THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 251 - 300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage Impact Assessment - Sol Invictus 3 | Heritage Impact Assessment for the Proposed Sol Invictus 3 PV Facility, Namakwaland Magisterial District, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/04/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 22/04/2016 - 14:56 |
Heritage Impact Assessment for the proposed Clearing of Indigenous Vegetation for the Construction of an Off-Stream Storage Dam and Related Infrastructure on the Farm: Klein Pos 420 MR within Blouberg Local Municipality, Capricorn District, Limpopo Provin | Heritage Impact Assessment for the proposed Clearing of Indigenous Vegetation for the Construction of an Off-Stream Storage Dam and Related Infrastructure on the Farm: Klein Pos 420 MR within Blouberg Local Municipality, Capricorn District, Limpopo Province | HIA Phase 1 | 07/09/2023 | Jaco van der Walt | Beyond Heritage | Tua Conserva Environmental | 15/09/2023 - 16:05 |
40727 Nalisview Cemetery (3) | Phase 1 Heritage Impact Assessment: proposed extension of a new cemetery site on the farm Nalisview 1060, Bloemfontein, Free State Province. | HIA Phase 1 | 07/05/2020 | 11/08/2021 - 13:36 | |||
HIA_Greater Seville 2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BULK SITES DEMARCATION OF ERVEN IN SEVILLE (EXTENSION 2), MPUMALANGA PROVINCE | HIA Phase 1 | Jaco van der Walt | 07/02/2023 - 17:02 | |||
Archaeological Impact Assessment Report - Ilanga CSP 9 (Jun2016) | Ilanga CSP9 and Associated Infrastructure Within Karoshoek Solar Valley Development Near Upington, Northern Cape Province | Archaeological Specialist Reports | 14/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 08/07/2016 - 10:44 |
PIA Karino Interchange, Mbombela, Mpumalanga | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DEVELOPMENT OF THE KARINO INTERCHANGE, LOCATED EAST OF MBOMBELA, MBOMBELA LOCAL MUNICIPALITY, EHLANZENI DISTRICT MUNCIPALITY, MPUMALANGA PROVINCE | PIA Desktop | 14/10/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 18/10/2017 - 13:27 |
AIA_City_Deep_Slimes_Nel_J_Dec10 | Heritage Scoping Survey for the amendment of the existing City Deep EMP for the reclamation of Slimes Dam 3/L/42 and 3/L/40 | AIA Desktop | 01/12/2010 | Johan Nel | Digby Wells Environmental | 16/06/2012 - 14:44 | |
Heritage Report for Sannaspos Solar Facilities - 360 | A Phase 1 Heritage impact assessment study for the proposed photovoltaic (PV) solar energy facilities (in Sannaspos), near Bloemfontein, Free State Province: DEA Ref No: 14/12/16/3/3/2/360 (Phase 1); DEA Ref No: 14/12/16/3/3/1/615 (Phase 2) | HIA Phase 1 | 07/07/2013 | Nkosinathi Godfrey Tomose | Savannah Environmental (Pty) Ltd | Zone Land Solutions | 11/03/2013 - 13:28 |
APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT | APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF STORM WATER AND ENVIRONMENTAL SYSTEMS IN THE PORT OF SALDANHA WITHIN SALDANHA BAY LOCAL MUNICIPALITY IN THE WESTERN CAPE PROVINCE. | Archaeological Monitoring | Nsovo Environmental Consulting | Vhubvo Archaeo-Heritage Consultants | 08/02/2019 - 11:22 | ||
Heritage Screener: Sannaspos PV Expansion | Desktop Heritage Screening Assessment for the Additional development area for the authorised Engie Sannaspos PV Facility is the Mangaung Metropolitan Municipality, Free State Province | HIA Letter of Exemption | 23/11/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 01/02/2022 - 12:01 |
HIA Borrow Pit 2 Griekwastad | First Phase Archaeological and Heritage Assessment of the Borrow Pit Development, Griekwastad, Northern Cape | HIA Phase 1 | 11/11/2012 | Cobus Dreyer | MDA Town and Regional Planners | 31/05/2013 - 09:23 | |
Jagersfontein Palaeontological Heritage Study | Desktop Palaeontological Heritage Study: Application for Environmental Authorisation for a prospecting right on the Remaining Extent, Portion 1 and Portion 16 of the farm Jagersfontein 14, Fauresmith District, Free State | PIA Desktop | 07/05/2019 | John E. Almond | Natura Viva CC | Natura Viva CC | 07/05/2019 - 13:56 |
PROPOSED WOLWERIVIER BULK SEWER PIPELINE ROUTE FROM CAPE FARM 101/5 TO SANDOWN ROAD, CAPE TOWN WESTERN CAPE | HIA: PROPOSED WOLWERIVIER BULK SEWER PIPELINE ROUTE FROM CAPE FARM 101/5 TO SANDOWN ROAD, CAPE TOWN ,WESTERN CAPE | HIA Phase 1 | 01/10/2019 | Jenna Lavin | CTS Heritage | 30/09/2020 - 16:41 | |
Cultural HIA for the Matsheketsheni 20MVA 132/88kV Substation | Cultural Heritage Impact Assessment of the Matsheketsheni 20MVA 132/88kV substation and associated powerlines | AIA Phase 1 | 17/03/2014 | Frans Prins | Active Heritage CC | Interdesign Landscape Architects | 12/04/2022 - 11:32 |
AIA_Aroams_57_Rd_PV_2630_Higgit_N_Feb12 | Notifiction of intent to develop: Proposed Aggeneys Photo-voltaic solar power plant on Portion 1 of the Farm Aroams 57 Rd, Northern Cape (DEA ref: 12/12/20/2630) | AIA Desktop | 26/02/2012 | Natasha Higgitt, Johan Nel | Digby Wells Environmental | 16/06/2012 - 14:43 | |
VGG Kathu Pan | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE VAAL-GAMAGARA WATER PIPELINE PROJECT, NORTHERN CAPE: REVISIT TO THE KATHU PAN ARCHAEOLOGICAL SITE | AIA Phase 1 | 31/12/2013 | Cobus Dreyer | 07/08/2014 - 09:55 | ||
PermitID2804 | Tracing human population history through ancient DNA: Pretoria bone collection | Archaeological Permit Report | 23/11/2020 | Maryna Steyn | University of the Witwatersrand - School of Anatomical Sciences | University of the Witwatersrand - School of Anatomical Sciences | 23/11/2020 - 12:42 |
Taylor's Halt HIA | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR PROPOSED 132 KV TAYLORS HALT POWERLINE AND SUBSTATION IN MSUNDUZI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT KWAZULU NATAL PROVINCE | AIA Phase 1 | 10/12/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Setala Environmental | 05/04/2023 - 20:31 |
DHF Comment | 23/05/2023 - 07:34 | ||||||
BMM Swartberg Decline HIA | Phase 1 Heritage Impact Assessment for the proposed construction of a 800m section of gravel road and associated infrastructure at the Black Mountain Decline on the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. | HIA Phase 1 | 18/01/2017 | Lloyd Rossouw | Black Mountain Mining (PTY) LTD | EndemicVision Environmental Services | 01/02/2017 - 13:55 |
Vulindlela Pipelines | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE AMENDED PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. | HIA Phase 1 | 01/09/2017 | Frans Prins | Kerry Seppings Environmental Management | Active Heritage CC | 09/01/2018 - 09:32 |
Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Dikgale Filling Station in Polokwane Local Municipality Area of Limpopo Province | Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Dikgale Filling Station in Polokwane Local Municipality Area of Limpopo Province | AIA Phase 1 | 12/01/2005 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 14:33 | |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:09 |
Eskom power line Heritage Report | A Report on cultural heritage impact assessment for the proposed relocation of 3 x 400kV power lines at the Landau 3 Colliery, close to eMalahleni, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 15/05/2017 | Anton van Vollenhoven | Archaetnos CC | SRK Consulting (Pty) Ltd - Johannesburg | 06/04/2018 - 09:06 |
Mjanyana Hospital Impact Assesment | Mjanyana Hospital Impact Assesment | Heritage Impact Assessment Specialist Reports | 29/07/2013 | Deborah Whelan | Archaic Consulting | GIBB Engineering & Science - Port Elizabeth | 01/08/2013 - 16:56 |
Umsobomvu Heritage Scoping Report | PROPOSED UMSOBOMVU SOLAR PV ENERGY FACILITIES Heritage Scoping Report | Heritage Scoping | 24/07/2019 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 30/07/2019 - 11:27 |
Eskom Gilead Heritage Report | Heritage Impact Assessment for the Proposed upgrade of infrastructure at Gilead Substation located within Mogalakwena Local Municipality, in the Limpopo Province | HIA Phase 1 | 12/06/2022 | Roy Muroyi | 14/06/2022 - 10:58 | ||
Heritage Statement regarding Josiah Gumede Trees | IRPTN C3: HISTORICAL SIGNIFIGANCE OF TREES FOUND ON THE CENTRE ISLAND ALONG JOSIAH GUMEDE ROAD | Heritage Statement | 01/08/2013 | Michelle Evans | Sivest - PMB | Ethekwini Metropolitan Municipality - Transport Authority | 10/10/2013 - 15:42 |
HIA - Water Scheme - Wards 5 and 7 Matatiele | Heritage Impact Assessment for the proposed Establishment of a New Water Supply Scheme for Wards 5 and 7 of the Matatiele Local Municipality, Alfred Nzo District Municipality in the Eastern Cape Province. | HIA Phase 1 | 06/11/2014 | Marko Hutten, Wouter Fourie | PGS Heritage and Grave Relocation Consultants | IQhawe Consulting Engineers (Pty) Ltd | 10/11/2014 - 10:44 |
HIA FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE | HIA Phase 1 | 01/03/2013 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 19/02/2021 - 12:02 | |
Voel Nessie A North West Province | Voel Nessie A North West Province | HIA Phase 1 | 01/06/2022 | Jaco van der Walt | Beyond Heritage | SRK Consulting (Pty) Ltd - Johannesburg | 08/08/2022 - 17:01 |
PIA, Ptn 52 of Rondebosch 403 JS, Middelburg | Palaeontological Desktop Impact Assessment, Protocol for Finds. Report for a Proposed Residential Development. Portion 52 Rondebosch 403 JS, Mpumalanga Province. | PIA Desktop | 03/02/2015 | Dr. Heidi Fourie | Dr Heidi Fourie | Clean Stream Environmental Services | 16/11/2015 - 10:46 |
Phase 1 HIA Rooywal 239 JT, Mpumalanga | Phase 1 Archaeological and Heritage Impact Assessment on the farm Rooywal 239 JT in respect of the proposed construction of a dam and establishment of orchards, Mpumalanga Province. | HIA Phase 1 | 07/01/2021 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 01/04/2021 - 12:22 |
(NOOITVERWAGT PORTION OF) KAFIR KRANTS 379 PHASE 1 ARCHAELOGICAL IMPACT ASSESSMENTM | Phase 1 Archaeological Impact Assessment - (NOOITVERWAGT PORTION OF) KAFIR KRANTS 379, HAY DISTRICT, NORTHERN CAPE, SOUTH AFRICA | AIA Phase 1 | 14/08/2006 | Karen Van Ryneveld | National Museum Bloemfontein | Pieter Jacobus Smit | 30/06/2023 - 16:23 |
HERITAGE STUDY: IMPACT LEVEL REPORT | PROJECT NAME: PROPOSED TETRA4 CLUSTER 1 GAS PRODUCTION PROJECT | HIA Phase 1 | 10/03/2017 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Environmental Impact Management Services (Pty) Ltd | 28/03/2017 - 14:12 |
PIA_Genoegsaam_solar_Botha-Brink_J_Mar12 | PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED GENOEGSAAM SOLAR FARM, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE | PIA Phase 1 | 05/03/2012 | Jennifer Botha | National Museum Bloemfontein - Karoo Palaeontology Department | 16/06/2012 - 14:54 | |
HIA; Proposed Groene Kloof Wind Energy Facility and PTL, Mamre | HERITAGE IMPACT ASSESSMENT PROPOSED GROENE KLOOF WIND ENERGY GENERATION FACILITY AND POWER TRANSMISSION LINE(S) NEAR MAMRE, WESTERN CAPE PROVINCE | HIA Phase 1 | 01/10/2012 | Anne-Marie Fick | MR Consultants | Withers Environmental Consultants | 29/05/2018 - 09:30 |
N10 section 4 Palaeontology | Palaeontological impact assessment for Proposed upgrade of the N10 section 4, immediately north of Cradock | PIA Phase 1 | 01/06/2012 | Robert Gess | Rob Gess Consulting | SRK Consulting (Pty) Ltd - Pretoria | 16/07/2012 - 16:28 |
Desktop PIA Klerksdorp Extension 48 | Desktop Palaeontological Impact Assessment Extension 48 Township Establishment at Klerksdorp, Northwest Province | PIA Desktop | 14/07/2018 | Bruce Rubidge | Evolutionary Studies Institute | Maxim Planning Solutions | 17/07/2018 - 18:00 |
SAS5202 - Chance Finds Protocol | Implementation of the Leeuspruit Risk Mitigation Measures Monitoring Plan: Chance Finds Protocol | Non Impact Assessment Related Reports | 28/10/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 28/10/2019 - 11:48 |
Nxaxo Reticulation Project | Proposed Development of Amathole District Municipality Water Supply Scheme in the Nxaxo and Cebe area Eastern Cape Province | Heritage Impact Assessment Specialist Reports | 27/07/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Terreco Environmental | 06/12/2013 - 09:11 |
Welgedacht Filling Station - HIA | Welgedacht Filling Station - HIA | 18/02/2020 - 09:51 | |||||
HIA TSAKANE ROAD INFRASTRUCTURE IMPROVEMENT, EKURHULENI METRO MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 29/11/2019 | Edward Matenga | AHSA | 27/09/2022 - 10:47 | ||
AIA - Iziduli SS & PL | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENTS OF THE PROPOSED SUBSTATION, SWITCHING STATION AND POWER LINE GRID CONNECTION FOR THE IZIDULI EMOYENI WIND FARM, BLUE CRANE ROUTE LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT, EASTERN CAPE PROVINCE. | AIA Phase 1 | 31/07/2014 | Johan Binneman | Eastern Cape Heritage Consultants | Savannah Environmental (Pty) Ltd | 25/02/2015 - 15:13 |
Heritage Screener CTS15_015a EOH Rietkloof Wind Energy Facility | Heritage Screener CTS15_015a EOH Rietkloof Wind Energy Facility | 01/02/2016 | Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire | CTS Heritage | EOH Coastal & Environmental Services (CES) - Cape Town | 08/02/2016 - 17:12 | |
Heritage Crime – Police Minister Bheki Cele – Publication of the (Draft) Firearms Control Amendment Bill (21 May 2021) | Heritage Crime – Police Minister Bheki Cele – Publication of the (Draft) Firearms Control Amendment Bill (21 May 2021) | Non Impact Assessment Related Reports | 07/06/2021 | Karen Van Ryneveld | 07/06/2021 - 00:27 | ||
Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF | Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF | Palaeontological Specialist Reports | 15/11/2022 | Elize Butler | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 15/11/2022 - 12:38 |
Hotazel Solar Farm & Transmission lines (Paleontology exemption rec.) | PROPOSED HOTAZEL SOLAR PARK ON THE FARM HOTAZEL ANNEX LANGDON (F278/0), JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 27/10/2016 | John E Almond | Natura Viva CC | Aurecon South Africa (Pty) Ltd | 08/05/2017 - 13:33 |
IXI3002_HIA | Heritage Impact Assessment Report: Environmental Authorisation for the Proposed Imvula Coal Mine | Heritage Impact Assessment Specialist Reports | 29/02/2016 | Justin du Piesanie, Johan Nel | Digby Wells Environmental | Ixia Coal (Pty) Ltd | 30/03/2016 - 09:32 |
2nd HIA Transnet Glosam Siding for PMG's Bishop Mine | A 2ND REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE UPGRADE OF TRANSNET’S GLOSAM SIDING FOR PMG’S BISHOP MINE (LOADING BAY) ON PORTION 2 AND THE REMAINDER OF GLOUCESTER 674 NEAR POSTMASBURG, TSANTSABANE LOCAL MUNICIPALITY, NORTHERN CAPE | HIA Phase 1 | 06/06/2012 | Anton Pelser | Kai Batla Holdings (Pty) Ltd | 06/06/2012 - 08:29 |