THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17751 - 17800 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
1469_HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KAREERAND PIPELINES PROJECT FOR HARMONY MINE, BETWEEN KLERKSDORP AND POTCHEFSTROOM, NORTH WEST PROVINCE. | Heritage Impact Assessment Specialist Reports | 02/12/2021 | Nikki Mann | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 04/02/2022 - 12:19 |
Proposed CIA Amendment Process, Richards Bay | HERITAGE SURVEY OF THE PROPOSED RICHARDS BAY CENTRAL INDUSTRIAL AREA | Heritage Impact Assessment Specialist Reports | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - Grahamstown | 10/05/2017 - 13:01 | |
Heritage Impact Assessment - Proposed132kV Emoyeni Grid Infrastructure | HERITAGE IMPACT ASSESSMENT - THE PROPOSED 132kV POWERLINE ASSOCIATED WITH THE EMOYENI WIND ENERGY FACILITIES AND ASSOCIATED INFRASTRUCTURE, NEAR MURRAYSBURG, WESTERN AND NORTHERN CAPE PROVINCES. | Heritage Impact Assessment Specialist Reports | 01/09/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 16/09/2022 - 08:05 |
BOESMANSPUT 152, FAURESMITH | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT BOESMANSPUT 152, FAURESMITH, FREE STATE | Heritage Impact Assessment Specialist Reports | 28/07/2014 | Cobus Dreyer | De Beers Consolidated Mines (Pty) Ltd | De Beers Consolidated Mines (Pty) Ltd | 18/09/2014 - 22:18 |
Heritage Impact Assessment Report | Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 08/03/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 08/03/2017 - 13:31 |
Cultural Heritage Impact Assessment | Cultural Heritage Impact Assessment of The Proposed Ngomankulu/Nsuze Bridge, Ward 11, Nkandla Municipality | Heritage Impact Assessment Specialist Reports | 16/11/2013 | Frans Prins | Active Heritage CC | Terratest (Pty) Ltd | 16/11/2013 - 13:44 |
BOWKER’S PARK, QUEENSTOWN, SOUTH EASTERN CAPE | ARCHAEOLOGICAL, PALAEONTOLOGICAL & GEOLOGICAL INVESTIGATION OF THE PROPOSED MINING APPLICATION ON A PORTION OF THE FARM BOWKER’S PARK, QUEENSTOWN, SOUTH EASTERN CAPE | Heritage Impact Assessment Specialist Reports | 25/05/2014 | Cobus Dreyer, Johan Loock | Greenmined Environmental | Greenmined Environmental | 20/01/2015 - 12:34 |
HANTAM NAROSIES HELIOS LOERIESFONTEIN | FIRST PHASE ARCHAEOLOGICAL, GEOLOGICAL & PALAEONTOLOGICAL INVESTIGATION OF THE PROPOSED 132KV POWER LINE FROM THE HANTAM 3PV SOLAR PLANT TO HELIOS SUB-STATION NEAR LOERIESFONTEIN, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 15/10/2015 | Cobus Dreyer | Eskom Distribution Division | Eskom Distribution Division | 10/11/2015 - 14:38 |
Pofadder 2 WEF Heritage Reports | PROPOSED POFADDER WIND ENERGY FACILITY 2, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 01/03/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SiVEST SA (Pty) Ltd | 29/03/2022 - 11:18 |
Zandspruit Sewer HIA | SPECIALIST OPINION FOR THE CHANGE OF THE ALIGNMENT FOR THE PROPOSED BULK SEWER LINE ON PORTIONS OF THE FARM ZANDSPRUIT 191iq, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 19/07/2022 | J A van Schalkwyk | 23/01/2023 - 14:34 | ||
Heritage Impact Assessment - COZA IRON ORE PROJECT | Remainder of the farm Driehoekspan 435 located north of Postmasburg in the Northern Cape Province - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/11/2015 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | 01/08/2016 - 09:16 | |
HIA Harmony Reclamation Project | THE PROPOSED HARMONY FSS6 RECLAMATION PIPELINE, WELKOM, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 28/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 26/11/2021 - 12:15 |
ENNERDALE EXTENSION 6 ON ERF 4625 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ENNERDALE EXTENSION 6 ON ERF 4625 GAUTENG PROVINCE. | Heritage Impact Assessment Specialist Reports | 11/10/2022 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 25/10/2022 - 16:08 |
Fleurhof Pipe HIA | Fleurhof Pipeline Basic Cultural Heritage Assessment | Heritage Impact Assessment Specialist Reports | Johnny Van Schalkwyk | 31/10/2013 - 11:39 | |||
HIAR Crossroads Mall | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED SHOPPING MALL DEVELOPMENT CLOSE TO SPRINGS, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 01/11/2013 | Anton van Vollenhoven | Archaetnos CC | AECOM SA - Head Office | 30/01/2014 - 08:22 |
Coleskop Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | Umlando: Archaeological Surveys & Heritage Management | 20/08/2019 - 09:08 | ||||
Heritage preconstruction walthrough report for Sutherland WEF | PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES | Heritage Impact Assessment Specialist Reports | 01/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2022 - 10:07 |
THE PROPOSED LOERIESFONTEIN BULK WATER SUPPLY PIPELINE AND RESERVOIR, LOERIESFONTEIN, NORTHERN CAPE | HERITAGE IMPACT ASSESSMENT: THE PROPOSED LOERIESFONTEIN BULK WATER SUPPLY PIPELINE AND RESERVOIR, LOERIESFONTEIN, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 30/06/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 28/10/2014 - 10:58 |
Updated Ithemba Grid Heritage Impact Assessment Report 2 | Ithemba Wind Energy Facility (WEF) – 132kV Grid connection and substation Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 23/03/2018 - 12:00 |
HIA report | Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/11/2021 | 11/11/2021 - 11:36 | |||
22142-HIA | For the proposed Borrow Pits and Quarries required for the SANRA (Trac N4) road upgrade of the Schoemnakloof (R539) Route, Mpumalanga | Heritage Impact Assessment Specialist Reports | 01/08/2022 | 10/10/2022 - 08:52 | |||
Springhaas LiLo 2 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:24 |
Updated !Xha Boom Grid Heritage Impact Assessment Report | Xha! Boom Wind Energy Facility (WEF) – 132kV Grid connection and substation: Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 26/02/2018 - 15:16 |
TLOU GAS POWER PLANT HIA | Heritage Impact Assessment Specialist Reports | 01/10/2020 | Mabuda Mmbudziseni Moses | MULAIFA DEVELOPMENT PROJECTS | Nsovo Environmental Consulting | 30/03/2021 - 13:45 | |
Upgrade of Enhlalakahle Roads and Construction of the Bridge | A HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ENHLALAKAHLE ROADS AND CULVERT BRIDGE, NEAR GREYTOWN, UMVOTI LOCAL MUNICIPALITY. | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Thlaho Environmental Consultants | 06/06/2019 - 12:54 | |
HIA Jikijiki Road Upgrade | Phase 1 Heritage Impact Assessment Report Jikijiki Road Upgrade Project, near Greytown, Kwa Zulu Natal Province | Heritage Impact Assessment Specialist Reports | 02/01/2013 | Stephan Gaigher | G & A Heritage | 11/06/2013 - 11:34 | |
Heritage - Richards Bay Gas to Power | Heritage Screening report for the Proposed Gas to Power Plant within the Richards Bay IDZ, KwaZulu-Natal Province | Heritage Impact Assessment Specialist Reports | 24/04/2015 | Mariagrazia Galimberti | CTS Heritage | Savannah Environmental (Pty) Ltd | 13/11/2015 - 16:20 |
HIA Hesketh Race Track | HERITAGE SURVEY OF THE PROPOSED HESKETH COUNTRY ESTATE, PIETERMARITZBURG, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 22/07/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Independent Environmental Advisor | 14/07/2017 - 10:00 |
HIA for Thabong | Cultural Heritage Impact Assessment Report for the Proposed SANRAL Thabong Interchange Development, Welkom Region, Free State Province | Heritage Impact Assessment Specialist Reports | 31/03/2014 | 19/08/2015 - 17:36 | |||
HIA Aggeneys PV1 | HERITAGE IMPACT ASSESSMENT: PROPOSED AGGENEYS 1 – 100MW SOLAR PV FACILITY AND ASSOCIATED INFRASTRUCTURE NEAR AGGENEYS, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 16/05/2019 - 10:30 |
Westgate Substation | PHASE 1 ARCHAEOLOGICAL/HERITAGE IMPACT ASSESSMENT FOR WESTGATE SUBSTATION EXTENSION IN THE KAKGISO AREA OF MOGALE CITY LOCAL MUNICIPALITY IN GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/03/2019 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Eskom - CROU | 01/10/2020 - 20:43 |
Mpameni Road HIA & PIA | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MPAMENI ROAD UPGRADE, OKHAHLAMBA LOCAL MUNICIPALITY KWAZULU NATAL. & PALAEONTOLOGICAL IMPACT ASSESSMENT (PHASE 2) FOR THE MPAMENI ROAD UPGRADE, OKHAHLAMABA LOCAL MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 18/09/2018 | 20/09/2018 - 15:31 | |||
Heritage Assessment Of The Ncome Museum Complex, Nquthu/Ndundee, kwaZulu-Natal, South Africa. | Heritage Assessment Of The Ncome Museum Complex, Nquthu/Ndundee, kwaZulu-Natal, South Africa. | Heritage Impact Assessment Specialist Reports | 30/06/2006 | eThembeni Cultural Heritage | eThembeni Cultural Heritage | 16/03/2021 - 12:54 | |
Klipkraal WEF 5 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 13/09/2023 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | SiVEST SA (Pty) Ltd | 24/09/2023 - 17:54 |
Upgrade of the N3 Toll Highway | Cultural heritage impact assessment for the PROPOSED UPGRADE OF A SECTION OF THE N3, CEDARA OFF-RAMP TO THE UMGENI AREA, KWAZULU-NATAL. | Heritage Impact Assessment Specialist Reports | 31/07/2013 | Johnny Van Schalkwyk | SANRAL | 05/02/2014 - 20:14 | |
LES4548 - Addendum | Addendum to the Notification of Intent to Develop Case ID: 11130 | Heritage Impact Assessment Specialist Reports | 20/06/2017 | Justin du Piesanie | Digby Wells Environmental | Ekurhuleni Metropolitan Municipality | 20/06/2017 - 07:30 |
Werda HIA | PHASE 1 HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON REMAINING PORTION OF THE FARM JACOBSFONTEIN 503 (WERDA) NEAR POSTMASBURG IN THE NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 29/09/2016 | Edward Matenga | 31/01/2017 - 10:01 | ||
50MW Khauta eNyane Heritage Assessment | 50MW Khauta eNyane Heritage Assessment_Final | Heritage Impact Assessment Specialist Reports | 01/08/2022 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroworks | 07/03/2023 - 15:13 |
Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/06/2016 | Marko Hutten | Tekplan Environmental | 11/07/2016 - 08:55 | |
Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities | Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities at the Anglo American Platinum’s Amandelbult Mine at Thabazimbi, Limpopo Province | Heritage Impact Assessment Specialist Reports | 26/05/2016 | Stephan Gaigher, JF Durand, Lynette Herbst | G&A Heritage Management Consultants | Aurecon South Africa (Pty) Ltd | 03/04/2017 - 09:12 |
HIA; Eskom Line Renewal and Substation Upgrades Bredasdorp -Arniston | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RENEWAL OF THE BREDASDORP –ARNISTON 66KV ESKOM LINE AND SUBSTATION UPGRADES | Heritage Impact Assessment Specialist Reports | 01/06/2011 | Timothy Hart, Natalie Kendrick | ACO Associates CC | Landscape Dynamics - Cape Town | 04/04/2018 - 12:05 |
HIA Report Sutherland & Rietrug WEF Grid Infrastructure | HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 04/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 15/11/2021 - 08:26 | |
Heritage Impact Assessment for the Murray Road Mixed-Use Development | HERITAGE IMPACT ASSESSMENT Assessment of Structures and proposed development at 220 Murray/ Gladys Manzi road, New England, Pietermaritzburg. | Heritage Impact Assessment Specialist Reports | 01/06/2022 | Lindsay Napier | 05/12/2022 - 11:17 | ||
HIA Application - replacement of Quay wall 3&4 and Ferry Landing in EL Port | Heritage Impact Assessment Report IN TERMS OF SECTION 34 (1) OF NHRA FOR THE PROPOSED REPAIR AND PLACEMENT OF PORT STRUCTURES QUAY 3 & 4 AND FERRY LANDING IN THE PORT OF EAST LONDON IN THE EASTERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/11/2022 | jennifer Mokakabye | Setjo Sesho Consultants | Transnet National Ports Authority - East London | 12/09/2023 - 18:13 |
Proposed reclamation of the Marievale TSF | The proposed reclamation of the Marievale Tailings Storage Facilities in Ekurhuleni, Gauteng Province | Heritage Impact Assessment Specialist Reports | 06/03/2020 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 02/04/2020 - 09:01 |
Clairwood Heritage Impact Assessment | Phase II Heritage Impact Assessment for the properties constituting Clairwood Turf Club on portions of the farms Dunns Grant 859 and Umlaas 873, southern Durban Region | Heritage Impact Assessment Specialist Reports | 01/10/2012 | Deborah Whelan | Archaic Consulting | Kerry Seppings Environmental Management | 13/12/2013 - 08:23 |
HIA Alternatives site for relocation of Devon Landfill Site | HIA for three Alternative sites for the Relocation of the Devon Landfill Site | Heritage Impact Assessment Specialist Reports | 28/02/2013 | Stephan Gaigher | Lesedi Local Municipality | 18/09/2013 - 07:40 | |
Uitkoms DBAR Heritage Report | Cultural Heritage Impact Assessment Of The Proposed Uitkoms Antra, Coal-Link Project, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 21/02/2014 | Frans Prins | Active Heritage CC | Sivest - Gauteng | 14/04/2015 - 13:54 |
HIA Klipdam | HIA Klipdam | Heritage Impact Assessment Specialist Reports | 23/08/2013 | Andrew B Smith | FOOTPRINT Environmental Services | FOOTPRINT Environmental Services | 27/08/2013 - 08:32 |
New Lighthouse on ERF 335 | HERITAGE SPECIALIST REPORT CONDUCTED AS PART OF A BASIC ASSESSMENT FOR A PROPOSED NEW LIGHTHOUSE ON ERF 335, BEACH STREET, PORT NOLLOTH. | Heritage Impact Assessment Specialist Reports | 01/02/2013 | Timothy Hart | ACO Associates CC | Council for Scientific and Industrial Research | 20/02/2013 - 16:52 |