:20 | |
CTS17_047 Ilke Nel Dolerite Mine Free State | Proposed Dolerite Mine Rights, Farm Taaiboschfontein 245, Bethlehem, Free State | 03/05/2017 | Katie Smuts, Jenna Lavin, Kyla Bluff | CTS Heritage | Ilke Nel | 03/05/2017 - 10:55 | ||
Proposed DR0281 Bridge Refurbishment | Proposed DR0281 Bridge Refurbishment | HIA Phase 1 | 13/12/2019 | Gavin McLachlan | 03/06/2020 - 16:24 | |||
Proposed Dressing Pedestrian Bridge - HIA | Proposed Dressing Pedestrian Bridge, Kwazulu-Natal, Phase 1 Heritage Impact Assessment | HIA Phase 1 | 01/01/2016 | Jean Beater | 1World Consultants (Pty) Ltd | 01/04/2016 - 09:15 | ||
Phase 1 Heritage Impact Assessment | Proposed Drilling Sites and Prospecting Trenches on the Farms De Paarl 246 KP, Goedgedacht 255 KP, Bedford 254 KP & Syferbult 257 KP, Dwaalboom Area, Bojanala District Municipality, North West Province. | HIA Phase 1 | 16/10/2018 | Polke Birkholtz | PGS Heritage (Pty) Ltd | EOH Coastal & Environmental Services (CES) - Port Elizabeth | 24/10/2018 - 12:40 | |
PIA_Droogfontein_62_DEA_2024_Almond_JE_Apr11 | Proposed Droogfontein Solar Power Project on the Farm Droogfontein 62 near Kimberley, Northern Cape Province | PIA Phase 1 | 11/04/2011 | John E Almond | Natura Viva CC | 16/06/2012 - 14:54 | ||
9-2-026-0024-19961001-AlbMus | Proposed Eastern Cape Zinc and Phosphoric Acid Project: Baseline Report: Sensitivity of Cultural Sites | AIA Phase 1 | 01/10/1996 | Johan Binneman, Lita Webley | Albany Museum | MAPID_00734 | 16/06/2012 - 14:34 | |
Taung Palaentology Report | Proposed electrification project within Taung Skull buffer zone in Buxton (Norlim), North West Province | Palaeontological Specialist Reports | 24/06/2017 | Trust Mlilo | Integrated Specialist Services | Eskom - NOU | 18/07/2017 - 10:36 | |
Emathendeni Sportsfield, Ladysmith | Proposed Emathendeni Sportsfield, Ward 29, Ladysmith, KwaZulu-Natal | HIA Phase 1 | 12/11/2018 | Jean Beater | JLB Consulting | Fuze Environmental Services | 07/01/2019 - 11:25 | |
HIA: Goliatsvlei | Proposed enlargement of Goliatsvlei dam onto Farms 8/441,9/441, RE/439 and 689, the enlargement of Wittekop dam on. Farm RE/441, the expansion of cultivated land on Farms 9/441, 1/441, RE/700 and RE/441, together with a pipeline / pumping scheme crossing various properties between the Goliatsvlei dam and a pump station in the Breede River on the farm Rooilandia No. RE/472, Worcester district. | 21/08/2020 | Jenna Lavin | Cedar Tower Services | 21/08/2020 - 13:10 | |||
Heritage Impact Assessment Eskom Aloe Substation and LILO Powerlines | PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE | HIA Phase 1 | 08/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | GA Environment (Pty) Ltd | 22/10/2020 - 10:59 | |
Heritage Impact Assessment Eskom Aloe 132kV | Proposed Eskom Aloe 132kV Substation and Loop in Loop Out Powerlines | Heritage Impact Assessment Specialist Reports | 19/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | 02/10/2020 - 10:11 | ||
Heritage Impact Assessment Eskom Aloe 132kV | Proposed Eskom Aloe Substation and Loop in Loop Out Powerlines | Heritage Impact Assessment Specialist Reports | 19/06/2020 | Vhufa Hashu Heritage Consultancy CC | 02/10/2020 - 10:16 | |||
Dutywa-Gatyana 132kV Heritage | Proposed Eskom Dutywa-Gatyana 132kV Power Line and Construction of Gatyana Substation, Mbhashe Local Municipality, Amathole District Municipality, Eastern Cape Province, South Africa | HIA Phase 1 | 04/06/2012 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | GIBB Engineering & Science - Port Elizabeth | 27/07/2012 - 15:42 | |
HIA Study for Eskom Khanyazwe/Buffelspruit | Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. | HIA Phase 1 | 27/02/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 09:52 | |
HIA Study for Eskom Khanyazwe/Buffelspruit | Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. | HIA Phase 1 | 27/02/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 09:52 | |
Hia Study for Eskom Legogote/Gutshwa Powerlines | Proposed Eskom Legogote to Gutshwa Powerlines and Substation, Mbombela Local Municipality | HIA Phase 1 | 05/04/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 11:17 | |
PROPOSED ESKOM MBAHE-MHINGA 132KV POWERLINE | PROPOSED ESKOM MBAHE-MHINGA 132KV POWERLINE FROM MBAHE SUBSTATION TO MHINGA SUBSTATION WITHIN THULAMELA LOCAL MUNICIPALITY, IN LIMPOPO PROVINCE: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT. | AIA Phase 1 | 01/07/2012 | McEdward Murimbika, Trust Mlilo | Nzumbululo Heritage Solutions | Shumani SHE Specialists | 02/10/2012 - 10:59 | |
9-2-092-0062-20060205-CA | Proposed Eskom Overberg Powerline, Vryheid Substation to Riviersonderend Substation: Heritage Impact Assessment Report | AIA Phase 1 | 05/02/2006 | Hilary Deacon | MAPID_02827 | 16/06/2012 - 14:37 | ||
9-2-253-0003-20011101-RRCRC | Proposed Eskom Overhead Power Line Palmietfontein, Ga-Mothiba, Mathibaskraal, Polokwane: Northern Province | AIA Phase 1 | 01/11/2001 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00290 | 16/06/2012 - 14:39 | |
HIA for Eskom Platreef project | PROPOSED ESKOM PLATREEF POWER LINE AND SUBSTATION PROJECT WITHIN MOGALAKWENA LOCAL MUNICIPALITY, WATERBERG DISTRICT IN LIMPOPO PROVINCE: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSESSMENT REPORT | HIA Phase 1 | 30/07/2012 | McEdward Murimbika | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 21/05/2013 - 10:58 |