THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17551 - 17600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Bhekuzulu HIA & Desktop Palaeo | Survey of the Proposed Bhekuzulu, Epangweni and Ennersdale Water Supply Scheme, Estcourt, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | 08/04/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Terratest (Pty) Ltd | 09/03/2018 - 11:54 | |
SASOL LIMPOPO WEST | SASOL LIMPOPO WEST HERITAGE REPORT | Heritage Impact Assessment Specialist Reports | 01/04/2013 | Thomas Huffman, Jaco van der Walt | University of the Witwatersrand - Archaeological Resources Management | SRK Consulting (Pty) Ltd - Pretoria | 31/07/2013 - 11:24 | |
Beaufort West Electrical Infrastructure Heritage Report | Proposed Construction of a 132kV – 400kV Linking Station, two 132kV Power Lines and two onsite 132kV Substations for the Mainstream Wind Energy Facilities, near Beaufort West in the Western Cape Province | Heritage Impact Assessment Specialist Reports | 08/04/2016 | Mary Patrick | Cape Archaeological Survey CC | Sivest - Gauteng | 22/04/2016 - 12:43 | |
Goedetrouw, Ketting subs and 132kV lines Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 31/08/2015 | Anton van Vollenhoven | Archaetnos CC | Texture Environmental Consultants | 03/11/2015 - 14:13 | ||
1524 HIA Eskom Gamohaan Powerline | Heritage Impact Assessment report for the Eskom Gamohaan – Seven Miles 22kV Powerline | Heritage Impact Assessment Specialist Reports | 08/09/2022 | Michelle Sachse | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 07/10/2022 - 12:37 | |
Cultural heritage impact assessment | Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED BOITSHOKO SOLAR POWER PLANT ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM LIMEBANK NO 471 REGISTRATION DIVISION KURUMAN, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2016 | Johann van Schalkwyk | 25/05/2016 - 15:41 | |||
Leeumax PV Heritage Impact Report | DEVELOPMENT OF THE LEEUMAX 1 SOLAR PV FACILITY, 15MW AND ASSOCIATED INFRA-STRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 17/11/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 25/11/2022 - 15:33 | |
HIA for 37 Middleton Road | Heritage Survey of the Development of a Housing Estate - Queensburgh | Heritage Impact Assessment Specialist Reports | 27/05/2019 - 15:41 | |||||
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 09:21 | |
ESK3520 - HBAR | Basic Assessment Report and Environmental Management Programme for Environmental Authorisation for the Proposed Rehabilitation at Eskom Kilbarchan Colliery, Newcastle, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | 29/04/2016 | Justin du Piesanie | Digby Wells Environmental | Eskom Holdings SOC Limited | 18/10/2016 - 07:27 | |
p608 | DESKTOP HIA SURVEY FOR THE UPGRADE OF THE P608-D604 | Heritage Impact Assessment Specialist Reports | 15/02/2023 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Terratest (Pty) Ltd | 11/08/2023 - 10:13 | |
Stonewall quarry | HERITAGE DESKTOP FOR THE STONEWALL QUARRY, KOKSTRAD, KZN | Heritage Impact Assessment Specialist Reports | 13/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | GCS Water and Environmental Consultants - Head Office JHB | 12/11/2022 - 11:33 | |
HIA, proposed photo-voltaic facility, Steenrotsfontein farm 168 (portion 1), Beaufort West | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED PHOTO-VOLTAIC FACILITY ON STEENROTS FONTEIN 168/1, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 07/07/2011 | Jayson Orton | ACO Associates CC | CSIR | CTS_503109 | 09/04/2018 - 15:48 |
Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection | Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection, Hantam Local Municipality, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 05/12/2022 | Jenna Lavin | CTS Heritage | Nala Environmental (Pty) Ltd | 24/01/2023 - 15:22 | |
Heritage Report - Slurry | Cultural Heritage Assessment for the Proposed Establishment of a Solar Energy Facility and associated infrastructure, PPC Slurry, Mafikeng Local Municipality, Central District Municipality, North West Province | Heritage Impact Assessment Specialist Reports | 01/02/2013 | Francois P Coetzee | Department of Anthropology and Archaeology, UNISA | Savannah Environmental (Pty) Ltd | 11/11/2013 - 08:25 | |
HIA for the proposed development of a chicken broiler facility | Heritage Impact Assessment for the proposed development of a chicken broiler facility on Portion 40 of the Farm Jonathan 175- JQ, Brits, North West. | Heritage Impact Assessment Specialist Reports | Reinett Mogotshi | CSIR | ASHA Consulting(Pty) Ltd | 08/05/2020 - 14:06 | ||
HIA: PROPOSED BEESHOEK RAILWAY LINE LINK | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEESHOEK RAILWAY LINE LINK, POSTMASBURG, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 31/07/2019 | Jaco van der Walt | HCAC Heritage Consultants | Envirogistics (Pty) Ltd | 27/08/2021 - 09:17 | |
Documentation of a number of BRIDGE AND CULVERT STRUCTURES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE | Documentation of a number of BRIDGE AND CULVERT STRUCTURES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 27/05/2015 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | Chameleon Environmental | 17/06/2015 - 15:53 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND GRID CONNECTIONS TO BE SITUATED IN THE WESTERN CAPE PROVINCE, ESCARPMENT AREA, MOORDENAARS KAROO, | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Renewable Energy Consulting Limited | 26/04/2016 - 10:08 | |
Tlisitseng Substations and Power Lines Heritage Reports | TLISITSENG PROJECT - TLISITSENG 1 SUBSTATION AND POWER LINE: Heritage Impact Assessment TLISITSENG PROJECT - TLISITSENG 2 SUBSTATION AND POWER LINE: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 12/07/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 23/03/2017 - 12:35 | |
Sibanye Gold PV Facility Project | Heritage Impact Assessment as part of the Environmental Impact Assessment Report for the new 200MW Photovoltaic Energy Facility Proposed for Sibanye Gold, Gauteng | Heritage Impact Assessment Specialist Reports | 15/02/2016 | Wouter Fourie | PGS Heritage (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 21/07/2021 - 12:51 | |
HIA Artscape Roggebaai | HERITAGE IMPACT ASSESSMENT PREPARED IN TERMS OF SECTION 38(4) OF THE NATIONAL HERITAGE RESOURCES ACT. THE PROPOSED REDEVELOPMENT OF THE ARTSCAPE PRECINCT ERVEN 186 & 187 ROGGEBAAI CAPE TOWN | Heritage Impact Assessment Specialist Reports | 13/07/2020 | Cindy Postlethwayt | Cindy Postlethwayt - Heritage Consultant | Western Cape Government - Department of Transport and Public Works | 05/08/2020 - 13:27 | |
Braklaagte Heritage and Palaeontogy walkdown reports | Preconstruction Archaeological Survey of the Mainstream Kentani Suite PV Projects (Braklaagte), Dealesville, Free State. | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 09:46 | |
LED2003 - NID | Notification of Intent to Develop for the Koert Louw Zyn Pan MRA | Heritage Impact Assessment Specialist Reports | 27/02/2017 | Johan Nel, Justin du Piesanie | Digby Wells Environmental | Waterberg One Coal (Pty) Ltd | 06/03/2017 - 13:20 | |
HIA, borrow pit extension (DR02242/0.3/R/100) on portion 1 of Dassen Klip A 169 near Porterville | Heritage Impact Assessment: MR 02242 Piketberg Porterville - West Coast District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 27/03/2013 | Vidamemoria Heritage Consultants | Nadeson Consulting Services | CTS_503683 | 17/04/2018 - 18:48 | |
BRMO - New Railway Bridge Heritage Report | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. | Heritage Impact Assessment Specialist Reports | 01/03/2019 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Assmang Black Rock Mining Operations | 30/05/2019 - 11:59 | |
Thornhill Bulk Water - Nqadu Corridor | Archaeological and Heritage Impact Assessment Report for Proposed Thornhill Bulk Water Supply Project (Nqadu Corridor) within OR Tambo Local Municipality in the Eastern Cape Province | Heritage Impact Assessment Specialist Reports | 01/12/2013 | Steve K Kalule | 03/06/2014 - 14:11 | |||
Addemdum: Vetlaagte Heritage | UKUQALA GRID CONNECTION PROJECT: CHANGES TO PROJECT COMPONENTS - Heritage Impacts | Heritage Impact Assessment Specialist Reports | 14/11/2022 | Jenna Lavin | CTS Heritage | Landscape Dynamics Environmental Consultants | 15/11/2022 - 11:10 | |
Normandie DBAR Heritage Report | Cultural Heritage Impact Assessment Of The Proposed Normandie-Hlungwane, Coal-Link Project, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 16/01/2014 | Frans Prins | Sivest - Gauteng | 21/04/2015 - 10:54 | ||
Rondekop Heritage Impact Assessment Report | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED 325MW RONDEKOP WIND ENERGY FACILITY BETWEEN MATJIESFONTEIN SUTHERLAND IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 10/09/2018 | IIan Smeyatsky | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 09/05/2019 - 16:42 | |
Heritage Report | Heritage Impact Assessment Specialist Reports | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/01/2023 - 11:12 | |||
Boven PV1 report HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BOVEN SOLAR PV1 FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 17/11/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:09 | |
Vryburg Solar 1 Heritage Report | Gultural Heritage Impact Assessment for the Proposed Development of a 100 MW (115(MW DC) Solar Photovoltaic Facility (Vryburg Solar 1) and Associated 132kv Transmission Line near Vryburg, North West Province. | Heritage Impact Assessment Specialist Reports | 03/08/2018 | J.A. van Schalkwyk | J van Schalkwyk | 16/08/2018 - 14:55 | ||
HIA: EZIKHUMBENI CAUSEWAY | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EZIKHUMBENI CAUSEWAY IN ULUNDI MUNICIPAL AREA, NORTERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/02/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 17/02/2014 - 12:11 | |
HIA-BlackwoodPowerline | Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, South East of Kimblery, in the Tokologo Local Municipality, Free State: Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 25/08/2014 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 24/03/2015 - 10:48 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED TOWNSHIP ESTABLISHMENT ON FARM BELLEVUE 74 LT AT KAWAYENI VILLAGE, MAKHADO LOCAL MUNICIPALITY, VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 03/04/2021 | Ndivhuho Eric Mathoho | 23/07/2021 - 12:59 | |||
Proposed CIA Amendment Process, Richards Bay | HERITAGE SURVEY OF THE PROPOSED RICHARDS BAY CENTRAL INDUSTRIAL AREA | Heritage Impact Assessment Specialist Reports | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - Grahamstown | 10/05/2017 - 13:01 | ||
HIA Camden I WEF 132kV Grid Connection | Heritage Impact Assessment for the proposed Camden I Wind Grid Connection, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 02/05/2022 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 11/05/2023 - 14:34 | |
Heritage Impact Assessment Report | Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 08/03/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 08/03/2017 - 13:31 | |
ABO Ujekamanzi MTS & LILO2 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 2 LILO and MTS Infrastructure near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 20/06/2023 - 16:16 | |
Heritage Impact Assessment - PR11296 | Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. | Heritage Impact Assessment Specialist Reports | 09/12/2015 | Lloyd Rossouw | Paleo Field Services | Black Mountain Mining (PTY) LTD | 10/12/2015 - 11:47 | |
Tiffany Expansion Heritage Impact Assessment | HIA OF PROPOSED TIFFANY SUPERMARKET EXPANSION, SALT ROCK, KZN | Heritage Impact Assessment Specialist Reports | 13/02/2023 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SiVEST SA (Pty) Ltd | 22/08/2023 - 10:53 | |
Paarde Valley PV2 OHPL Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINE FOR PAARDE VALLEY PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 16/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | Holland & Associates Environmental Consultants | 12/07/2022 - 15:12 | |
Heritage Impact Assessment - COZA IRON ORE PROJECT | Remainder of the farm Driehoekspan 435 located north of Postmasburg in the Northern Cape Province - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/11/2015 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | 01/08/2016 - 09:16 | ||
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED COAL MINING RIGHT APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON PORTION 1 OF THE FARM ANNYSSPRUIT 140 HT AND THE REMAINING EXTENT OF THE FARM MOOIHOEK 168 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 06/08/2023 | 06/06/2023 - 19:16 | ||||
Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) PROPOSED UPGRADING OF EXISTING LOW-LEVEL BRIDGE GA-MAWELA VILLAGE, STEELPOORT, LIMPOPO | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) PROPOSED UPGRADING OF EXISTING LOW-LEVEL BRIDGE GA-MAWELA VILLAGE, STEELPOORT, LIMPOPO STATEMENT WITH REGARD TO HERITAGE RESOURCES MANAGEMENT | Heritage Impact Assessment Specialist Reports | 19/09/2012 | Liesl Stegmann | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 11/03/2016 - 09:08 | |
Coleskop Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | Umlando: Archaeological Surveys & Heritage Management | 20/08/2019 - 09:08 | |||||
HERITAGE IMPACT ASSESSMENT OF NGWADINI RESERVOIR | HERITAGE IMPACT ASSESSMENT OF NGWADINI RESERVOIR, UMKOMAZI RIVER CATCHMENT,KWAZULU-NATAL, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 11/07/2006 | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Durban | 09/12/2021 - 12:48 | ||
HDBR Heritage Report | HERITAGE IMPACT ASSESSMENT: FOR THE PROPOSED CONSTRUCTION OF THE 2 KM LONG HOLSDAM BARKLEY RIVER FARMERS 11KV POWERLINE | Heritage Impact Assessment Specialist Reports | 02/11/2022 | Jaco van der Walt | 1World Consultants (Pty) Ltd | 1World Consultants (Pty) Ltd | 03/11/2022 - 16:12 | |
DUT Ritson Rd Campus - Visual Impact Assessment | DUT Ritson Rd Campus - Visual Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 - 10:34 |