THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17451 - 17500 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Uguhleni 689 JT Heritage Report | Phase 1 Archaeological and Heritage Impact Assessment on the farm Uguhleni 689 JT in respect of proposed agricultural development, Barberton, Umjindi Local Municipality, Mpumalanga Province. | HIA Phase 1 | 16/06/2022 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 19/01/2023 - 10:53 |
Paarde Valley PV2 OHPL Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINE FOR PAARDE VALLEY PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 16/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | Holland & Associates Environmental Consultants | 12/07/2022 - 15:12 |
MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED UNIVERSITY OF PRETORIA (UP) SOLAR FACILITY DEVELOPMENT | MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED UNIVERSITY OF PRETORIA (UP) SOLAR FACILITY DEVELOPMENT ON A PORTION OF KOEDOESPOORT 456JR, UNIVERSITY OF PRETORIA, CITY OF TSHWANE | HIA Letter of Exemption | 16/06/2022 | Anton Pelser | University of Pretoria | 29/06/2022 - 09:19 | |
Phase 1 Cultural Heritage Impact Assessment: Demilander 273 Feedlot | Phase 1 Cultural Heritage Impact Assessment: RECTIFICATION APPLICATION FOR THE CONSTRUCTION OF A CATTLE FEEDLOT ON THE FARM DEMILANDER 273, MARQUARD REGION, SETSOTO LOCAL MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 17/06/2022 | Johnny van Schalkwyk | SPOOR Environmental Services (PTY) Ltd. | 12/07/2022 - 21:19 | |
Specialist statement | RICHTERSVELD WIND FARM ON PTN6 (WITBANK) OF KORRIDOR WEST 2: PART 2 AMENDMENT APPLICATION: HERITAGE STATEMENT | Heritage Statement | 17/06/2022 | 18/07/2023 - 14:56 | |||
Updated Richtersveld Wind Farm Project Heritage Report | RICHTERSVELD WIND FARM ON PTN6 (WITBANK) OF KORRIDOR WEST 2: PART 2 AMENDMENT APPLICATION: HERITAGE STATEMENT | Heritage Statement | 17/06/2022 | David Halkett | ACO Associates CC | HCV Africa | 18/07/2023 - 09:31 |
SRPM PV HSR | Appendix E - Heritage Scoping Report | Heritage Scoping | 17/06/2022 | Dr Julius CC Pistorius | Savannah Environmental (Pty) Ltd | 20/06/2022 - 13:28 | |
PIA report Koria Boesmanskop | PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KORIA-BOESMANSKOP 22 KV OHL ON FARM WORKSHOP 97, BETWEEN WEPENER AND VANSTADENSRUS, FREE STATE PROVINCE | PIA Phase 2 | 17/06/2022 | Marion Bamford | 1World Consultants (Pty) Ltd | 1World Consultants (Pty) Ltd | 12/07/2022 - 15:56 |
Springhaas Line 7 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 9 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:27 |
Springhaas LiLo 2 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:24 |
Springhaas Line 1 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 1 to Collector Substation B within the proposed Springhaas Grid Corridor near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:40 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed New Peacanwood Coal Mining Development on a Portion of the Remaining Extent of the Farm Wildfontein 420 JS, district Middelburg, Mpumalanga | AIA Phase 1 | 20/06/2022 | Tobias Coetzee | Tobias Coetzee | 04/07/2022 - 13:35 | |
Springhaas Line 2 | Heritage Impact Assessment: Proposed Powerline Line 2 from Springhaas Solar Facility 3 to Collector Substation B within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 13:07 |
Springhaas Line 3 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 4 to Collector Substation A within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 13:23 |
Creighton BWSS | Creighton Bulk Water Supply Scheme, Harry Gwala District Municipality, KwaZulu-Natal | HIA Phase 1 | 20/06/2022 | Jean Beater | JLB Consulting | Gedezar Consulting | 14/09/2022 - 11:23 |
HIA: Msenge Emoyeni OHL | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the PROPOSED DEVELOPMENT OF A 66KV OHL FOR THE AUTHORISED MSENGE EMOYENI WIND ENERGY FACILITY, EASTERN CAPE | HIA Phase 1 | 20/06/2022 | Jenna Lavin, Nicholas Wiltshire, marion Bamford | CTS Heritage | African Clean Energy Developments (Pty) Ltd | 20/06/2022 - 10:25 |
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 09:21 |
Springhaas Line 4 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 5 To Collector Substation A within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:00 |
Springhaas Line 5 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 6 To Collector Substation B Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:44 |
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 10:22 |
D6 Phase 4 Social History | Socio-Hestorical Study Parcel P / Stage 4 District Six | Intangible Heritage Report | 20/06/2022 | Tracey Randle | Delta Built Environment Consultants (Pty) Ltd | 14/09/2022 - 14:31 | |
Springhaas Line 6 | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 8 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:12 |
Springhaas LiLo 1 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation A to the Beta/Hydra 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:11 |
The KhoiSan Genadendal Movement’s Knoflokskraal Occupation, Grabouw, Western Cape | The KhoiSan Genadendal Movement’s Knoflokskraal Occupation, Grabouw, Western Cape | Non Impact Assessment Related Reports | 20/06/2022 | Karen Van Ryneveld | 20/06/2022 - 20:32 | ||
Barberton Police Station HIA | ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEWLY RE-ESTABLISHED POLICE STATION AT BARBERTON WITHIN THE CITY OF MBOMBELA LOCAL MUNICIPALITY, EHLANZENI DISTRICT OF MPUMALANGA PROVINCE. | HIA Phase 1 | 21/06/2022 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 16/08/2022 - 08:51 | |
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed National Treasure Minerals Prospecting Right Application on Several Portions of the Farms Elandsfontein 102 JQ and Boschhoek 103 JQ, Rustenburg, North West | AIA Desktop | 21/06/2022 | Tobias Coetzee | Tobias Coetzee | 09/08/2022 - 17:34 | |
Phase 1 HIA Groblershoop | Phase 1 Heritage Impact Assessment of the proposed Orange River Solar 1 SPV facility on Portion 18 of the farm Rooisand 387 near Groblershoop, NC Province. | HIA Phase 1 | 22/06/2022 | Lloyd Rossouw | Paleo Field Service | 01/07/2022 - 09:15 | |
AIA on the Survey of Robben Island WWTW site | Archaeological Impact Assessment (AIA) Report on the survey of a site on Robben Island situated south of the Dog Unit (Robert Sobukwe House) between Murray’s Bay and Murray’s Road | Archaeological Specialist Reports | 22/06/2022 | Ute Seemann | Ute A Seemann - Heritage Archaeologist and Heritage Consultant | WSP Group Africa (Pty) Ltd | 11/08/2022 - 19:23 |
DUB004 Phase 2 Interim Mitigation Report | Phase 2 archaeological mitigation on site DUB004 for the Agrizone Phase 2 Development at the Dube Trade Port, King Shaka International Airport, Tongaat, KwaZulu Natal Province | Archaeological Permit Report | 22/06/2022 | Wouter Fourie, Henk Steyn | PGS Heritage (Pty) Ltd | Dube Trade Port Corporation | 22/06/2022 - 11:51 |
Heritage Screener: Claire PV i and II | Desktop Heritage Screening Assessment for the Proposed development of Claire PV 1 and Claire PV 2 in Clayville, Gauteng | HIA Letter of Exemption | 23/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 30/06/2022 - 08:18 |
Bonizenzo Holdings PRA APAC02258 | A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 10, 21 & 24 OF ROODERAND 41JP AND THE REMAINING EXTENT OF PORTIONS 1 & 2 OF ROODERAND 902JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/58 | Heritage Impact Assessment Specialist Reports | 23/06/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Licebo Environmental and Mining (Pty) Ltd | 23/06/2022 - 12:38 |
Heritage Screener: Kiara PV 1 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 1 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:31 |
Heritage Screener: Kiara PV 2 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 2 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:35 |
Heritage Screener: Kiara PV 4 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 4 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:37 |
Heritage Screener: Kiara PV 3 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 3 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:38 |
Heritage Screener: Kiara PV 5 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 5 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:40 |
Heritage Screener: Kiara PV 6 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 6 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:41 |
Heritage Screener: Kiara PV 7 | Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 7 Facility and Associated Infrastructure, North West Province | Heritage Scoping | 24/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 28/06/2022 - 16:42 |
AIA for the Waste Licence Facilities for the Mpact Piet Retief Mill | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM VROEGEVELD 509IT FOR THE PROPOSED MPACT PIET RETIEF WASTE LICENSE PROJECT IN THE MKHONDO MUNICIPALITY, MPUMALANGA PROVINCE | AIA Phase 1 | 25/06/2022 | Neels Kruger | Neels Kruger | SPOOR Environmental Services (PTY) Ltd. | 15/05/2023 - 15:08 |
Paleontological Impact Assessment | IMPACT ASSESSMENT FOR THE WASTE PYROLYSIS FACILITY IN CENTURION, GAUTENG | Palaeontological Specialist Reports | 25/06/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EScience Associates (Pty) Ltd | 15/07/2022 - 12:38 |
NID: Expansion of existing solar plant, UFS, Bloemfontein | NID - Proposed expansion of existing solar plant, UFS, Bloemfontein | 27/06/2022 | Loudine Philip | FCE Consulting Engineers | 27/06/2022 - 13:39 | ||
HIA: San Solar PV 2022 | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the San Solar PV Facility and Associated Infrastructure, Northern Cape Province | HIA Phase 1 | 27/06/2022 | Jenna Lavin, Jan Engelbrecht, marion Bamford | CTS Heritage | Savannah Environmental (Pty) Ltd | 22/08/2022 - 14:09 |
Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province | HIA Phase 1 | 27/06/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 06/07/2022 - 09:14 |
HDBR Desktop PIA | Desktop Palaeontological Impact Assessment for the proposed construction of the 2 km long Holsdam Barkley River Farmers 11kV powerline move, near Kimberley, Northern Cape Province | PIA Desktop | 28/06/2022 | Marion Bamford | 1World Consultants (Pty) Ltd | 1World Consultants (Pty) Ltd | 03/11/2022 - 16:10 |
Villa Catharina, 1 Rosebank Place, Oranjezicht | DRAFT HERITAGE REPORT VERSLUIS-OLIVER RESIDENCE ERF 457 NO. 1 ROSEBANK PLACE VILLA CATHARINA ORANJEZICHT CAPE TOWN | Heritage Statement | 28/06/2022 | Ursula Rigby | 15/07/2022 - 14:01 | ||
HIA Leeuwfontein X29 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED LEEUWFONTEIN EXTENSION 29 TOWNSHIP DEVELOPMENT, GAUTENG PROVINCE | HIA Phase 1 | 29/06/2022 | Jaco van der Walt | Beyond Heritage | Texture Environmental Consultants | 12/08/2022 - 16:33 |
1473 - Paleontology and Heritage Report | THE PROPOSED TETRA4 CLUSTER 2 GAS PRODUCTION PROJECT, BETWEEN WELKOM, VIRGINIA AND THEUNISSEN, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 29/06/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 01/02/2023 - 11:55 |
Camden I WEF Heritage Impact Assessment | Heritage Impact Assessment for the Proposed Camden I Wind Energy Facility | HIA Phase 1 | 30/06/2022 | Jaco van der Walt | WSP Group Africa (Pty) Ltd | Beyond Heritage | 06/09/2022 - 17:16 |
Desktop Cultural Heritage Assessment: Proposed Prospecting Application for Diamonds Alluvial, Diamonds General, Diamonds in Kimberlite and Diamonds near Vioolsdrift, Namaqualand, Namakwa District Municipality, Nama Khoi Local Municipality, Northern Cape | Desktop Cultural Heritage Assessment: Proposed Prospecting Application for Diamonds Alluvial, Diamonds General, Diamonds in Kimberlite and Diamonds near Vioolsdrift, Namaqualand, Namakwa District Municipality, Nama Khoi Local Municipality, Northern Cape | Heritage Study | 30/06/2022 | Francois Coetzee | Francois Coetzee | Milnex 189 CC | 26/07/2022 - 15:20 |
Camden I SEF Heritage Impact Assessment | Heritage Impact Assessment for the Proposed Camden I SEF | HIA Phase 1 | 30/06/2022 | Jaco van der Walt | WSP Group Africa (Pty) Ltd | Beyond Heritage | 06/09/2022 - 17:26 |