THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17251 - 17300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED BRANDVALLEY WIND ENERGY FACILITY (WEF) | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED BRANDVALLEY WIND ENERGY FACILITY (WEF) SITUATED IN THE KAROO HOOGLAND LOCAL MUNICIPALITY (NAMAKWA DISTRICT MUNICIPALITY), THE WITZENBURG LOCAL MUNICIPALITY (CAPE WINELANDS DISTRICT MUNICIPALITY) AND LAINGSBURG LOCAL MUNICIPALITY (CENTRAL KAROO DISTRICT MUNICIPALITY). | AIA Phase 1 | 01/07/2016 | Celeste Booth | Booth Heritage Consulting | EOH Coastal and Environmental Services | 28/04/2021 - 14:03 |
Permit_St_Francis_Links_Progress_Nilssen_PJ_Jul09 | St Francis Links - Golf Estate. Phase 2 - Mitigation of Archaeological Heritage Resources | Archaeological Permit Report | 06/07/2009 | Peter Nilssen | Centre for Heritage and Archaeological Resource Management cc | 16/06/2012 - 14:53 | |
Van Stadens Wind Energy Facility 2 | AN ARCHAEOLOGICAL ‘GROUND-TRUTHING’ SURVEY OF THE FOOTPRINT FOR THE PROPOSED METROWIND WIND ENERGY FACILITY (WEF) ON THE FARM RIETFONTEIN VAN STADENS, NELSON MANDELA BAY MUNICIPALITY, PORT ELIZABETH, EASTERN CAPE PROVINCE. | Archaeological Specialist Reports | 22/06/2012 | Celeste Booth | Albany Museum - Archaeology | SRK Consulting (Pty) Ltd - Pretoria | 22/06/2012 - 10:44 |
HIA: Riet Fountain PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Riet Fountain Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:20 |
REPORT ON THE ASSESSMENT OF STRUCTURES | REPORT ON THE ASSESSMENT OF STRUCTURES ON ERF 283, MENLO PARK, GAUTENG APAC014/48 | HIA Phase 1 | 05/10/2014 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | NeoDimension Architects | 06/11/2014 - 19:50 |
Cultural Landscape Assessment | Cultural Landscape Assessment | Built Environment and Cultural Landscapes | 21/06/2021 | Emmylou Bailey | Hearth Heritage | Savannah Environmental (Pty) Ltd | 21/06/2021 - 19:02 |
Hector Pietersen Memorial and Walter Sisulu Square | Progress Report for Proposed Declaration | 15/07/2015 | 01/12/2015 - 10:20 | ||||
HIA Kameelpoortnek | Phase 1 Archaeological and Heritage Impact Assessment on the farm Kameelpoortnek 218 JR in Thembisile Hani Local Municipality, Mpumalanga Province. | Heritage Scoping | 03/02/2017 | Jean-Pierre Celliers | Kudzala Antiquity | Plan Associates Town and Regional Planners | 23/05/2017 - 14:26 |
off take 8b hia | HIA STUDY OF THE PROPOSED CONSTRUCTION OF OFFTAKE 8B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY, DARNALL,ILEMBE DISTRICT MUNICIPALITY, KZN | AIA Phase 1 | 22/01/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 11/02/2015 - 17:01 |
Vaalbult 3IT HIA | A Report on A Heritage Assessment for the Proposed Vaalbult Mining Project on portions of the farm Vaalbult 3IT, Gert Sibande District Municipality, West of Carolina, Mpumalanga Province. APAC013/07 | HIA Phase 1 | 14/02/2013 | Anton Pelser | Vaalbult Mining Company (Pty) Ltd | 29/11/2013 - 19:51 | |
Phase 1 HIA - FARM LIMPOPO VIEW 42 | PHASE 1 HERITAGE RESOURCES SCOPING REPORT S24G APPLICATION FOR CLEARING INDIGENOUS VEGETATION ON THE FARM LIMPOPO VIEW 42 MT, MUSINA LOCAL MUNICIPALITY, VHEMBE DISTRICT, LIMPOPO PROVINCE | HIA Phase 1 | 01/04/2018 | Liesl Stegmann, Frans Roodt | Shasa Heritage Consultants CC | Tua Conserva Environmental | 06/08/2018 - 15:58 |
AIA Lohatlha 673 | Phase 1 Archaeological Impact Assessment Report on Three Portions of the Farm Lohatlha 673 North of Postmasburg, Siyanda District Municipality, Northern Cape Province | AIA Phase 1 | 14/10/2008 | Peter Beaumont | McGregor Museum | Geo-Rock International | 22/03/2013 - 14:26 |
Greytown Bulk Water Supply Scheme Phase 2 | Phase 1 Heritage Impact Assessment Report: Proposed Greytown Bulk Water Supply Scheme Phase 2, uMvoti Local Municipality, uMzinyathi District, KwaZulu-Natal, South Africa | HIA Phase 1 | 25/02/2014 | Elizabeth Wahl | eThembeni Cultural Heritage | Triplo4 Sustainable Solutions | 26/02/2014 - 12:22 |
Heritage Impact Assessment Mooifontein 292 JT | Phase 1 Archaeological and Heritage Impact Assessment on the farm Mooifontein 292 JT in respect of proposed agricultural development, Mpumalanga Province. | HIA Phase 1 | 27/06/2018 | Jean- Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 26/10/2018 - 12:47 |
442HIA - PIA Report: Uster Rangers Hill Farm, Piggery | Palaeontological Field Assessment For The Proposed Piggery On Portion 46 Of The Farm Brakkefontien 416, Within The Nelson Mandela Bay Municipality, Eastern Cape | Palaeontological Specialist Reports | 14/02/2020 | Elize Butler | PGS Heritage (Pty) Ltd | Habitat Link Consulting (Pty) Ltd | 12/03/2020 - 14:58 |
PIA report | PIA report Pampierstad 22 kV line | PIA Desktop | 29/10/2021 | 11/11/2021 - 11:33 | |||
Heritate Impact Assessment Report | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED JOHN DUBE EXTENSION 3 TOWNSHIP SITUATED ON PORTION OF REMAINING EXTENT 1 AND PORTION 83 OF THE FARM GROOTFONTEIN 165-IR, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 01/02/2019 | Johnny Van Schalkwyk | 27/07/2020 - 11:35 | ||
Statement of Significance on Heritage Resources for the Ntshongweni Urban Core Develpment | Statement of significance – Impact on identified heritage resources as indicated on Drawing Ntshongeni Urban Core Rev 17 drawn March 01, 2022 (12 April 2022) | Heritage Statement | 12/04/2022 | Debbie Wheldon | Archaic Consulting | Tongaat Hulett Developments | 01/12/2022 - 07:21 |
140 KING DINUZULU ROAD | AMAFA PERMIT APPLICATION | BE & CL Phase 1 | 15/09/2023 | Sashen Thumberan | 15/09/2023 - 13:37 | ||
Paleontological report-Sigma | Proposed restoration of power from Sigma Shaft – Vaal River line (SVR), west of Sasolburg, Free State | PIA Phase 1 | 06/06/2021 | Jacobus Francios Durand | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 11/08/2021 - 12:08 |
Proposed Boikhutso Poultry Project in Lepelle Nkumpi Local Municipality, Limpopo Province | Proposed Boikhutso Poultry Project in Lepelle Nkumpi Local Municipality, Limpopo Province | AIA Phase 1 | 01/01/2006 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 14:33 | |
Proof of Payment | Darren Gregory Scott Clifton | DGSC Designs | DGSC Designs | 07/02/2023 - 16:40 | |||
Archaeological Impact Assessment | Archaeological Impact Assessment FOR THE PROPOSED SHELL PROTEA BOULEVARD SERVICE STATION, SOWETO, GAUTENG PROVINCE | AIA Phase 1 | 29/04/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Environmental Resources Management | 08/06/2015 - 16:13 |
Nigel Fuel Depot | PROPOSED NIGEL DIESEL DEPOT, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 25/08/2015 | Neels Kruger | Exigo3 Sustainability | Econ Oil & Energy (Pty) Ltd | 25/04/2016 - 14:24 |
Phase 1 Cultural Heritage Impact Assessment: Revised | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DIAMONDS ALLUVIAL AND DIAMONDS GENERAL PROSPECTING RIGHT NEAR SCHWEIZER-RENEKE ON PORTION 2 AND A CERTAIN EXTENT OF THE REMAINING EXTENT OF THE FARM KAMEELKUIL 88HO, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE. | HIA Phase 1 | 16/10/2017 | J.A. van Schalkwyk | 17/10/2017 - 08:50 | ||
Heritage report for the proposed truck Stop | BASIC ASSESSMENT REPORT FOR THE TRUCK STOP WITH FILLING STATION AND ANCILLARY USES KNOWN AS MEERKAT ON REMAINING EXTENT OF POTION 9 (A PORTION OF PORTION 5) OF THE FARM SMALKLOOF 122 RE | Heritage Study | 10/06/2013 | Ntseketsi Lerotholi | African Heritage Consultants CC | Royal Haskoning DHV | 10/06/2013 - 10:51 |
PIA: Desktop Study Welcome Wood PV Power Station 2&3 | PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY Proposed PV power stations Welcome Wood II and III adjacent to Welcome Wood Substation, near Daniëlskuil, Northern Cape Province | PIA Desktop | 01/02/2012 | John E Almond | Natura Viva CC | Van Zyl Environmental Consultants | 22/04/2014 - 16:07 |
2nd PHASE DOCUMENTATION REPORT ON THE ASSESSMENT OF | 2nd PHASE DOCUMENTATION REPORT ON THE ASSESSMENT OF THE FIDELITY GUARDS BUILDING LOCATED ON PORTION 5, OF PAARDEKRAAL 226IQ IN STORMILL, GAUTENG APAC016/30 | HIA Phase 2 | 27/06/2016 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 11/07/2016 - 16:55 | |
Laudium HIA report | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTUCTION OF A HINDU TEMPLE IN LAUDIUM, CITY OF TSHWANE LOCAL MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 31/10/2017 | J.A. van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 08/02/2019 - 10:59 |
AIA_Dorper_Wind_Energy_Facility_Binneman_J_Aug10 | A Phase 1 AIA for the proposed Dorper Wind Energy Facility on a site near Molteno, CHDM, Eastern Cape Province | AIA Phase 1 | 19/08/2010 | Johan Binneman, Celeste Booth, Natasha Higgitt | Albany Museum | 16/06/2012 - 14:44 | |
Heritage Impact Assessment for 11KV Power Line from the Bynes-Waterberg Line to Cavalier Abattoir | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED 11KV POWER LINE FROM THE BYNES-WATERBERG LINE TO CAVALIER ABATTOIR, GAUTENG PROVINCE | HIA Phase 1 | 20/01/2022 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 31/01/2022 - 19:48 |
AIA Addendum: CHICKEN LAYER HOUSES ON BOTHA FARM | EXPANSION OF AGRICULTURAL ACTIVITIES: PROPOSED CONSTRUCTION OF CHICKEN LAYER HOUSES ON BOTHA FARM (REMAIDER ERF 4000) PRIESKA, NORTHERN CAPE PROVINCE | AIA Phase 2 | 01/10/2018 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviro Logic | 07/05/2019 - 13:41 |
Proposed clearing of indigenous vegetation on the Farm Bottel Fontein (15/11), Redelinghuys for the cultivation of rooibos tea | HIA: Proposed clearing of indigenous vegetation on the Farm Bottel Fontein (15/11), Redelinghuys for the cultivation of rooibos tea. | HIA Phase 1 | 25/10/2019 | Jenna Lavin, Nicholas Wiltshire | CTS Heritage | 30/09/2020 - 16:38 | |
Heritage Screener: Wolf WEF Access Road | Desktop Heritage Screening Assessment for the Proposed development of an Access Road for the approved Wolf WEF in the Cacadu Region, Eastern Cape | HIA Letter of Exemption | 17/03/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 12/04/2022 - 10:14 |
UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MARINE SERVITUDES | UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MARINE SERVITUDES FOR THE COEGA SEZ, PORT ELIZABETH | AIA Phase 1 | 20/10/2020 | Vanessa Maitland | Coastal & Environmental Services - Port Elizabeth | 23/11/2020 - 12:22 | |
AIA_Wheatlands_260_Van_der_Walt_J_Jun11 | Archaeological Impact Assessment: Proposed Marula 132 / 11KV Substation on a Portion of the Farm Wheatlands 260 IQ, Randfontein, Gauteng Province | AIA Phase 1 | 13/06/2011 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 16/06/2012 - 14:51 | |
HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT | HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 20/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys and Heritage Management | 05/04/2023 - 15:48 | |
SIG Comment | SIG Comment | 23/05/2023 - 07:29 | |||||
Ballito Crushers quarry expansion_HIA | eThembeni Cultural Heritage. 2008. Heritage Impact Assessment of Ballito Crushers quarry expansion, Shakaskraal, KZN | Heritage Impact Assessment Specialist Reports | 25/07/2008 | Len van Schalkwyk | eThembeni Cultural Heritage | Ballito Crushers (Pty) Ltd | 01/02/2017 - 13:25 |
Third Road Bridge Heritage Screener Report | Third Road Bridge Heritage Screener Report | Heritage Impact Assessment Specialist Reports | 10/11/2017 | Nicholas Wiltshire | Envirolution Consulting (Pty) Ltd | 09/01/2018 - 09:10 | |
HIA Mabopane Pedestrian and Cycle path | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 10/07/2014 - 08:12 |
Nkoninga Pump Station and Rising Main Upgrade | Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed Nkoninga Pump Station and Sewer Line upgrade, Richards Bay Mhlathuze Municipality, KwaZulu-Natal | HIA Letter of Exemption | 18/08/2016 | Len van Schalkwyk | eThembeni Cultural Heritage | Exigent Environmental | 14/09/2016 - 07:18 |
HIA; Expansion of an Aquaculture Operation | Heritage Impact Assessent Report. Gansbaai Erf 3819 and Lot 32A of Erf 538: Proposed Expansion of an Aquaculture Operation. | HIA Phase 1 | 01/06/2012 | Liezl van Pletzen-Vos, Renee Rust | Pro-Active Archaeology | Enviroafrica CC | 06/04/2018 - 08:56 |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:09 |
Mpumalanaga mixed development | HERITAGE SURVEY OF THE PROPOSED MPUMALANGA TOWN CENTRE HOUSING PROJECT, KWAZULU-NATAL | HIA Phase 1 | 30/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 30/07/2019 - 10:29 |
Heritage Impact Assessment Report | Heritage Impact Assessment for the Proposed upgrade of infrastructure at Gilead Substation located within Mogalakwena Local Municipality, in the Limpopo Province | Heritage Impact Assessment Specialist Reports | 12/05/2022 | Roy Muroyi | 14/06/2022 - 10:55 | ||
Request for Exemption of any Palaeontological Impact Assessment for the proposed closure of CDR slimes dam, south of Middelburg, Mpumalanga | Request for Exemption of any Palaeontological Impact Assessment for the proposed closure of CDR slimes dam, south of Middelburg, Mpumalanga | PIA Desktop | 11/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Knight Piesold Consultants | 19/02/2021 - 09:10 |
HIA_Qunu_wind_and_solar_energy_facility_Anderson_G_Jan11 | Heritage Survey of the proposed photovoltaic and wind turbine farm at Qunu | HIA Phase 1 | 27/01/2011 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 16/06/2012 - 14:52 | |
Voel Nessie B North West Province | Voel Nessie B North West Province | HIA Phase 1 | 01/06/2022 | Jaco van der Walt | Beyond Heritage | SRK Consulting (Pty) Ltd - Johannesburg | 08/08/2022 - 16:54 |
HIA Sterkspruit 296 JT, Mpumalanga | Phase 1 Archaeological and Heritage Impact Assessment on the farm Sterkspruit 296 JT in respect of proposed agricultural development, Mpumalanga Province. | HIA Phase 1 | 29/05/2020 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 01/04/2021 - 11:54 |