HIA report Solar farm on Holmwood 315 – Blouberg Phase 1 Heritage Impact Assessment Report. Proposed Solar Photovoltaic Facility Development on a Portion of The Farm Holmwood 315 MR, Blouberg Local Municipality, Capricorn District, Limpopo Province. Heritage Impact Assessment Specialist Reports 08/09/2022 Frans Roodt Envirosana Environmental Consultants 08/09/2022 - 11:10
HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN REMAINING EXTENT AND PORTION 1 OF FARM HURLEY 688 PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN REMAINING EXTENT AND PORTION 1 OF FARM HURLEY 688 FOR DIAMOND AND REMAINING EXTENT OF BRETBY 687 FARM FOR MANGANESE AND IRON ORE. IN THE ADMINISTRATIVE DISTRICT OF KURUMAN, NORTHERN CAPE PROVINCE HIA Phase 1 09/09/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd 24/11/2022 - 15:40
Dihatshwane Substation PIA Palaeontological Impact Assessment for the proposed Dihatshwane Substation, Rooigrond, Mahikeng, North West Province PIA Phase 1 11/09/2022 Dr. Heidi Fourie 24/11/2022 - 17:50
Olieboomspoort raw material sourcing Report to SAHRA on Middle Stone Age lithic raw material sourcing from Olieboomspoort (Limpopo Province, South Africa) Archaeological Specialist Reports 11/09/2022 14/12/2022 - 14:58
SANRAL R33 Road Upgrade Project Heritage Impact Assessment for the SANRAL R33 Road Upgrade Project located along the R33 between the N1 Highway and the town of Modimolle, Modimolle-Mookgopong Local Municipality, Waterberg District Municipality, Limpopo Province Heritage Impact Assessment Specialist Reports 11/09/2022 Polke Birkholtz PGS Heritage (Pty) Ltd Environmental Edge 11/10/2022 - 16:49
Heritage Screener: Zondereinde PV Desktop Heritage Screening Assessment: BASIC ASSESSMENT FOR 100MW NORTHAM ZONDEREINDE SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LIMPOPO PROVINCE Heritage Statement 12/09/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 10/10/2022 - 13:31
Queens warehouse Application for Extension of time to 19-348L 13/09/2022 Nadarajan Aubrey Nagan KwaZulu-Natal Amafa and Research Institute Transnet National Ports Authority - Durban 13/09/2022 - 14:53
Survey of cultural Resources Cultural Heritage report for the Proposed establishment of Pienaarsrivier cemetery on ERF 607 in Pienaarsrivier Extension 1 within Bela-Bela Local Municipality, Waterberg District, Limpopo Province. Heritage Impact Assessment Specialist Reports 13/09/2022 J A van Schalkwyk J A van Schalkwyk 12/10/2022 - 10:52
HIA for D192 and Borrow-pits PHASE 1 HERITAGE IMPACT ASSESSMENT SPECIALIST STUDY FOR THE PROPOSED PREVENTATIVE MAINTENANCE OF D192 ROAD AND ASSOCIATED BORROW-PITS WITHIN MOGALAKWENA LOCAL MUNICIPALITY OF WATERBERG DISTRICT MUNICIPALITY OF LIMPOPO PROVINCE HIA Phase 1 14/09/2022 Richard Munyai Vhufa Hashu Heritage Consultants 28/09/2022 - 14:11
Final D6 Phase 4 HIA District Six Phased Redevelopment Heritage Impact Assessment submitted in terms of Section 38(4) of the NHRA (1999): Redevelopment of Erf 177646 as part of Restitution Process, District Six, Cape Town HIA Phase 1 14/09/2022 Katie Smuts, Mike Scurr, Tracey Randle, Amy Feng Rennie Scurr Adendorff Delta Built Environment Consultants (Pty) Ltd 14/09/2022 - 14:19
Development of additional areas for agriculture on the farm Krokodilspruit 248JT Phase 1 AIA//HIA for an additional 76ha for agricultural development (orchards) on the farm Krokodilspruit 248JT, White River area, Mpumalanga Province AIA Phase 1 15/09/2022 Christine Van Wyk Rowe Adansonia Heritage Consultants Rhengu Environmental Services 15/09/2022 - 05:36
Klipkraal WEF 1 Heritge Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 1, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 16/09/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:32
Phase 1 Archeological Impact Assessment for 2 Seam Amendments PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Amendment to the Existing 2-Seam Mine on Portions of the Farms Vlaklaagte 45 IS and Lourens 472 IS, Kriel, Mpumalanga AIA Phase 1 16/09/2022 Agri Civils Geo-Tech & Heritage 14/11/2022 - 08:27
PIA For the Demilander Feedlot Development Palaeontological Impact Assessment for the proposed Feedlot on Farm Demilander 273 between Marquard and Winburg, Free State Province PIA Desktop 18/09/2022 Marion Bamford Prof Marion Bamford SPOOR Environmental Services (PTY) Ltd. 20/09/2022 - 07:55
NHLAZATSHE 1 HIA ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED FORMALIZATION OF NHLAZATSHE TOWNSHIP WITHIN THE CHIEF ALBERT LUTHULI LOCAL MUNICIPALITY OF MPUMALANGA PROVINCE. HIA Phase 1 19/09/2022 Richard Munyai Vhufa Hashu Heritage Consultancy CC 02/12/2022 - 11:02
NETCARE ST AUGUSTINES HOSPITAL DURBAN Netcare St Augustines Hospital Durban ADDITIONS & ALTERATIONS TO THEATRE COMPLEX & ROOF TOP PLANT ROOM 19/09/2022 Wayne Allen 19/09/2022 - 09:32
SOYUZ 2 (Pty) Ltd: PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT: Soyuz 2 Wind Energy Facility PIA Desktop 20/09/2022 Elize Butler Banzai Environmental (Pty) Ltd EOH Coastal and Environmental Services 23/09/2022 - 11:26
SOYUZ 3 WEF HERITAGE SCOPING STUDY HERITAGE SCOPING STUDY: SOYUZ 3 (PTY) LTD: SOYUZ 3 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Scoping 20/09/2022 Nelius Kruger Exigo3 Sustainability EOH Coastal and Environmental Services 23/09/2022 - 11:50
Soyuz 4 (Pty) Ltd Heritage Scoping Study SOYUZ 4 (PTY) LTD: SOYUZ 4 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE : HERITAGE SCOPING STUDY Heritage Scoping 20/09/2022 Nelius Kruger Exigo3 Sustainability EOH Coastal and Environmental Services 23/09/2022 - 12:28
Soyuz 4 WEF PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT: Soyuz 4 Wind Energy Facility PIA Desktop 20/09/2022 Elize Butler Banzai Environmental (Pty) Ltd EOH Coastal and Environmental Services 23/09/2022 - 12:30
HIA Desktop study Proposed New Matamela Ramaphosa Secondary School at Spa Park Bela-Bela Heritage Impact Assessment. A Desktop Study. Proposed Construction of the New Matamela Ramaphosa Secondary School at Spa Park Bela-Bela on Portion 266 of the Farm Warmbath 1491. Bela-Bela Local Municipality, Waterberg District, Limpopo Province. AIA Desktop 20/09/2022 Frans Roodt Ronell Group 20/09/2022 - 08:49
Letter_Pixley Park Palaeontology Letter re Palaeontology: PROPOSED DEVELOPMENT OF THE PIXLEY PARK RENEWABLE ENERGY FACILITY NEAR DE AAR, NORTHERN CAPE IN REFERENCE TO LATEST INTERIM COMMENT DATED 12 September 2022 Palaeontological Specialist Reports 20/09/2022 Nicholas Wiltshire, Kimberley Chapelle, Marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 21/09/2022 - 16:35
Soyuz 1 Wind Energy Facility Palaeontological Desktop Assessment Soyuz 1 Wind Energy Facility Palaeontological Desktop Assessment, Northern Cape PIA Desktop 20/09/2022 Elize Butler Banzai Environmental (Pty) Ltd EOH Coastal and Environmental Services 23/09/2022 - 10:43
HIA: Riet Fountain PV Grid HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Riet Fountain Solar PV1 Facility near De Aar, Northern Cape Province HIA Phase 1 21/09/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/10/2022 - 09:20
HIA: Fountain Solar PV Grid HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Fountain Solar PV1 Facility near De Aar, Northern Cape Province HIA Phase 1 21/09/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/10/2022 - 09:24
Mulalo substation A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF MULALO 400/132KV MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INTEGRATION OF TRANSMISSION AND DISTRIBUTION POWER LINES SOUTH OF SECUNDA, MPUMALANGA PROVINCE AIA Phase 1B 21/09/2022 Anton van Vollenhoven Archaetnos CC NCC Environmental Services (Pty) Ltd 07/12/2022 - 16:26
HIA: Carolus PV Grid HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Carolus Solar PV1 Facility near De Aar, Northern Cape Province HIA Phase 1 21/09/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/10/2022 - 09:26
Mulalo Mulalo substationhttps://sahris.sahra.org.za/heritage-reports/mulalo-substation AIA Phase 1 21/09/2022 Anton van Vollenhoven Archaetnos CC NCC Environmental Services 23/02/2023 - 13:40
HIA: Wagt PV Grid Connection HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Wagt Solar PV1 Facility near De Aar, Northern Cape Province HIA Phase 1 21/09/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/10/2022 - 09:09
Phase 1 Heritage Impact Assessment for proposed new Petrol Station on farm Platfontein 68, Kimberley, NC Province. Phase 1 Heritage Impact Assessment for proposed new Petrol Station on farm Platfontein 68, Kimberley, NC Province. HIA Phase 1 22/09/2022 Lloyd Rossouw Paleo Field Service 26/09/2022 - 12:50
Elsiclox HIA Report PHASE 1 HERITAGE IMPACT ASSESSMENT FOR A MINE PROSPECTING RIGHT APPLICATION ON THE PORTION 0 OF LOWER ZWART MODDER 79 AND PORTION 0 OF OUPVLAKTE 90, SITUATED WITHIN THE MAGISTERIAL DISTRICT OF KENHARDT, KHAI-MA LOCAL MUNICIPALITY UNDER NAMAKWA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. HIA Phase 1 22/09/2022 Valerine Molo 22/09/2022 - 09:41
Roodepoort Phase 1 AIA PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Roodepoort Colliery Mining Right on Portion 15 of the Farm Roodepoort 40 IS, Kriel, Mpumalanga AIA Phase 1 22/09/2022 Tobias Coetzee Agri Civils Geo-Tech & Heritage Eco Elementum (Pty) Ltd 30/09/2022 - 19:43
HIA: Ummbila Emoyeni EGI HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the UMMBILA EMOYENI RENEWABLE ENERGY FACILITY GRID CONNECTION INFRASTRUCTURE, MPUMALANGA PROVINCE HIA Phase 1 23/09/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 22/02/2023 - 15:42
HIA: Ummbila Emoyeni WEF Heritage Impact Assessment in terms of section 38(3) of the NHRA for the proposed development of the Ummblia Emoyeni Wind Energy Facility, Mpumalanga HIA Phase 1 23/09/2022 Jenna Lavin, Heidi Fivaz, Gideon Groenewald CTS Heritage Savannah Environmental (Pty) Ltd 13/10/2022 - 09:23
Phase 1 Heritage Impact Assessment and Desktop Paleontological Assessment for the Proposed Light Industrial Development on the Remainder of Lot 20 Marburbug Settlement No 5096 Phase 1 Heritage Impact Assessment and Desktop Paleontological Impact Assessment for the proposed establishment of a light industrial estate on Rem of Lot 20 Marburg Settlement No. 5096, Ray Nkonyeni Local Municipality, KwaZulu-Natal. HIA Phase 1 23/09/2022 Phillipa Harrison Land Matters Environmental Consulting Land Matters Environmental Consulting 01/02/2023 - 14:49
SOYUZ 5 (PTY) LTD: SOYUZ 5 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HERITAGE SCOPING STUDY SOYUZ 5 (PTY) LTD: SOYUZ 5 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE: HERITAGE SCOPING STUDY Heritage Scoping 23/09/2022 Nelius Kruger Exigo3 Sustainability EOH Coastal and Environmental Services 27/09/2022 - 09:14
Paleontological Desktop Assessment Soyuz 5 Wind Energy Facility Paleontological Desktop Assessment Soyuz 5 Wind Energy Facility PIA Desktop 23/09/2022 Elize Butler Banzai Environmental (Pty) Ltd EOH Coastal and Environmental Services 27/09/2022 - 09:18
SOYUZ 6 (PTY) LTD: SOYUZ 6 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HERITAGE SCOPING STUDY SOYUZ 6 (PTY) LTD: SOYUZ 6 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE: HERITAGE SCOPING STUDY Heritage Scoping 23/09/2022 Nelius Kruger Exigo3 Sustainability EOH Coastal and Environmental Services 27/09/2022 - 09:43
Soyuz 6 Heritage Impact Assessment Report Soyuz 6 Heritage Impact Assessment Report Heritage Scoping 23/09/2022 Nelius Kruger Exigo3 Sustainability EOH Coastal and Environmental Services 20/10/2022 - 14:44
Soyuz 6 Paleontological Desktop Assessment Soyuz 6 Paleontological Desktop Assessment PIA Desktop 23/09/2022 Elize Butler Banzai Environmental (Pty) Ltd EOH Coastal and Environmental Services 27/09/2022 - 09:45
AIA FOR THE PROPOSED BELA-BELA POWER LINE BA PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTIONS OF THE FARMS BUISKOP 464KR AND TWEEFONTEIN 462KR FOR THE PROPOSED BELA-BELA POWER LINE BA PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 25/09/2022 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 24/11/2022 - 10:54
Triple A Beef DESKTOP HIA FOR THE TRIPLE A BEEF ABATTOIR AND FEED LOT Heritage Impact Assessment Specialist Reports 25/09/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Independent Environmental Advisor 10/11/2022 - 16:31
Heritage Impact Assessment for the Proposed New Residential Development - Chantelle Extension 35 (Portion 250 of the Farm Hartebeesthoek 303 JR), City Of Tshwane Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment for the Proposed New Residential Development - Chantelle Extension 35 (Portion 250 of the Farm Hartebeesthoek 303 JR), City Of Tshwane Metropolitan Municipality, Gauteng Province. HIA Phase 1 26/09/2022 Jaco van der Walt Beyond Heritage Lokisa Environmental Consulting CC 23/02/2023 - 10:40
1513 SARNIA ROAD, BELLAIR Affidavit by owner of Property Built Environment and Cultural Landscapes 26/09/2022 26/09/2022 - 16:26
Palaeontological Impact Assessment: Phase 1: Field Study Midtron Minerals (Pty) Ltd - Kapstewel Manganese and Iron Ore Mining Right Application Project Tsantsabane Local Municipality, ZF Mgcawu District Municipality, Northern Cape Province Farm: Remaining Extent of Portion 2, Remaining Extent of Portion 3, Portion 5 and Remaining Extent Kapstewel 436 PIA Phase 1 26/09/2022 Dr. Heidi Fourie Dr Heidi Fourie Midtron Minerals (Pty) Ltd 26/09/2022 - 19:21
Kusile Stormwater Exemption Letter for HIA EXEMPTION FROM A HERITAGE IMPACT STUDY: PROPOSED STORMWATER AND ASSOCIATED INFRASTRUCTURE FOR THE EXISTING OVERLAND CONVEYER AT THE KUSILE POWER STATION, NEAR DELMAS IN MPUMALANGA HIA Letter of Exemption 28/09/2022 Wouter Fourie PGS Heritage (Pty) Ltd, Banzai Environmental (Pty) Ltd Zitholele Consulting (Pty) Ltd 09/11/2022 - 09:32
PHASE 1 HIA HARVARD 1 SOLAR BLOEMFONTEIN PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 8 (HARVARD 1), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 28/09/2022 Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 14/10/2022 - 14:16
PHASE 1 HIA HARVARD 2 SOLAR BLOEMFONTEIN PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 5 (HARVARD 2), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 28/09/2022 Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 14/10/2022 - 14:19
PIA PIA Phase 1 29/09/2022 Marion Bamford 04/10/2022 - 16:43
Hendrina Heritage Report Heritage Impact Assessment FOR THE HENDRINA NORTH 132 KV POWERLINE, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2022 Jaco van der Walt Beyond Heritage SiVEST SA (Pty) Ltd 01/11/2022 - 15:30