Displaying 17551 - 17600 of 17961
ReportRef | ReportTitle | ReportType |
ReportDate![]() |
Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA report Solar farm on Holmwood 315 – Blouberg | Phase 1 Heritage Impact Assessment Report. Proposed Solar Photovoltaic Facility Development on a Portion of The Farm Holmwood 315 MR, Blouberg Local Municipality, Capricorn District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 08/09/2022 | Frans Roodt | Envirosana Environmental Consultants | 08/09/2022 - 11:10 | |
HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN REMAINING EXTENT AND PORTION 1 OF FARM HURLEY 688 | PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN REMAINING EXTENT AND PORTION 1 OF FARM HURLEY 688 FOR DIAMOND AND REMAINING EXTENT OF BRETBY 687 FARM FOR MANGANESE AND IRON ORE. IN THE ADMINISTRATIVE DISTRICT OF KURUMAN, NORTHERN CAPE PROVINCE | HIA Phase 1 | 09/09/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | 24/11/2022 - 15:40 | |
Dihatshwane Substation PIA | Palaeontological Impact Assessment for the proposed Dihatshwane Substation, Rooigrond, Mahikeng, North West Province | PIA Phase 1 | 11/09/2022 | Dr. Heidi Fourie | 24/11/2022 - 17:50 | ||
Olieboomspoort raw material sourcing | Report to SAHRA on Middle Stone Age lithic raw material sourcing from Olieboomspoort (Limpopo Province, South Africa) | Archaeological Specialist Reports | 11/09/2022 | 14/12/2022 - 14:58 | |||
SANRAL R33 Road Upgrade Project | Heritage Impact Assessment for the SANRAL R33 Road Upgrade Project located along the R33 between the N1 Highway and the town of Modimolle, Modimolle-Mookgopong Local Municipality, Waterberg District Municipality, Limpopo Province | Heritage Impact Assessment Specialist Reports | 11/09/2022 | Polke Birkholtz | PGS Heritage (Pty) Ltd | Environmental Edge | 11/10/2022 - 16:49 |
Heritage Screener: Zondereinde PV | Desktop Heritage Screening Assessment: BASIC ASSESSMENT FOR 100MW NORTHAM ZONDEREINDE SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LIMPOPO PROVINCE | Heritage Statement | 12/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 10/10/2022 - 13:31 |
Queens warehouse | Application for Extension of time to 19-348L | 13/09/2022 | Nadarajan Aubrey Nagan | KwaZulu-Natal Amafa and Research Institute | Transnet National Ports Authority - Durban | 13/09/2022 - 14:53 | |
Survey of cultural Resources | Cultural Heritage report for the Proposed establishment of Pienaarsrivier cemetery on ERF 607 in Pienaarsrivier Extension 1 within Bela-Bela Local Municipality, Waterberg District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 13/09/2022 | J A van Schalkwyk | J A van Schalkwyk | 12/10/2022 - 10:52 | |
HIA for D192 and Borrow-pits | PHASE 1 HERITAGE IMPACT ASSESSMENT SPECIALIST STUDY FOR THE PROPOSED PREVENTATIVE MAINTENANCE OF D192 ROAD AND ASSOCIATED BORROW-PITS WITHIN MOGALAKWENA LOCAL MUNICIPALITY OF WATERBERG DISTRICT MUNICIPALITY OF LIMPOPO PROVINCE | HIA Phase 1 | 14/09/2022 | Richard Munyai | Vhufa Hashu Heritage Consultants | 28/09/2022 - 14:11 | |
Final D6 Phase 4 HIA | District Six Phased Redevelopment Heritage Impact Assessment submitted in terms of Section 38(4) of the NHRA (1999): Redevelopment of Erf 177646 as part of Restitution Process, District Six, Cape Town | HIA Phase 1 | 14/09/2022 | Katie Smuts, Mike Scurr, Tracey Randle, Amy Feng | Rennie Scurr Adendorff | Delta Built Environment Consultants (Pty) Ltd | 14/09/2022 - 14:19 |
Development of additional areas for agriculture on the farm Krokodilspruit 248JT | Phase 1 AIA//HIA for an additional 76ha for agricultural development (orchards) on the farm Krokodilspruit 248JT, White River area, Mpumalanga Province | AIA Phase 1 | 15/09/2022 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 15/09/2022 - 05:36 |
Klipkraal WEF 1 Heritge Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 1, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 16/09/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 16/09/2022 - 16:32 |
Phase 1 Archeological Impact Assessment for 2 Seam Amendments | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Amendment to the Existing 2-Seam Mine on Portions of the Farms Vlaklaagte 45 IS and Lourens 472 IS, Kriel, Mpumalanga | AIA Phase 1 | 16/09/2022 | Agri Civils Geo-Tech & Heritage | 14/11/2022 - 08:27 | ||
PIA For the Demilander Feedlot Development | Palaeontological Impact Assessment for the proposed Feedlot on Farm Demilander 273 between Marquard and Winburg, Free State Province | PIA Desktop | 18/09/2022 | Marion Bamford | Prof Marion Bamford | SPOOR Environmental Services (PTY) Ltd. | 20/09/2022 - 07:55 |
NHLAZATSHE 1 HIA | ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED FORMALIZATION OF NHLAZATSHE TOWNSHIP WITHIN THE CHIEF ALBERT LUTHULI LOCAL MUNICIPALITY OF MPUMALANGA PROVINCE. | HIA Phase 1 | 19/09/2022 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 02/12/2022 - 11:02 | |
NETCARE ST AUGUSTINES HOSPITAL DURBAN | Netcare St Augustines Hospital Durban ADDITIONS & ALTERATIONS TO THEATRE COMPLEX & ROOF TOP PLANT ROOM | 19/09/2022 | Wayne Allen | 19/09/2022 - 09:32 | |||
SOYUZ 2 (Pty) Ltd: PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT: Soyuz 2 Wind Energy Facility | PIA Desktop | 20/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 23/09/2022 - 11:26 |
SOYUZ 3 WEF HERITAGE SCOPING STUDY | HERITAGE SCOPING STUDY: SOYUZ 3 (PTY) LTD: SOYUZ 3 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Scoping | 20/09/2022 | Nelius Kruger | Exigo3 Sustainability | EOH Coastal and Environmental Services | 23/09/2022 - 11:50 |
Soyuz 4 (Pty) Ltd Heritage Scoping Study | SOYUZ 4 (PTY) LTD: SOYUZ 4 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE : HERITAGE SCOPING STUDY | Heritage Scoping | 20/09/2022 | Nelius Kruger | Exigo3 Sustainability | EOH Coastal and Environmental Services | 23/09/2022 - 12:28 |
Soyuz 4 WEF PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT: Soyuz 4 Wind Energy Facility | PIA Desktop | 20/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 23/09/2022 - 12:30 |
HIA Desktop study Proposed New Matamela Ramaphosa Secondary School at Spa Park Bela-Bela | Heritage Impact Assessment. A Desktop Study. Proposed Construction of the New Matamela Ramaphosa Secondary School at Spa Park Bela-Bela on Portion 266 of the Farm Warmbath 1491. Bela-Bela Local Municipality, Waterberg District, Limpopo Province. | AIA Desktop | 20/09/2022 | Frans Roodt | Ronell Group | 20/09/2022 - 08:49 | |
Letter_Pixley Park Palaeontology | Letter re Palaeontology: PROPOSED DEVELOPMENT OF THE PIXLEY PARK RENEWABLE ENERGY FACILITY NEAR DE AAR, NORTHERN CAPE IN REFERENCE TO LATEST INTERIM COMMENT DATED 12 September 2022 | Palaeontological Specialist Reports | 20/09/2022 | Nicholas Wiltshire, Kimberley Chapelle, Marion Bamford | CTS Heritage | Savannah Environmental (Pty) Ltd | 21/09/2022 - 16:35 |
Soyuz 1 Wind Energy Facility Palaeontological Desktop Assessment | Soyuz 1 Wind Energy Facility Palaeontological Desktop Assessment, Northern Cape | PIA Desktop | 20/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 23/09/2022 - 10:43 |
HIA: Riet Fountain PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Riet Fountain Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:20 |
HIA: Fountain Solar PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Fountain Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:24 |
Mulalo substation | A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF MULALO 400/132KV MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INTEGRATION OF TRANSMISSION AND DISTRIBUTION POWER LINES SOUTH OF SECUNDA, MPUMALANGA PROVINCE | AIA Phase 1B | 21/09/2022 | Anton van Vollenhoven | Archaetnos CC | NCC Environmental Services (Pty) Ltd | 07/12/2022 - 16:26 |
HIA: Carolus PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Carolus Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:26 |
Mulalo | Mulalo substationhttps://sahris.sahra.org.za/heritage-reports/mulalo-substation | AIA Phase 1 | 21/09/2022 | Anton van Vollenhoven | Archaetnos CC | NCC Environmental Services | 23/02/2023 - 13:40 |
HIA: Wagt PV Grid Connection | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Wagt Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:09 |
Phase 1 Heritage Impact Assessment for proposed new Petrol Station on farm Platfontein 68, Kimberley, NC Province. | Phase 1 Heritage Impact Assessment for proposed new Petrol Station on farm Platfontein 68, Kimberley, NC Province. | HIA Phase 1 | 22/09/2022 | Lloyd Rossouw | Paleo Field Service | 26/09/2022 - 12:50 | |
Elsiclox HIA Report | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR A MINE PROSPECTING RIGHT APPLICATION ON THE PORTION 0 OF LOWER ZWART MODDER 79 AND PORTION 0 OF OUPVLAKTE 90, SITUATED WITHIN THE MAGISTERIAL DISTRICT OF KENHARDT, KHAI-MA LOCAL MUNICIPALITY UNDER NAMAKWA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 22/09/2022 | Valerine Molo | 22/09/2022 - 09:41 | ||
Roodepoort Phase 1 AIA | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Roodepoort Colliery Mining Right on Portion 15 of the Farm Roodepoort 40 IS, Kriel, Mpumalanga | AIA Phase 1 | 22/09/2022 | Tobias Coetzee | Agri Civils Geo-Tech & Heritage | Eco Elementum (Pty) Ltd | 30/09/2022 - 19:43 |
HIA: Ummbila Emoyeni EGI | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the UMMBILA EMOYENI RENEWABLE ENERGY FACILITY GRID CONNECTION INFRASTRUCTURE, MPUMALANGA PROVINCE | HIA Phase 1 | 23/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 22/02/2023 - 15:42 |
HIA: Ummbila Emoyeni WEF | Heritage Impact Assessment in terms of section 38(3) of the NHRA for the proposed development of the Ummblia Emoyeni Wind Energy Facility, Mpumalanga | HIA Phase 1 | 23/09/2022 | Jenna Lavin, Heidi Fivaz, Gideon Groenewald | CTS Heritage | Savannah Environmental (Pty) Ltd | 13/10/2022 - 09:23 |
Phase 1 Heritage Impact Assessment and Desktop Paleontological Assessment for the Proposed Light Industrial Development on the Remainder of Lot 20 Marburbug Settlement No 5096 | Phase 1 Heritage Impact Assessment and Desktop Paleontological Impact Assessment for the proposed establishment of a light industrial estate on Rem of Lot 20 Marburg Settlement No. 5096, Ray Nkonyeni Local Municipality, KwaZulu-Natal. | HIA Phase 1 | 23/09/2022 | Phillipa Harrison | Land Matters Environmental Consulting | Land Matters Environmental Consulting | 01/02/2023 - 14:49 |
SOYUZ 5 (PTY) LTD: SOYUZ 5 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HERITAGE SCOPING STUDY | SOYUZ 5 (PTY) LTD: SOYUZ 5 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE: HERITAGE SCOPING STUDY | Heritage Scoping | 23/09/2022 | Nelius Kruger | Exigo3 Sustainability | EOH Coastal and Environmental Services | 27/09/2022 - 09:14 |
Paleontological Desktop Assessment Soyuz 5 Wind Energy Facility | Paleontological Desktop Assessment Soyuz 5 Wind Energy Facility | PIA Desktop | 23/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 27/09/2022 - 09:18 |
SOYUZ 6 (PTY) LTD: SOYUZ 6 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HERITAGE SCOPING STUDY | SOYUZ 6 (PTY) LTD: SOYUZ 6 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE: HERITAGE SCOPING STUDY | Heritage Scoping | 23/09/2022 | Nelius Kruger | Exigo3 Sustainability | EOH Coastal and Environmental Services | 27/09/2022 - 09:43 |
Soyuz 6 Heritage Impact Assessment Report | Soyuz 6 Heritage Impact Assessment Report | Heritage Scoping | 23/09/2022 | Nelius Kruger | Exigo3 Sustainability | EOH Coastal and Environmental Services | 20/10/2022 - 14:44 |
Soyuz 6 Paleontological Desktop Assessment | Soyuz 6 Paleontological Desktop Assessment | PIA Desktop | 23/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 27/09/2022 - 09:45 |
AIA FOR THE PROPOSED BELA-BELA POWER LINE BA PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTIONS OF THE FARMS BUISKOP 464KR AND TWEEFONTEIN 462KR FOR THE PROPOSED BELA-BELA POWER LINE BA PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 25/09/2022 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 24/11/2022 - 10:54 |
Triple A Beef | DESKTOP HIA FOR THE TRIPLE A BEEF ABATTOIR AND FEED LOT | Heritage Impact Assessment Specialist Reports | 25/09/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Independent Environmental Advisor | 10/11/2022 - 16:31 |
Heritage Impact Assessment for the Proposed New Residential Development - Chantelle Extension 35 (Portion 250 of the Farm Hartebeesthoek 303 JR), City Of Tshwane Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment for the Proposed New Residential Development - Chantelle Extension 35 (Portion 250 of the Farm Hartebeesthoek 303 JR), City Of Tshwane Metropolitan Municipality, Gauteng Province. | HIA Phase 1 | 26/09/2022 | Jaco van der Walt | Beyond Heritage | Lokisa Environmental Consulting CC | 23/02/2023 - 10:40 |
1513 SARNIA ROAD, BELLAIR | Affidavit by owner of Property | Built Environment and Cultural Landscapes | 26/09/2022 | 26/09/2022 - 16:26 | |||
Palaeontological Impact Assessment: Phase 1: Field Study | Midtron Minerals (Pty) Ltd - Kapstewel Manganese and Iron Ore Mining Right Application Project Tsantsabane Local Municipality, ZF Mgcawu District Municipality, Northern Cape Province Farm: Remaining Extent of Portion 2, Remaining Extent of Portion 3, Portion 5 and Remaining Extent Kapstewel 436 | PIA Phase 1 | 26/09/2022 | Dr. Heidi Fourie | Dr Heidi Fourie | Midtron Minerals (Pty) Ltd | 26/09/2022 - 19:21 |
Kusile Stormwater Exemption Letter for HIA | EXEMPTION FROM A HERITAGE IMPACT STUDY: PROPOSED STORMWATER AND ASSOCIATED INFRASTRUCTURE FOR THE EXISTING OVERLAND CONVEYER AT THE KUSILE POWER STATION, NEAR DELMAS IN MPUMALANGA | HIA Letter of Exemption | 28/09/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd, Banzai Environmental (Pty) Ltd | Zitholele Consulting (Pty) Ltd | 09/11/2022 - 09:32 |
PHASE 1 HIA HARVARD 1 SOLAR BLOEMFONTEIN | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 8 (HARVARD 1), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/09/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 14/10/2022 - 14:16 |
PHASE 1 HIA HARVARD 2 SOLAR BLOEMFONTEIN | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 5 (HARVARD 2), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/09/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 14/10/2022 - 14:19 |
PIA | PIA Phase 1 | 29/09/2022 | Marion Bamford | 04/10/2022 - 16:43 | |||
Hendrina Heritage Report | Heritage Impact Assessment FOR THE HENDRINA NORTH 132 KV POWERLINE, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 29/09/2022 | Jaco van der Walt | Beyond Heritage | SiVEST SA (Pty) Ltd | 01/11/2022 - 15:30 |