FindReports

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
Pofadder 3 WEF Heritage Reports PROPOSED POFADDER WIND ENERGY FACILITY 3, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 01/03/2022 Jayson Orton ASHA Consulting(Pty) Ltd SiVEST SA (Pty) Ltd 29/03/2022 - 11:30
41032 Senekal Abstraction Heritage Impact Assessment for proposed construction of a new water abstraction facility at the Cyferfontein Dam near Senekal, Setsotso Local Municipality, FS Province. Heritage Impact Assessment Specialist Reports 01/03/2022 Lloyd Rossouw 14/07/2022 - 10:28
PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED TGME MINING PROJECT IN MPUMALANGA PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED TGME MINING PROJECT IN MPUMALANGA PIA Phase 1 01/03/2022 Elize Butler Banzai Environmental (Pty) Ltd OMI Solutions (Pty) Ltd 26/04/2022 - 08:27
HIA Report for new incline shafts and P53-1 Road Alignment Development HIA Report for new incline shafts and P53-1 Road Alignment Development Goedgevonden Colliery, Near Ogies Mpumalanga Heritage Impact Assessment Specialist Reports 01/03/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 11/08/2022 - 09:19
NID application NID application HWC 01/03/2022 05/03/2022 - 14:52
Palaeontological Impact Assessment Phase 1: Palaeontological Impact Assessment: Field Study for the Gamsberg Zinc Mine Additional Infrastructure project PIA Phase 1 02/03/2022 Dr. Heidi Fourie Dr Heidi Fourie Golder Associates 27/05/2022 - 11:21
Riekerdam PHASE 1 HIA REPORT FOR THE PROPOSED CLEARANCE OF INDIGENOUS VEGETATION FOR THE DEVELOPMENT OF A NEW PIVOT POINT AND POULTRY HOUSES ON A PORTION OF RIEKERSDAM 109JP NEAR GROOT MARICO, NORTHWEST PROVINCE HIA Phase 1 02/03/2022 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 24/03/2022 - 13:50
AIA: Kleinbosch Farm - Katie Smuts_20220307 Archaeological Impact Assessment Kleinbosch Farm 9/1576, Dal Josaphat HWC Ref: 21091320SB1004E Katie Smuts of Rennie Scurr Adendorff for Malherbe Rust Architects AIA Phase 2 03/03/2022 Katie Smuts Malherbe Rust Architects 23/03/2022 - 15:43
HIA for the proposed Bethal – Emzinoni 88kV Heritage Impact Assessment (HIA) for the proposed construction of a 38kV powerline from an existing substation situated on the northern outskirts of Bethal to a substation to be built at Emzinoni Township south of Bethal HIA Phase 1 04/03/2022 Edward Matenga Mbofho Consulting and Project Managers CRRENEWABLES PTY LTD 11/05/2022 - 00:08
Heritage Screener: San Solar, Kathu Desktop Heritage Screening Assessment for the Proposed San Solar PV Facility and Associated Infrastructure, Northern Cape Province HIA Letter of Exemption 04/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 16/03/2022 - 09:43
AIA/HIA for proposed development of chicken broilers on portion of portion 20 of the Farm Schoonoord 164 IS. PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED CHICKEN BROILER (FARM) DEVELOPMENT ON PORTION 20 OF THE FARM SCHOONOORD 164 IS, SITUATED IN THE MAGISTERIAL DISTRICT OF MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY IN MPUMALANGA PROVINCE. HIA Phase 1 04/03/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Singo Consulting (Pty) Ltd 05/04/2022 - 10:39
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEVERLY SERVICE STATION ON ERF 1188, PORTION 0 IN BEVERLY EXTENSION 64, WITHIN THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE. HIA Phase 1 05/03/2022 Mokgadi's Environmental and Water Systems 03/06/2022 - 11:48
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEVERLY SERVICE STATION PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEVERLY SERVICE STATION ON ERF 1188, PORTION 0 IN BEVERLY EXTENSION 64, WITHIN THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE. HIA Phase 1 05/03/2022 Trust Mlilo Gauteng - Department of Agriculture and Rural Development Mokgadi's Environmental and Water Systems 31/05/2022 - 15:59
Gubenxa irrigation HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DAMS AND ORCHARDS FOR THE GUBENXA VALLEY, E. CAPE HIA Phase 1 05/03/2022 Gavin Anderson, Alan Smith Umlando: Archaeological Surveys & Heritage Management Indwe Environmental Consulting 09/03/2022 - 10:46
Palaeontological Impact Assessment for the proposed Roan PV 1 and 2 facilities, Hartbeesfontein, North West Province Palaeontological Impact Assessment for the proposed Roan PV 1 and 2 facilities, Hartbeesfontein, North West Province PIA Desktop 06/03/2022 Marion Bamford Prof Marion Bamford Cape Environmental Assessment Practitioners 11/05/2022 - 08:05
Imbali student accommodation and retail shops development Imbali student accommodation and retail shops development, Imbali, uMsunduzi Local Municipality, KwaZulu-Natal HIA Phase 1 07/03/2022 Jean Beater JLB Consulting 12/03/2022 - 13:18
Proposed Botterblom Wind Energy Facility Northern Cape Province, South Africa Proposed Botterblom Wind Energy Facility Northern Cape Province, South Africa HIA Phase 1 07/03/2022 Jaco van der Walt Beyond Heritage Enviro-Insight CC 09/03/2022 - 10:16
Kuruman Road Heritage Report Kuruman Road Heritage Report AIA Phase 1 09/03/2022 Loïc Segalen Crane Registered Quantity Surveyors Crane Registered Quantity Surveyors 10/03/2022 - 14:13
PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR The proposed Prospecting Right combined with a Waste Licence application to prospect for Diamonds Alluvial (DA), Diamonds General (D) and Diamonds in Kimberlite (DK) on the Remaining Extent, Portion 1, Portion 2, and Portion 3 (Boorwater) of the farm Bultfontein 327, Registration Division: Hay, Northern Cape Province. PIA Desktop 10/03/2022 Elize Butler Banzai Environmental (Pty) Ltd 30/03/2022 - 10:24
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS IN KIMBERLITE (DK) ON THE REMAINING EXTENT, PORTION 1, PORTION 2 AND PORTION 3 (BOORWATER) OF THE FARM BULTFONTEIN 327, REGISTRATION DIVISION: HAY, NORTHERN CAPE PROVINCE HIA Phase 1 10/03/2022 Johnny van Schalkwyk 30/03/2022 - 10:26
HIA: Great Karoo Grid HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed Grid Connection Infrastructure for the Great Karoo Wind Energy Facility development near Richmond in the Northern Cape HIA Phase 1 11/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 23/05/2022 - 09:11
Heritage Impact Assesment Heritage Impact Assessment for New Surface Infrastructure at United Manganese Kalahari, Hozatel Northern Cape Province Heritage Impact Assessment Specialist Reports 11/03/2022 Jaco van der Walt HCAC Heritage Consultants SLR Consulting (Africa) (Pty) Ltd 25/03/2022 - 11:07
Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Surface Infrastructure changes at the UMK Mine on Farm Botha 313, the Remaining Extent (Re) of the Farm Smartt 314, and Portion 1 and Remaining Extent (RE) of the Farm Rissik 330, Northern Cape Province Palaeontological Specialist Reports 11/03/2022 Marion Bamford Wits Archaeology Consulting (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 25/03/2022 - 11:11
Balkfontein - Doornhoek PIA Palaeontological Impact Assessment for the proposed Balkfontein-Doornhoek 11 kV powerline, west of Bothaville, Free State Province PIA Phase 2 11/03/2022 Marion Bamford University of the Witwatersrand - Wits School of Arts University of the Witwatersrand - Wits School of Arts 13/04/2022 - 15:59
Heritage Screener: Ummbila Emoyeni REF Desktop Heritage Screening Assessment for the UMMBILA EMOYENI RENEWABLE ENERGY WIND AND SOLAR PV FACILITIES, MPUMALANGA PROVINCE Heritage Scoping 11/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 16/05/2022 - 10:53
Eskom Duvha Stormwater Ditch Exemption letter ESKOM DUVHA POWER STATION: STORMWATER V-DITCH -Exemption from a Phase 1 Heritage Assessment HIA Letter of Exemption 13/03/2022 Jaco van der Walt Beyond Heritage Setala Environmental 13/03/2022 - 09:34
Botshabelo HIA PHASE 1 HIA REPORT RELATED TO THE PROPOSED TOWNSHIP FOR THE PROPOSED TOWNSHIP DEVELOPMENT ON ERF 77, ERF 1689, ERF 169, AND THE REMAINDER OF BOTSHABELO 826 IN THE MANGAUNG METRO MUNICIPALITY OF THE FREE STATE PROVINCE. HIA Phase 1 13/03/2022 Anton Pelser, Annlin Matabane APELSER ARCHAEOLOGICAL CONSULTING 14/03/2022 - 09:35
Riekersdam PHASE 1 HIA REPORT FOR THE PROPOSED CLEARANCE OF INDIGENOUS VEGETATION FOR THE DEVELOPMENT OF A NEW PIVOT POINT AND POULTRY HOUSES ON A PORTION OF RIEKERSDAM 109JP NEAR GROOT MARICO, NORTHWEST PROVINCE HIA Phase 1 14/03/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING AB Enviro Consult CC 28/04/2022 - 14:27
Heritage Screener: Carolus PV Desktop Heritage Screening Assessment: Development of the Carolus Solar PV1 Facility and associated Grid Connection Infrastructure near De Aar, Northern Cape Province Heritage Scoping 14/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 13/04/2022 - 10:27
Heritage Screener: Fountain Solar PV1 Desktop Heritage Screening Assessment for the Developments of the Fountain Solar PV1 Facility and associated Grid Connection Infrastructure near De Aar, Northern Cape Province Heritage Scoping 14/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 13/04/2022 - 10:29
Heritage Screener: Riet Fountain PV Desktop Heritage Screening Assessment for the proposed Development of the Riet Fountain Solar PV1 Facility and associated Grid Connection Infrastructure near De Aar, Northern Cape Province Heritage Scoping 14/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 13/04/2022 - 10:33
Heritage Screener: Wagt Solar PV Desktop Heritage Screening Assessment for the proposed Development of the Wagt Solar PV1 Facility and associated Grid Connection Infrastructure near De Aar, Northern Cape Province Heritage Scoping 14/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 13/04/2022 - 10:35
DUB01 and DUB02 - Destruction Monitoring report Report on the monitoring of the destruction of site DUB001 and DUB 001 under Permit Nr. 17306 as issued by Amafa Archaeological Permit Report 14/03/2022 Wouter Fourie PGS Heritage (Pty) Ltd Dube Trade Port Corporation 17/03/2022 - 06:27
HIA TWEEFONTEIN 915 LS Portion 181 Updated report. Heritage Impact Assessment Scoping Report. Township Establishment on Portion 181 of the Farm Tweefontein. Polokwane Municipality, Limpopo Province. Heritage Scoping 15/03/2022 Frans Roodt 15/03/2022 - 11:54
Smero human settlements project Smero human settlements project, uMsunduzi Local Municipality, KwaZulu-Natal HIA Phase 1 15/03/2022 Jean Beater JLB Consulting SPHE Consulting Services 05/04/2022 - 17:03
Bioarchaeology of Late Iron Age individuals and labourers from the mineral revolution Bioarchaeology of Late Iron Age individuals and labourers from the mineral revolution Export Permit Report 15/03/2022 Linda Mbeki University of Pretoria University of Pretoria 15/03/2022 - 11:59
HIA: Becrux PV 2 Heritage Impact Assessment for the Proposed development of a solar photovoltaic (PV) energy facility and associated infrastructure with a generation capacity of up to 10MWac, located near Sasolburg in the Free State Province HIA Phase 1 15/03/2022 Jenna Lavin, Heidi Fivaz, marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 04/04/2022 - 14:32
HIA for Proposed Schoemanskloof R539 Improvement Project, Mpumalanga Heritage Impact Assessment required under Section 38(8) if the NHRA, 1999 (Act 25 of 1999) for the Proposed Schoemanskloof Route R539 Improvement Project, Mpumalanga HIA Phase 1 15/03/2022 Jaco van der Walt Beyond Heritage Prism Environmental Management Services cc 30/03/2022 - 11:22
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT The Proposed Wildfontein Coal Mining Development on a Portion of the Remaining Extent of the Farm Wildfontein 420 JS, District Middelburg, Mpumalanga AIA Phase 1 15/03/2022 Tobias Coetzee 15/03/2022 - 09:38
Hoogland 1 Wind Farm and Hoogland 2 Wind Farm Heritage Report HERITAGE IMPACT ASSESSMENT: PROPOSED HOOGLAND 1 WIND FARM AND HOOGLAND 2 WIND FARM, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE Heritage Impact Assessment Specialist Reports 15/03/2022 Jayson Orton ASHA Consulting(Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 22/03/2022 - 13:39
Newmarket Housing HIA Final Report Newmarket Social Housing and Mixed Use Development Integrated Phase 1 Heritage Impact Assessment: Newmarket Housing Development, Newmarket Street, Woodstock, Erf 14888-0-1 HIA Phase 1 15/03/2022 Katie Smuts, Mike Scurr, Wendy Wilson, Claire Abrahamse, Amy Feng Rennie Scurr Adendorff GladAfrica Consulting (Pty) Ltd 15/03/2022 - 11:33
Heritage Assessment for Klipspruit PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for The Proposed Uitkomst Colliery (Pty) Ltd: Klipspruit Project on a Portion of Portion 23 of the Farm Klipspruit 178, near Newcastle, KwaZulu-Natal AIA Phase 1 16/03/2022 Tobias Coetzee Tobias Coetzee 19/07/2022 - 11:11
HIA Phase 2: Kleinbosch Farm, Farm 1576/9, Dal Josaphat Kleinbosch, Farm 1576, Dal Josaphat, Paarl Development of historic farm werf and new agricultural werf Heritage Impact Assessment Phase 2 Section 38(1)(a) HIA Phase 2 16/03/2022 Anne-Marie Fick Malherbe Rust Architects 23/03/2022 - 15:26
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 16/03/2022 Stephan Gaigher Tekplan Environmental 30/03/2022 - 12:30
Heritage Screener: Wolf WEF Access Road Desktop Heritage Screening Assessment for the Proposed development of an Access Road for the approved Wolf WEF in the Cacadu Region, Eastern Cape HIA Letter of Exemption 17/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 12/04/2022 - 10:14
HIA: Red Sands PV 1 HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Red Sands PV 1 Facility in the Northern Cape HIA Phase 1 17/03/2022 Jenna Lavin, Nicholas Wiltshire, marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 08/04/2022 - 10:42
Botterblom WEF Heritage Impact Assessment Heritage Impact Assessment for the Proposed Botterblom Wind Energy Facility Heritage Impact Assessment Specialist Reports 17/03/2022 Jaco van der Walt Beyond Heritage Enviro-Insight CC 17/06/2022 - 11:01
HIA: Red Sands PV 2 HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Red Sands PV 2 Facility in the Northern Cape HIA Phase 1 17/03/2022 Jenna Lavin, Nicholas Wiltshire, Marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 08/04/2022 - 10:52
Msimango Way pedestrian bridge Msimango Way pedestrian bridge, eThekwini Municipality, KwaZulu-Natal Heritage Statement 17/03/2022 Jean Beater JLB Consulting EnviroPro 23/04/2022 - 16:44
Botterblom Heritage Impact Assessment Heritage Impact Assessment for the Proposed Botterblom Wind Energy Facility, Northern Cape Province, South Africa HIA Phase 1 17/03/2022 Jaco van der Walt Beyond Heritage Enviro-Insight CC 15/06/2022 - 11:14

Pages

CSV
 
 

Search form