THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16801 - 16850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Proposed In-Situ Housing Upgrade in Amatikwe, KwaZulu-Natal | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed In-Situ Housing Upgrade of Approximately 3500 Low Income Houses in Amatikwe Phase 2 and Phase 3, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 12/04/2020 | Francois Coetzee | Francois P Coetzee | Asande Projects | 12/04/2020 - 17:33 | |
Proposed Infrastructure Development at the Goedehoop North Mini-Pit | AIA Phase 1 | 14/07/2015 | Jaco van der Walt | Prism Environmental Management Services cc | Jones & Wagener Engineering and Environmental Consultants | 18/08/2015 - 12:02 | ||
Proposed infrastructure development at the Goedehoop North Mini-Pit. | Archaeological Impact Assessment for the proposed infrastructure development at the Goedehoop North Mini-Pit, Middelburg Wolvekrans Complex, Mpumalanga Province. | AIA Phase 1 | 14/07/2015 | Jaco van der Walt | Prism Environmental Management Services cc | Jones & Wagener Engineering and Environmental Consultants | 18/08/2015 - 11:49 | |
Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1 | Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/06/2016 | Marko Hutten | Hutten Heritage Consultants | Tekplan Environmental | 07/07/2016 - 18:01 | |
Proposed installation of rooftop PV panels, Sexton's House, Evangelical Lutheran Church | 22/10/2020 | Louise van Riet | 22/10/2020 - 12:02 | |||||
Proposed Internal Additions and Alterations to 288 Florida road, Windermere | Proposed Internal Additions and Alterations to 288 Florida road, Windermere. Internal balcony and ablutions including additional parking | Built Environment and Cultural Landscapes | 30/11/2022 | Craig Gordon Watson | Florida Harvest | 30/11/2022 - 12:00 | ||
Proposed IPMA Greytown Poultry and Abattoir Project | Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed IPMA Greytown Poultry and Abattoir Project, within Remainder of Portion 26 of the Farm Welgegund 1099FT, Greytown; Umzinyathi District Municipality KwaZulu-Natal (DEDTEA Ref.DC24/0003/2016) | HIA Letter of Exemption | 18/08/2016 | Len van Schalkwyk | eThembeni Cultural Heritage | iSambulo Environmental Consulting | 25/08/2016 - 10:33 | |
PROPOSED IVY PARK EXT. 24 TOWNSHIP ESTABLISHMENT LOCATED ON PORTIONS 392, 393, 395 AND THE REMAINDER OF PORTION 220 OF THE FARM STERKLOOP 688-LS IN THE POLOKWANE LOCAL- AND CAPRICORN DISTRICT MUNICIPALITIES OF THE LIMPOPO PROVINCE. | PROPOSED IVY PARK EXT. 24 TOWNSHIP ESTABLISHMENT LOCATED ON PORTIONS 392, 393, 395 AND THE REMAINDER OF PORTION 220 OF THE FARM STERKLOOP 688-LS IN THE POLOKWANE LOCAL- AND CAPRICORN DISTRICT MUNICIPALITIES OF THE LIMPOPO PROVINCE. | HIA Phase 1 | 26/10/2022 | Stephan Gaigher | Tekplan Environmental | 08/11/2022 - 09:43 | ||
Proposed K33/ K52 Road Intersection Development | HERITAGE IMPACT ASSESSMENT REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) PROPOSED K33/ K52 ROAD UPGRADE AND INTERSECTION DEVELOPMENT, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG | Heritage Impact Assessment Specialist Reports | 13/05/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Heritage Contracts and Archaeological Consulting | 14/08/2018 - 14:59 | |
Proposed Kliprivier Estate - Midvaal | Proposed Kliprivier Estate Project. | PIA Desktop | 25/02/2016 | Dr Heidi Fourie | Zotec Developments (Pty) Ltd | 27/02/2016 - 10:22 | ||
PROPOSED KUDUBE/RAMOTSE STORM WATER DRAINAGE SYSTEM | PROPOSED KUDUBE/RAMOTSE STORM WATER DRAINAGE SYSTEM UPGRADE, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 10/01/2013 | Johnny Van Schalkwyk | Interdesign Landscape Architects | Interdesign Landscape Architects | 24/06/2013 - 16:24 | |
Proposed Latrodex Pty (Ltd) Heritage Impact Report | Heritage Impact Report for inclusion in the Environmental Impact report for the Proposed Latrodex Wind Turbines, Great Kei Local Municipality, located within the Amathole District Municipality, Eastern Cape Province. | Heritage Impact Assessment Specialist Reports | 24/04/2020 | Jessica Angel, M Hutten, W Fourie | PGS Heritage (Pty) Ltd | 22/08/2022 - 14:48 | ||
Proposed Lephalale Coal and Power Project (LCPP) near Lephalale, | Heritage Impact Report for the proposed Lephalale Coal and Power Project (LCPP) near Lephalale, Lephalale Local Municipality, Waterberg District, Limpopo Province | HIA Phase 1 | 26/06/2017 | Wouter Fourie | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 24/11/2017 - 10:10 | |
PROPOSED LETHABONG PROVINCIAL HOSPITAL DEVELOPMENT ON THE REMAINING EXTENT OF FARM QUAGGASFONTEIN ALIAS LAPDOORN 548 IQ, SEBOKENG, VEREENIGING. | First phase heritage impact assessment for the LETHABONG HOUSING DEVELOPMENT (contract no 19080) in Sebokeng. | HIA Phase 1 | 30/01/2023 | Sidney Miller | Sidney Miller | 09/12/2022 - 10:23 | ||
Proposed Letter of Exemption construction of a telecommunication mast on the Farm Klipheuwel 291 | ARCHAEOLOGICAL HERITAGE: PROPOSED LETTER OF EXEMPTION FROM FURTHER SPECIALIST STUDIES & MITIGATION. PROPOSED CONSTRUCTION OF A 35M HIGH TELECOMMUNCATION MAST ON PORTION 62 OF THE FARM KLIPHEUVEL 291, JOUBERTINIA RD, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE | HIA Letter of Exemption | 05/11/2021 | Alan Smith | Enviroafrica CC | 05/11/2021 - 15:16 | ||
Proposed limestone mining on the farms Buffelskraal 554 KQ Portion1 and Krokodilkraal 545 KQ, Limpopo Province | PALAEONTOLOGICAL REPORT in support of Proposed limestone mining on the farms Buffelskraal 554 KQ Portion1 and Krokodilkraal 545 KQ, Limpopo Province | Palaeontological Specialist Reports | 10/09/2013 | JF Durand | Skarab CC | African Litany cc | 13/09/2013 - 10:34 | |
Proposed Loeriesfontein 70MW PV Plant | HERITAGE IMPACT ASSESSMENT: PROPOSED LOERIESFONTEIN PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 5 OF THE FARM KLEIN ROOIBERG 227, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/05/2012 | Lita Webley | ACO Associates CC | Digby Wells Environmental | 17/08/2015 - 09:56 | |
Proposed Low Income Housing Project Noenieput, Groot Mier Municipality, Northern Cape | Heritage Impact Assessment Report Proposed Low Income Housing Project Noenieput, Groot Mier Municipality, Northern Cape. | Heritage Impact Assessment Specialist Reports | 30/10/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 21/05/2015 - 13:53 | |
Proposed Macadamia Processing Plant Darnall | Application for HIA Exemption Proposed Macadamia Processing Plant Proposed Sub of Portion 5 of the Farm Prospect Three No. 17875, Darnall KwaDukuza LM, Ilembe DM, KwaZulu-Natal | HIA Letter of Exemption | 21/05/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | Sustainable Development Projects CC | 04/06/2018 - 03:00 | |
Proposed Malelane Safari Lodge HIA | Heritage impact assessment for the Proposed Hotel Development, Malelane Gate, Kruger National Park, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 06/02/2015 | Johann van Schalkwyk | JA van Schalkwyk Heritage Consultant | Malelane Safari Resort Investment (Pty) Ltd | 04/03/2015 - 10:39 | |
PROPOSED MANGOSUTHU HOUSING DEVELOPMENT, PAULPIETERSBURG, KWAZULU-NATAL PROVINCE | PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED MANGOSUTHU HOUSING DEVELOPMENT, PAULPIETERSBURG, KWAZULU-NATAL PROVINCE, REPUBLIC OF SOUTH AFRICA. | Nkosinathi Godfrey Tomose | 15/06/2015 - 14:20 | |||||
Proposed Maritime School of Excellence | Proposed Maritime School of Excellence, eThekwini Metropolitan Municipality, KwaZulu-Natal | Heritage Scoping | 23/03/2021 | Jean Beater | JLB Consulting | Nemai Consulting | 07/04/2021 - 17:22 | |
Proposed Masterplan at DUT- Ph2 HIA Revised | Proposed Masterplan at Durban University of Technology : Phase 2-Heritage Impact Assessment of Structures | HIA Phase 2 | 09/11/2021 | Lindsay Napier | Lindsay Napier Architect | Durban University of Technology | 13/07/2021 - 20:34 | |
Proposed Mbhele Pedestrian Bridge - HIA | Proposed Mbhele Pedestrian Bridge, KwaZulu-Natal, Phase 1 Heritage impact Assessment | HIA Phase 1 | 01/01/2016 | Jean Beater | 1World Consultants (Pty) Ltd | 01/04/2016 - 10:58 | ||
Proposed Mhlopheni Road Upgrade | Proposed Mhlopheni Road Upgrade:HIA & PIA | HIA Phase 1 | 02/05/2017 - 11:44 | |||||
Proposed Midbrak Main Sewer Pipeline, Great Brak River, Mossel Bay | Proposed Midbrak Main Sewer Pipeline, Great Brak River, Mossel Bay, Western Cape Province | Heritage Statement | 05/03/2012 | Peter Nilssen | Nilssen Archaeological Resources Management | Cape Environmental Assessment Practitioners | CTS_329672 | 08/09/2015 - 11:15 |
Proposed Mining at two borrow pits south of Phillipstown, Northern Cape | Desktop Heritage Impact Assessment: Proposed mining of two borrow pits on the remainder of farm Enkeldebult 150, south of Phillipstown, Northern Cape | HIA Phase 1 | 15/02/2016 | Lita Webley | TBL Consulting | TBL Consulting | 15/02/2016 - 13:13 | |
Proposed Mining at two borrow pits south of Phillipstown, Northern Cape | Desktop Heritage Impact Assessment: Proposed mining of two borrow pits on the remainder of farm Enkeldebult 150, south of Phillipstown, Northern Cape | HIA Phase 1 | 15/02/2016 | Lita Webley | TBL Consulting | TBL Consulting | 15/02/2016 - 13:13 | |
Proposed Mining on a Portion of Erf 1, Windsorton, Northern Cape | Heritage Impact assessment of proposed mining on a Portion of Erf 1, Windsorton, Northern Cape. (NC30\5\1\2\10635MP) | HIA Phase 1 | 31/03/2021 | David Morris, Abenicia Henderson | 31/03/2021 - 13:42 | |||
Proposed mixed development at Ezakheni D, Alfred Duma Local Municipality | Proposed mixed development at Eazakeni D, Alfred Duma Local Municipality, KwaZulu-Natal | HIA Phase 1 | 11/09/2017 | Jean Beater | JLB Consulting | SPHE Consulting Services | 26/09/2017 - 08:35 | |
PROPOSED MIXED USE DEVELOPMENT IN KATHU, NORTHERN CAPE PROVINCE | HERITAGE IMPACT ASSESSMENT PROPOSED MIXED USE DEVELOPMENT IN KATHU, NORTHERN CAPE PROVINCE Remainder & Portion 1 of the Farm Sims 462, Kuruman RD | Heritage Impact Assessment Specialist Reports | 30/06/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 03/07/2014 - 15:22 | |
PROPOSED MIXED USED DEVELOPMENT ON PORTIONS OF KNOPJESLAAGTE 385JR | REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR PROPOSED MIXED USED DEVELOPMENT ON PORTIONS OF THE ORIGINAL FARM KNOPJES (KNOPPIES) LAAGTE 385JR NORTH-EAST OF DIEPSLOOT, TIMSRAND AH, GAUTENG - APAC018/67 | HIA Phase 1 | 03/09/2018 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Nali Sustainability Solutions (Pty) Ltd | 04/09/2020 - 11:29 | |
Proposed Moletjie Regional Water Scheme | Proposed Moletjie Regional Water Scheme Polokwane Local Municipality, Limpopo Province Cultural Heritage Scoping Report | Heritage Impact Assessment Specialist Reports | 06/09/2006 | Vhufa Hashu Heritage Consultants | Dynamic Integrated Geo-Environmental Services cc | 20/05/2015 - 16:37 | ||
Proposed Montana Park Ext 127 Pretoria | Phase 1 Heritage Impact Assessment for the proposed Montana Park Ext 127 Pretoria | HIA Phase 1 | 01/05/2013 | Johnny Van Schalkwyk | National Cultural History Museum | Interdesign Landscape Architects | 13/08/2013 - 13:35 | |
PROPOSED MPUPHUSI RIVER SAND WINNING PROJECT, NONGOMA LOCAL MUNICIPALITY, ZULULAND DISTRICT, KWAZULU-NATAL | PROPOSED MPUPHUSI RIVER SAND WINNING PROJECT, NONGOMA LOCAL MUNICIPALITY, ZULULAND DISTRICT, KWAZULU-NATAL | HIA Phase 1 | 31/07/2018 | Jean Beater | JLB Consulting | Enviroedge | 01/08/2018 - 15:00 | |
Proposed Msholozi/Phumlani Pipeline and Upgrade of Rocky Drift WWTW | Phase 1 Cultural Heritage Impact Assessment: The Proposed Msholozi/Phumlani Sewer Pipeline and Expansion of the Waste Water Treatment Works (WWTW) in the Rocky Drift Region North of Mbombela, Mpumalanga Province | HIA Phase 1 | 30/11/2020 | J.A. van Schalkwyk | 18/12/2020 - 08:40 | |||
Proposed Name Change of the Afrikaans Language Monument / Afrikaanse Taalmonument (ATM), Paarl, Western Cape | Proposed Name Change of the Afrikaans Language Monument / Afrikaanse Taalmonument (ATM), Paarl, Western Cape | 05/06/2022 | Karen Van Ryneveld | 05/06/2022 - 11:16 | ||||
Proposed new 15Ml concrete reservoir, Lenasia South | HIA Phase 1 | 10/11/2014 | Jean Beater | Nemai Consulting | Johannesburg Water SOC Limited | 06/02/2015 - 17:02 | ||
Proposed new 15Ml concrete reservoir, Lenasia South | HIA Phase 1 | 10/11/2014 | Jean Beater | Nemai Consulting | Johannesburg Water SOC Limited | 06/02/2015 - 17:02 | ||
Proposed new aboveground Diesel Depot on Plot 1/42 Estoire | Exemption from Phase 1 Heritage Impact Assessment: Proposed new aboveground Diesel Depot on Plot 1/42 Estoire, Bloemfontein Free State Province. | HIA Letter of Exemption | 12/03/2020 | Lloyd Rossouw | 17/03/2020 - 11:17 | |||
Proposed new borrow pit near Ludeke, EC Province. | Phase 1 Palaeontological Impact Assessment of a proposed new borrow pit near Ludeke, EC Province. | PIA Phase 1 | 23/08/2013 | Lloyd Rossouw | Control Civil Services cc | 26/08/2013 - 10:30 | ||
Proposed New City Hall Distributer Substation | PERMIT APPLICATION FOR A NEW ELECTRICAL DISTRIBUTER SUBSTATION FOR THE DURBAN CITY HALL - LOCATED AT 234/263 DR. PIXLEY KESAME STREET | 02/11/2021 | Somakanthen Moghambaram Govender | Artek 4 Architects (KZN) CC | Artek 4 Architects (KZN) CC | 02/11/2021 - 12:03 | ||
Proposed New City Hall Distributer Substation | PERMIT APPLICATION FOR A NEW ELECTRICAL DISTRIBUTER SUBSTATION FOR THE DURBAN CITY HALL - LOCATED AT 234/263 DR. PIXLEY KESAME STREET. | 02/11/2021 | Somakanthen Moghambaram Govender | Artek 4 Architects (KZN) CC | Artek 4 Architects (KZN) CC | 02/11/2021 - 14:42 | ||
Proposed new dams (2) on the remaining extent of the farm Letaba Estates 525-LT, near Tzaneen, Limpopo | Phase 1 Heritage Resources Scoping Report: Proposed new dams (2) on the remaining extent of the farm Letaba Estates 525-LT, near Tzaneen, Limpopo | HIA Phase 1 | 01/08/2017 | Frans Roodt, Liesl Stegmann-Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 15/11/2017 - 16:46 | |
PROPOSED NEW ESKOM POWER LINE ON THE FARM LEEUWFONTEIN 750 KS NEAR MARBLE HALL, LIMPOPO | PROPOSED NEW ESKOM POWER LINE ON THE FARM LEEUWFONTEIN 750 KS NEAR MARBLE HALL, LIMPOPO | Heritage Scoping | 29/04/2016 | Liesl Stegmann | 06/05/2016 - 13:33 | |||
Proposed new industrial development- Sabie | Phase 1 Heritage Impact Assessment of a proposed new industrial development on the farm Waterval 168, Sabie, Mpumalanga Province. | AIA Phase 1 | 31/07/2018 | Lloyd Rossouw | 02/08/2018 - 15:19 | |||
Proposed new measuring weir, Tzaneen Dan Tzaneen, Limpopo Province | Phase 1 Heritage Resources Scoping Report: Proposed new measuring weir, Tzaneen Dan Tzaneen, Limpopo Province | Heritage Scoping | 01/10/2017 | Liesl Stegmann | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 27/11/2017 - 16:12 | |
Proposed new power line at Sedibeng Mine | Phase 1 Heritage Impact Assessment of a proposed new power line at Sedibeng Mine, Postmasburg, NC | HIA Phase 1 | 17/04/2015 | Lloyd Rossouw | 20/04/2015 - 08:44 | |||
Proposed new powerline near Groblershoop, NC Province. | 132 KV GRID CONNECTION TRANSMISSION LINE BETWEEN THE ORANGE RIVER SOLAR FACILITY 1 AND ESKOM’S HIGH VOLTAGE GROBLERSHOOP SUBSTATION, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/11/2022 | Lloyd Rossouw | Paleo Field Service | 03/02/2023 - 09:34 | ||
Proposed New Residential Development on Portions 163 And 164 on the farm Sterkloop 688LS. | Proposed New Residential Development on Portions 163 And 164 on the farm Sterkloop 688LS, Polokwane, Capricorn District, Limpopo | Heritage Statement | 07/08/2018 | Frans Roodt | AGES (PTY) Ltd - Limpopo | 13/08/2018 - 15:45 |