FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED UNIVERSITY OF PRETORIA (UP) SOLAR FACILITY DEVELOPMENT MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED UNIVERSITY OF PRETORIA (UP) SOLAR FACILITY DEVELOPMENT ON A PORTION OF KOEDOESPOORT 456JR, UNIVERSITY OF PRETORIA, CITY OF TSHWANE HIA Letter of Exemption 16/06/2022 Anton Pelser University of Pretoria 29/06/2022 - 09:19
Uguhleni 689 JT Heritage Report Phase 1 Archaeological and Heritage Impact Assessment on the farm Uguhleni 689 JT in respect of proposed agricultural development, Barberton, Umjindi Local Municipality, Mpumalanga Province. HIA Phase 1 16/06/2022 Jean-Pierre Celliers Kudzala Antiquity Henwood Environmental Services 19/01/2023 - 10:53
Paarde Valley PV2 OHPL Heritage Impact Assessment HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINE FOR PAARDE VALLEY PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 16/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd Holland & Associates Environmental Consultants 12/07/2022 - 15:12
SRPM PV HSR Appendix E - Heritage Scoping Report Heritage Scoping 17/06/2022 Dr Julius CC Pistorius Savannah Environmental (Pty) Ltd 20/06/2022 - 13:28
Updated Richtersveld Wind Farm Project Heritage Report RICHTERSVELD WIND FARM ON PTN6 (WITBANK) OF KORRIDOR WEST 2: PART 2 AMENDMENT APPLICATION: HERITAGE STATEMENT Heritage Statement 17/06/2022 David Halkett ACO Associates CC HCV Africa 18/07/2023 - 09:31
PIA report Koria Boesmanskop PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KORIA-BOESMANSKOP 22 KV OHL ON FARM WORKSHOP 97, BETWEEN WEPENER AND VANSTADENSRUS, FREE STATE PROVINCE PIA Phase 2 17/06/2022 Marion Bamford 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 12/07/2022 - 15:56
Phase 1 Cultural Heritage Impact Assessment: Demilander 273 Feedlot Phase 1 Cultural Heritage Impact Assessment: RECTIFICATION APPLICATION FOR THE CONSTRUCTION OF A CATTLE FEEDLOT ON THE FARM DEMILANDER 273, MARQUARD REGION, SETSOTO LOCAL MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 17/06/2022 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. 12/07/2022 - 21:19
Specialist statement RICHTERSVELD WIND FARM ON PTN6 (WITBANK) OF KORRIDOR WEST 2: PART 2 AMENDMENT APPLICATION: HERITAGE STATEMENT Heritage Statement 17/06/2022 18/07/2023 - 14:56
Springhaas Line 4 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 5 To Collector Substation A within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:00
Springhaas Line 5 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 6 To Collector Substation B Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:44
Springhaas Collector Substation B Heritage Impact Assessment Springhaas Collector Substation B Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 10:22
D6 Phase 4 Social History Socio-Hestorical Study Parcel P / Stage 4 District Six Intangible Heritage Report 20/06/2022 Tracey Randle Delta Built Environment Consultants (Pty) Ltd 14/09/2022 - 14:31
Springhaas Line 6 Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 8 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 15:12
The KhoiSan Genadendal Movement’s Knoflokskraal Occupation, Grabouw, Western Cape The KhoiSan Genadendal Movement’s Knoflokskraal Occupation, Grabouw, Western Cape Non Impact Assessment Related Reports 20/06/2022 Karen Van Ryneveld 20/06/2022 - 20:32
Springhaas LiLo 1 Heritage Impact Assessment Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation A to the Beta/Hydra 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:11
Springhaas Line 7 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 9 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 15:27
Springhaas LiLo 2 Heritage Impact Assessment Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:24
Springhaas Line 1 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 1 to Collector Substation B within the proposed Springhaas Grid Corridor near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:40
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed New Peacanwood Coal Mining Development on a Portion of the Remaining Extent of the Farm Wildfontein 420 JS, district Middelburg, Mpumalanga AIA Phase 1 20/06/2022 Tobias Coetzee Tobias Coetzee 04/07/2022 - 13:35
Springhaas Line 2 Heritage Impact Assessment: Proposed Powerline Line 2 from Springhaas Solar Facility 3 to Collector Substation B within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:07
Springhaas Line 3 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 4 to Collector Substation A within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:23
HIA: Msenge Emoyeni OHL HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the PROPOSED DEVELOPMENT OF A 66KV OHL FOR THE AUTHORISED MSENGE EMOYENI WIND ENERGY FACILITY, EASTERN CAPE HIA Phase 1 20/06/2022 Jenna Lavin, Nicholas Wiltshire, marion Bamford CTS Heritage African Clean Energy Developments (Pty) Ltd 20/06/2022 - 10:25
Creighton BWSS Creighton Bulk Water Supply Scheme, Harry Gwala District Municipality, KwaZulu-Natal HIA Phase 1 20/06/2022 Jean Beater JLB Consulting Gedezar Consulting 14/09/2022 - 11:23
Springhaas Collector Substation B Heritage Impact Assessment Springhaas Collector Substation B Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 09:21
Barberton Police Station HIA ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEWLY RE-ESTABLISHED POLICE STATION AT BARBERTON WITHIN THE CITY OF MBOMBELA LOCAL MUNICIPALITY, EHLANZENI DISTRICT OF MPUMALANGA PROVINCE. HIA Phase 1 21/06/2022 Richard Munyai Vhufa Hashu Heritage Consultancy CC 16/08/2022 - 08:51
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Proposed National Treasure Minerals Prospecting Right Application on Several Portions of the Farms Elandsfontein 102 JQ and Boschhoek 103 JQ, Rustenburg, North West AIA Desktop 21/06/2022 Tobias Coetzee Tobias Coetzee 09/08/2022 - 17:34
Phase 1 HIA Groblershoop Phase 1 Heritage Impact Assessment of the proposed Orange River Solar 1 SPV facility on Portion 18 of the farm Rooisand 387 near Groblershoop, NC Province. HIA Phase 1 22/06/2022 Lloyd Rossouw Paleo Field Service 01/07/2022 - 09:15
AIA on the Survey of Robben Island WWTW site Archaeological Impact Assessment (AIA) Report on the survey of a site on Robben Island situated south of the Dog Unit (Robert Sobukwe House) between Murray’s Bay and Murray’s Road Archaeological Specialist Reports 22/06/2022 Ute Seemann Ute A Seemann - Heritage Archaeologist and Heritage Consultant WSP Group Africa (Pty) Ltd 11/08/2022 - 19:23
DUB004 Phase 2 Interim Mitigation Report Phase 2 archaeological mitigation on site DUB004 for the Agrizone Phase 2 Development at the Dube Trade Port, King Shaka International Airport, Tongaat, KwaZulu Natal Province Archaeological Permit Report 22/06/2022 Wouter Fourie, Henk Steyn PGS Heritage (Pty) Ltd Dube Trade Port Corporation 22/06/2022 - 11:51
Heritage Screener: Claire PV i and II Desktop Heritage Screening Assessment for the Proposed development of Claire PV 1 and Claire PV 2 in Clayville, Gauteng HIA Letter of Exemption 23/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 30/06/2022 - 08:18
Bonizenzo Holdings PRA APAC02258 A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 10, 21 & 24 OF ROODERAND 41JP AND THE REMAINING EXTENT OF PORTIONS 1 & 2 OF ROODERAND 902JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/58 Heritage Impact Assessment Specialist Reports 23/06/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Licebo Environmental and Mining (Pty) Ltd 23/06/2022 - 12:38
Heritage Screener: Kiara PV 1 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 1 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:31
Heritage Screener: Kiara PV 2 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 2 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:35
Heritage Screener: Kiara PV 4 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 4 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:37
Heritage Screener: Kiara PV 3 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 3 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:38
Heritage Screener: Kiara PV 5 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 5 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:40
Heritage Screener: Kiara PV 6 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 6 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:41
Heritage Screener: Kiara PV 7 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 7 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:42
AIA for the Waste Licence Facilities for the Mpact Piet Retief Mill ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM VROEGEVELD 509IT FOR THE PROPOSED MPACT PIET RETIEF WASTE LICENSE PROJECT IN THE MKHONDO MUNICIPALITY, MPUMALANGA PROVINCE AIA Phase 1 25/06/2022 Neels Kruger Neels Kruger SPOOR Environmental Services (PTY) Ltd. 15/05/2023 - 15:08
Paleontological Impact Assessment IMPACT ASSESSMENT FOR THE WASTE PYROLYSIS FACILITY IN CENTURION, GAUTENG Palaeontological Specialist Reports 25/06/2022 Elize Butler Banzai Environmental (Pty) Ltd EScience Associates (Pty) Ltd 15/07/2022 - 12:38
NID: Expansion of existing solar plant, UFS, Bloemfontein NID - Proposed expansion of existing solar plant, UFS, Bloemfontein 27/06/2022 Loudine Philip FCE Consulting Engineers 27/06/2022 - 13:39
HIA: San Solar PV 2022 HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the San Solar PV Facility and Associated Infrastructure, Northern Cape Province HIA Phase 1 27/06/2022 Jenna Lavin, Jan Engelbrecht, marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 22/08/2022 - 14:09
Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province HIA Phase 1 27/06/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 06/07/2022 - 09:14
HDBR Desktop PIA Desktop Palaeontological Impact Assessment for the proposed construction of the 2 km long Holsdam Barkley River Farmers 11kV powerline move, near Kimberley, Northern Cape Province PIA Desktop 28/06/2022 Marion Bamford 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 03/11/2022 - 16:10
Villa Catharina, 1 Rosebank Place, Oranjezicht DRAFT HERITAGE REPORT VERSLUIS-OLIVER RESIDENCE ERF 457 NO. 1 ROSEBANK PLACE VILLA CATHARINA ORANJEZICHT CAPE TOWN Heritage Statement 28/06/2022 Ursula Rigby 15/07/2022 - 14:01
HIA Leeuwfontein X29 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED LEEUWFONTEIN EXTENSION 29 TOWNSHIP DEVELOPMENT, GAUTENG PROVINCE HIA Phase 1 29/06/2022 Jaco van der Walt Beyond Heritage Texture Environmental Consultants 12/08/2022 - 16:33
1473 - Paleontology and Heritage Report THE PROPOSED TETRA4 CLUSTER 2 GAS PRODUCTION PROJECT, BETWEEN WELKOM, VIRGINIA AND THEUNISSEN, FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 29/06/2022 Wouter Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 01/02/2023 - 11:55
Paarde Valley PV2 OHPL Palaeontological Impact Assessment PALAEONTOLOGICAL IMPACT ASSESSMENT PAARDE VALLEY PV2 GRID CONNECTION TO VETLAAGTE MAIN TRANSMISSION SUBSTATION (MTS) Palaeontological Specialist Reports 30/06/2022 Elize Butler Banzai Environmental (Pty) Ltd Holland & Associates Environmental Consultants 12/07/2022 - 15:17
HIA Euphorbia PV Facility North West Province HIA Euphorbia PV Facility North West Province HIA Phase 1 30/06/2022 Jaco van der Walt Beyond Heritage Cape Environmental Assessment Practitioners 06/08/2022 - 14:36
Camden 400KV Heritage Impact Assessment Heritage Impact Assessment for the Proposed Camden Up to 400KV Powerline and Collector Substation HIA Phase 1 30/06/2022 Jaco van der Walt WSP Group Africa (Pty) Ltd Beyond Heritage 06/09/2022 - 16:45