FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitlesort descending ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
9-2-253-0027-20060801-NHS Proposed Eskom Powerline from Existing Middlepunt Substation to New Substation Site at Seleteng Area in Lepelle-Nkumpi Local Municipality, Limpopo Province AIA Phase 1 01/08/2006 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:39
HIA Vessel - Mokalaka 132kV Powerline and Mokalaka Substation PROPOSED ESKOM VESEL-MOKALAKA 132kV POWER LINE AND PROPOSED MOKALAKA SUBSTATION MOLOPO LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 23/05/2014 Anton van Vollenhoven Archaetnos CC Wandima Environmental Services cc CTS_168009 07/07/2014 - 12:01
Hia Warden - Vrede 88kV Powerline PROPOSED ESKOM WARDEN RURAL-VREDE MUNIC 88kV POWER LINE, PHUMELELA LOCAL MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 28/03/2014 Anton van Vollenhoven SAHRA Council Wandima Environmental Services cc 07/07/2014 - 10:23
Bon Espirange to Komsberg Heritage Study Proposed establishment of 132kV powerline between Bon Espirange and the existing Komsberg Substation in the Western and Northern Cape HIA Phase 1 22/11/2021 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 03/12/2021 - 11:08
Proposed Establishment of a 25m Mast at Edcon Trust East London Proposed Establishment of a 25m Mast at Edcon Trust East London Heritage Scoping 05/06/2018 Jenna Lavin Cedar Tower Services Enviroafrica CC 16/07/2018 - 09:39
Proposed Establishment of a 55m Mast at Coldstream Proposed Establishment of a 55m Mast at Coldstream Heritage Scoping 04/06/2018 Jenna Lavin Cedar Tower Services Enviroafrica CC 16/07/2018 - 09:16
Establishment of a Borrow Pit and Quarry PROPOSED ESTABLISHMENT OF A BORROW PIT AND QUARRY WITHIN THE ELIAS MOTSOALEDI LOCAL MUNICIPALITY OF THE SEKHUKHUNE DISTRICT MUNICIPALITY, SITUATED WITHIN THE PROVINCE OF LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 13/06/2018 Jaco van der Walt Heritage Contracts and Archaeological Consulting Afzelia Environmental Consultants Pty Ltd 04/09/2018 - 14:14
HIA Unaville Holdings 47 and 49 PROPOSED ESTABLISHMENT OF A MIXED LAND USE DEVELOPMENT ON HOLDING 47 AND 49, UNAVILLE AGRICULTURAL HOLDINGS (PROPOSED UNAVILLE EXTENSION 11), WITHIN THE JURISDICTION OF THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 01/09/2017 Leonie Marais-Botes 16/02/2018 - 16:10
Heritage Statement PROPOSED ESTABLISHMENT OF A NEW DAM ON A PORTION OF THE FARM RIETFONTEIN 594/1, SARAH BAARTMAN DISTRICT AND NELSON MANDELA BAY MUNICIPALITY Heritage Statement 09/01/2017 Stefan de Kock Perception Heritage Planning Cape Environmental Assessment Practitioners 09/01/2017 - 14:48
Proposed dam: Rietfontein 594/1, Sarah Baartman District PROPOSED ESTABLISHMENT OF A NEW DAM ON A PORTION OF THE FARM RIETFONTEIN 594/1, SARAH BAARTMAN DISTRICT AND NELSON MANDELA BAY MUNICIPALITY Heritage Statement 09/01/2017 Stefan de Kock Perception Heritage Planning Cape Environmental Assessment Practitioners 09/01/2017 - 14:48
Proposed Development of Sebokeng Ext 38 Proposed Establishment of a New Residential Township known as Sebokeng Ext. 38 on Portion 228 of the farm Houtkop 594 IQ, Sebokeng, Emfuleni Local Municipality, Gauteng Province. HIA Phase 1 10/10/2013 Polke Birkholtz, Marko Hutten PGS Heritage and Grave Relocation Consultants Enkanyini Projects 06/11/2013 - 12:22
Kanku Road Heritage Impact Assessment Proposed Establishment of a Residential Development on Portions 4 and 7 of Erf 2363, Isipingo, Kanku Road, eThekwini Municipality, KwaZulu-Natal. HIA Phase 1 24/08/2016 Frans Prins Active Heritage CC Green Door Environmental 29/11/2017 - 13:38
HIA De Rust 12 JU in Hazyview PROPOSED ESTABLISHMENT OF A TOWNSHIP ON THE REMAINDER OF PORTION 127 AND PORTION 131 OF THE FARM DE RUST 12 JU IN HAZYVIEW, MPUMALANGA PROVINCE. HIA Phase 1 30/06/2014 Christine Van Wyk Rowe SAHRA Council Zenani Properties Pty Ltd 12/08/2014 - 15:02
9-2-253-0003-20070701-NHS Proposed Establishment of Cemeteries at Kalkspruit in Aganang Local Municipality Capricorn District, Limpopo Province AIA Phase 1 01/07/2007 McEdward Murimbika Nzumbululo Heritage Solutions MAPID_01007 16/06/2012 - 14:39
New Cemetery Augrabies Proposed Establishment of new cemetery - Augrabies Settlement AIA Phase 1 26/02/2013 Cobus Dreyer Stabilis Development (Pty) Ltd 26/02/2013 - 13:37
New Cemetery Cillie Proposed establishment of new cemetery at Cillie Twonship AIA Phase 1 26/02/2013 Cobus Dreyer Stabilis Development (Pty) Ltd 26/02/2013 - 12:16
Phase 1 Heritage Resources Scoping Report PROPOSED ESTABLISHMENT OF NEW ORCHARDS, ON PORTIONS OF THE REMEAINING EXTENT OF PORTIONS 2 AND 7 OF THE FARM OLIFANTSHOEK 387 KT, NEAR BURGERFORT, LIMPOPO Heritage Scoping 02/01/2018 Shasa Heritage Consultants CC Shasa Heritage Consultants CC 15/02/2018 - 14:50
HIA Solar-Aries 400kV Power Lines Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 13/09/2013 - 14:25
HIA for Solar-Ferrum 400kV Power Line Proposed Establishment of Several Electricity Distribution Lines Within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 17/09/2013 - 20:04
CSP-Ferrum 400kV Power Line Project Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2011 Stephan Gaigher G & A Heritage Zitholele Consulting 05/12/2013 - 18:02
HIA Report for Solar-Ferrum 400kV Power Line Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province HIA Phase 1 15/04/2014 Stephan Gaigher Department of Environmental Affairs Zitholele Consulting 09/04/2014 - 07:48
AIA_ACED_De_Aar_Solar_2250_Van_der_Walt_J_Oct11 Proposed establishment of the Aced Solar Energy Facility, De Aar, Northern Cape AIA Phase 1 25/10/2011 Jaco van der Walt Heritage Contracts and Archaeological Consulting 16/06/2012 - 14:43
Eastside Junction Mixed Use Development - HIA Proposed Establishment of the Eastside Junction Mixed Use Development near Delmas, Mpumalanga Province - Heritage Impact Report Heritage Impact Assessment Specialist Reports 29/05/2014 Wouter Fourie PGS Grave Solutions Sivest - Gauteng 23/10/2014 - 09:10
HERITAGE IMPACT ASSESSMENT Proposed establishment of the Krone-Endora Diamond Mine on a Portion of the Farm Krone 104MS and a Portion of the Farm Endora66 MS near Alldays in the Limpopo Province. HIA Phase 1 14/05/2012 Stephan Gaigher G&A Heritage Management Consultants 22/04/2022 - 10:19
AIA_Medenergy_Upington_PV_Van_Schalkwyk_JA_Mar11 Proposed establishment of the Medenergy Upington PV Power Plant, //Khara Hai Local Municipality, Northern Cape Province AIA Desktop 08/03/2011 Johnny Van Schalkwyk Cultmatrix CC 16/06/2012 - 14:47
Heritage Report for NAMAKWA SEZ PROPOSED ESTABLISHMENT OF THE NAMAKWA SPECIAL ECONOMIC ZONE ON PORTION 1 OF THE FARM BLOEMHOEK 61 AND THE REMAINDER OF PORTION 57 OF THE FARM AROAMS 57, NORTHERN CAPE HIA Phase 1 05/02/2021 Arno van den Berg REC Services (Pty) Ltd. t/a Rock Environmental Consulting Leonie Marais Heritage Practitioner 29/03/2021 - 10:29
Other_Upington_Solar_Thermal_Plant_NONE_Jun10 Proposed Establishment of the Upington Solar Thermal Plant, Northern Cape 02/06/2010 16/06/2012 - 14:52
AIA_Vanguard_Solar_Van_Schalkwyk_JA_Mar11 Proposed establishment of the Vanguard Solar, Kleinbegin PV Power Plant, !Kheis Local Municipality, Northern Cape Province AIA Desktop 11/03/2011 Johnny Van Schalkwyk 16/06/2012 - 14:51
AIA_Estancia-Zamokuhle_Murimbika_M_Nov11 Proposed Estancia-Zamokuhle 30km 132 Chikadee Line in Mpumalanga Province: Archaelogical and Heritage Impact Assessment Report. AIA Phase 1 01/11/2011 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:45
AIA_Estancia-Zamokuhle_Chikadee_Murimbika_M_Dec11 Proposed Estancia-Zamokuhle 30km 132KV Chikadee Lione in Mpumalanga Province: Archaeological and Heritage Impact Assessment. AIA Phase 1 01/12/2011 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:45
Draft HIA - ERF 9795 CONSTANTIA Dams PROPOSED EXPANSION OF DAMS ERF 9795 CONSTANTIA: CONSTANTIA UITSIG SPAANSCHEMAT RIVER ROAD, CONSTANTIA DRAFT HERITAGE IMPACT ASSESSMENT REPORT HIA Phase 1 01/08/2017 Henry Aikman AIKMAN ASSOCIATES HERITAGE MANAGEMENT Meerenhof Properties (Pty) Ltd 04/09/2017 - 09:36
HIA Jagtlust Extension PROPOSED EXPANSION OF EXISTING MINING AREA INTO PORTION RE OF THE FARM ROETZ 210 IS, JAGTLUST COLLIERY, NEAR CAROLINA, ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DSITRICT MUNICIPALITY, MPUMALANGA PROVINCE Phase 1 – Heritage Impact Assessment HIA Phase 1 14/08/2015 Jennifer Kitto PGS Heritage and Grave Relocation Consultants Alegna Environmental Management (Pty) Ltd 01/03/2016 - 15:46
Expansion of Kempdale Dam Proposed expansion of Kempdale Dam, Kokstad, KwaZulu-Natal HIA Phase 1 15/04/2021 Jean Beater JLB Consulting EnviroPro 07/05/2021 - 11:38
Expansion of Kempdale Dam Proposed expansion of Kempdale Dam, Kokstad, KwaZulu-Natal HIA Phase 1 15/04/2021 Jean Beater JLB Consulting EnviroPro 08/05/2021 - 17:18
Heritage Report for the expansion of Kokosi Cemetery PROPOSED EXPANSION OF KOKOSI CEMETERY, KOKOSI SETTLEMENT, SOUTH-WEST OF FOUCHVILLE, IN THE MERAFONG LOCAL MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 15/02/2022 Johnny DEM Environmental Services and Projects MERAFONG LOCAL MUNICIPALITY 02/05/2022 - 22:45
Protea Addition Paleontological Impact Assessment PROPOSED EXPANSION OF THE AUTHORISED PROTEA SOLAR POWER PLANT ON THE REMAINING EXTENT OF THE FARM HARTSBOOM NO. 734, NALEDI LOCAL MUNICIPALITY, NORTH WEST PROVINCE. PIA Desktop 01/04/2021 John E. Almond Natura Viva CC Protea Solar Power Plant (Pty) Ltd 21/06/2021 - 13:14
HIA Kriel PROPOSED EXPANSION OF THE EXISTING KRIEL ASH DAM FACILITY, KRIEL POWER STATION, KRIEL (GA-NALA), EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 07/12/2016 Polke Birkholtz Professional Grave Solutions (Pty) Limited Aurecon - Cape Town 09/05/2017 - 13:39
Basic Assessment Report Proposed Expansion of the Parking Area at the Shaft 16 Complex, Impala Platinum Mine, Rustenburg Operation 07/09/2021 Rizqah Baker SLR Consulting (Africa) (Pty) Ltd SLR Consulting (Africa) (Pty) Ltd 07/06/2021 - 15:31
PHASE 1 AIA HERITAGE DESKTOP STUDY SKA MEERKAT NORTHERN CAPE PROPOSED EXPANSION OF THE SQUARE KILOMETRE ARRAY (SKA) MEERKAT PROJECT ON THE FARMS MEY’S DAM RE/68, BRAK PUTS RE/66, SWARTFONTEIN RE/496 & SWARTFONTEIN 2/496, IN THE KAREEBERG LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, AND THE FARMS LOS BERG 1/73 & GROOT PAARDEKLOOF RE/74, IN THE KAROO HOOGLAND LOCAL MUNICIPALITY, NAMAKWA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. AIA Desktop 14/06/2021 Heidi Fivaz UBIQUE HERITAGE CONSULTANTS 26/07/2021 - 11:26
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES Proposed exploitation of fresh and weathered dolerite from four quarry sites near Sutherland, Namaqua District Municipality, Northern Cape PIA Phase 1 01/12/2015 John Almond Natura Viva CC Site Plan Consulting 11/01/2016 - 08:22
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES Proposed exploitation of fresh and weathered dolerite from four quarry sites near Sutherland, Namaqua District Municipality, Northern Cape PIA Phase 1 23/12/2015 John Almond Natura Viva CC Site Plan Consulting 11/01/2016 - 08:27
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES Proposed exploitation of fresh and weathered dolerite from four quarry sites near Sutherland, Namaqua District Municipality, Northern Cape PIA Phase 1 21/12/2015 John Almond Natura Viva CC Site Plan Consulting 11/01/2016 - 08:30
HIA Proposed Geological Camp Demaneng PROPOSED EXPLORATION CAMP ON THE FARM DEMANENG 546, NEAR KATHU, GAMAGARA LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 14/07/2021 Polke Birkholtz PGS Heritage (Pty) Ltd PGS Heritage (Pty) Ltd 23/07/2021 - 16:21
PROPOSED EXTENSION OF AN EXISTING GRANITE QUARRY Portion 1 of Farm 814 and Remainder Farm 830, Malmesbury PROPOSED EXTENSION OF AN EXISTING GRANITE QUARRY Portion 1 of Farm 814 and Remainder Farm 830, Malmesbury HIA Phase 1 01/10/2016 Nicholas Wiltshire CTS Heritage CK Rumboll 23/09/2020 - 17:22
HIA Dakota road Proposed extension of Dakota Road, Upington HIA Phase 1 12/03/2014 Johnny Van Schalkwyk MEG Environmental Impact Studies CTS_166079 09/06/2014 - 08:27
Proposed Extension of Ga-Ramokadi-kadi, Matlala Proposed Extension of Ga-Ramokadi-kadi, Matlala. Portion of the farm Vlakfontein 588 LS, Limpopo HIA Phase 1 20/08/2013 Kamekho Consulting CC 22/11/2013 - 21:58
HIA; Proposed Extension of Hotel Accomodation PROPOSED EXTENSION OF HOTEL ACCOMMODATION: PRELIMINARY SCOPING REPORT FOR HWC COMMENT Heritage Scoping 05/03/2015 Graham Jacobs CS Design Architects Heritage Consultants 04/07/2018 - 10:29
SISHEN MINE LYLYVLED EXPANSION HIA PROPOSED EXTENSION OF MINING ACTIVITIES AND THE WIDENING O A HAUL ROAD IN THE FARM LYLYVELD 545, NEAR KATHU, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 15/11/2019 Polke Birkholtz PGS Heritage (Pty) Ltd EXM Advisory Services (Pty) Ltd 19/12/2019 - 10:03
Proposed Extension of Ilima Mining Operation PROPOSED EXTENSION OF THE MINING OPERATIONS AT THE EXISTING ILIMA COLLIERY (OLD PEMBANI COLLIERY), NEAR CAROLINA, ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 14/09/2017 Jessica Angel PGS Heritage (Pty) Ltd Ilima Coal Company (Pty) Ltd 14/08/2018 - 15:02
Manungu HIA PROPOSED EXTENSION OF THE MINING OPERATIONS AT THE EXISTING MANUNGU COLLIERY, NEAR DELMAS, VICTOR KHANYE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 J Angel PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 20/01/2020 - 10:11