FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Heritage Impact Assessment - Sol Invictus 3 Heritage Impact Assessment for the Proposed Sol Invictus 3 PV Facility, Namakwaland Magisterial District, Northern Cape Province Heritage Impact Assessment Specialist Reports 08/04/2016 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 22/04/2016 - 14:56
Heritage Impact Assessment for the proposed Clearing of Indigenous Vegetation for the Construction of an Off-Stream Storage Dam and Related Infrastructure on the Farm: Klein Pos 420 MR within Blouberg Local Municipality, Capricorn District, Limpopo Provin Heritage Impact Assessment for the proposed Clearing of Indigenous Vegetation for the Construction of an Off-Stream Storage Dam and Related Infrastructure on the Farm: Klein Pos 420 MR within Blouberg Local Municipality, Capricorn District, Limpopo Province HIA Phase 1 07/09/2023 Jaco van der Walt Beyond Heritage Tua Conserva Environmental 15/09/2023 - 16:05
40727 Nalisview Cemetery (3) Phase 1 Heritage Impact Assessment: proposed extension of a new cemetery site on the farm Nalisview 1060, Bloemfontein, Free State Province. HIA Phase 1 07/05/2020 11/08/2021 - 13:36
HIA_Greater Seville 2 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BULK SITES DEMARCATION OF ERVEN IN SEVILLE (EXTENSION 2), MPUMALANGA PROVINCE HIA Phase 1 Jaco van der Walt 07/02/2023 - 17:02
Archaeological Impact Assessment Report - Ilanga CSP 9 (Jun2016) Ilanga CSP9 and Associated Infrastructure Within Karoshoek Solar Valley Development Near Upington, Northern Cape Province Archaeological Specialist Reports 14/06/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 08/07/2016 - 10:44
PIA Karino Interchange, Mbombela, Mpumalanga PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DEVELOPMENT OF THE KARINO INTERCHANGE, LOCATED EAST OF MBOMBELA, MBOMBELA LOCAL MUNICIPALITY, EHLANZENI DISTRICT MUNCIPALITY, MPUMALANGA PROVINCE PIA Desktop 14/10/2017 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 18/10/2017 - 13:27
AIA_City_Deep_Slimes_Nel_J_Dec10 Heritage Scoping Survey for the amendment of the existing City Deep EMP for the reclamation of Slimes Dam 3/L/42 and 3/L/40 AIA Desktop 01/12/2010 Johan Nel Digby Wells Environmental 16/06/2012 - 14:44
Heritage Report for Sannaspos Solar Facilities - 360 A Phase 1 Heritage impact assessment study for the proposed photovoltaic (PV) solar energy facilities (in Sannaspos), near Bloemfontein, Free State Province: DEA Ref No: 14/12/16/3/3/2/360 (Phase 1); DEA Ref No: 14/12/16/3/3/1/615 (Phase 2) HIA Phase 1 07/07/2013 Nkosinathi Godfrey Tomose Savannah Environmental (Pty) Ltd Zone Land Solutions 11/03/2013 - 13:28
APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF STORM WATER AND ENVIRONMENTAL SYSTEMS IN THE PORT OF SALDANHA WITHIN SALDANHA BAY LOCAL MUNICIPALITY IN THE WESTERN CAPE PROVINCE. Archaeological Monitoring Nsovo Environmental Consulting Vhubvo Archaeo-Heritage Consultants 08/02/2019 - 11:22
Heritage Screener: Sannaspos PV Expansion Desktop Heritage Screening Assessment for the Additional development area for the authorised Engie Sannaspos PV Facility is the Mangaung Metropolitan Municipality, Free State Province HIA Letter of Exemption 23/11/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 01/02/2022 - 12:01
HIA Borrow Pit 2 Griekwastad First Phase Archaeological and Heritage Assessment of the Borrow Pit Development, Griekwastad, Northern Cape HIA Phase 1 11/11/2012 Cobus Dreyer MDA Town and Regional Planners 31/05/2013 - 09:23
Jagersfontein Palaeontological Heritage Study Desktop Palaeontological Heritage Study: Application for Environmental Authorisation for a prospecting right on the Remaining Extent, Portion 1 and Portion 16 of the farm Jagersfontein 14, Fauresmith District, Free State PIA Desktop 07/05/2019 John E. Almond Natura Viva CC Natura Viva CC 07/05/2019 - 13:56
PROPOSED WOLWERIVIER BULK SEWER PIPELINE ROUTE FROM CAPE FARM 101/5 TO SANDOWN ROAD, CAPE TOWN WESTERN CAPE HIA: PROPOSED WOLWERIVIER BULK SEWER PIPELINE ROUTE FROM CAPE FARM 101/5 TO SANDOWN ROAD, CAPE TOWN ,WESTERN CAPE HIA Phase 1 01/10/2019 Jenna Lavin CTS Heritage 30/09/2020 - 16:41
Cultural HIA for the Matsheketsheni 20MVA 132/88kV Substation Cultural Heritage Impact Assessment of the Matsheketsheni 20MVA 132/88kV substation and associated powerlines AIA Phase 1 17/03/2014 Frans Prins Active Heritage CC Interdesign Landscape Architects 12/04/2022 - 11:32
AIA_Aroams_57_Rd_PV_2630_Higgit_N_Feb12 Notifiction of intent to develop: Proposed Aggeneys Photo-voltaic solar power plant on Portion 1 of the Farm Aroams 57 Rd, Northern Cape (DEA ref: 12/12/20/2630) AIA Desktop 26/02/2012 Natasha Higgitt, Johan Nel Digby Wells Environmental 16/06/2012 - 14:43
VGG Kathu Pan FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE VAAL-GAMAGARA WATER PIPELINE PROJECT, NORTHERN CAPE: REVISIT TO THE KATHU PAN ARCHAEOLOGICAL SITE AIA Phase 1 31/12/2013 Cobus Dreyer 07/08/2014 - 09:55
PermitID2804 Tracing human population history through ancient DNA: Pretoria bone collection Archaeological Permit Report 23/11/2020 Maryna Steyn University of the Witwatersrand - School of Anatomical Sciences University of the Witwatersrand - School of Anatomical Sciences 23/11/2020 - 12:42
Taylor's Halt HIA PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR PROPOSED 132 KV TAYLORS HALT POWERLINE AND SUBSTATION IN MSUNDUZI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT KWAZULU NATAL PROVINCE AIA Phase 1 10/12/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Setala Environmental 05/04/2023 - 20:31
DHF Comment 23/05/2023 - 07:34
BMM Swartberg Decline HIA Phase 1 Heritage Impact Assessment for the proposed construction of a 800m section of gravel road and associated infrastructure at the Black Mountain Decline on the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. HIA Phase 1 18/01/2017 Lloyd Rossouw Black Mountain Mining (PTY) LTD EndemicVision Environmental Services 01/02/2017 - 13:55
Vulindlela Pipelines CULTURAL HERITAGE IMPACT ASSESSMENT OF THE AMENDED PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. HIA Phase 1 01/09/2017 Frans Prins Kerry Seppings Environmental Management Active Heritage CC 09/01/2018 - 09:32
Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Dikgale Filling Station in Polokwane Local Municipality Area of Limpopo Province Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Dikgale Filling Station in Polokwane Local Municipality Area of Limpopo Province AIA Phase 1 12/01/2005 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:33
Umqeku river bridge HIA desktop DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: HIA Letter of Exemption 22/09/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Jeffares & Green - Pietermaritzburg 27/10/2016 - 15:09
Eskom power line Heritage Report A Report on cultural heritage impact assessment for the proposed relocation of 3 x 400kV power lines at the Landau 3 Colliery, close to eMalahleni, Mpumalanga Province Heritage Impact Assessment Specialist Reports 15/05/2017 Anton van Vollenhoven Archaetnos CC SRK Consulting (Pty) Ltd - Johannesburg 06/04/2018 - 09:06
Mjanyana Hospital Impact Assesment Mjanyana Hospital Impact Assesment Heritage Impact Assessment Specialist Reports 29/07/2013 Deborah Whelan Archaic Consulting GIBB Engineering & Science - Port Elizabeth 01/08/2013 - 16:56
Umsobomvu Heritage Scoping Report PROPOSED UMSOBOMVU SOLAR PV ENERGY FACILITIES Heritage Scoping Report Heritage Scoping 24/07/2019 Wouter Fourie PGS Heritage (Pty) Ltd Sivest - Gauteng 30/07/2019 - 11:27
Eskom Gilead Heritage Report Heritage Impact Assessment for the Proposed upgrade of infrastructure at Gilead Substation located within Mogalakwena Local Municipality, in the Limpopo Province HIA Phase 1 12/06/2022 Roy Muroyi 14/06/2022 - 10:58
Heritage Statement regarding Josiah Gumede Trees IRPTN C3: HISTORICAL SIGNIFIGANCE OF TREES FOUND ON THE CENTRE ISLAND ALONG JOSIAH GUMEDE ROAD Heritage Statement 01/08/2013 Michelle Evans Sivest - PMB Ethekwini Metropolitan Municipality - Transport Authority 10/10/2013 - 15:42
HIA - Water Scheme - Wards 5 and 7 Matatiele Heritage Impact Assessment for the proposed Establishment of a New Water Supply Scheme for Wards 5 and 7 of the Matatiele Local Municipality, Alfred Nzo District Municipality in the Eastern Cape Province. HIA Phase 1 06/11/2014 Marko Hutten, Wouter Fourie PGS Heritage and Grave Relocation Consultants IQhawe Consulting Engineers (Pty) Ltd 10/11/2014 - 10:44
HIA FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE HIA Phase 1 01/03/2013 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants 19/02/2021 - 12:02
Voel Nessie A North West Province Voel Nessie A North West Province HIA Phase 1 01/06/2022 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 08/08/2022 - 17:01
PIA, Ptn 52 of Rondebosch 403 JS, Middelburg Palaeontological Desktop Impact Assessment, Protocol for Finds. Report for a Proposed Residential Development. Portion 52 Rondebosch 403 JS, Mpumalanga Province. PIA Desktop 03/02/2015 Dr. Heidi Fourie Dr Heidi Fourie Clean Stream Environmental Services 16/11/2015 - 10:46
Phase 1 HIA Rooywal 239 JT, Mpumalanga Phase 1 Archaeological and Heritage Impact Assessment on the farm Rooywal 239 JT in respect of the proposed construction of a dam and establishment of orchards, Mpumalanga Province. HIA Phase 1 07/01/2021 Jean-Pierre Celliers Kudzala Antiquity Henwood Environmental Services 01/04/2021 - 12:22
(NOOITVERWAGT PORTION OF) KAFIR KRANTS 379 PHASE 1 ARCHAELOGICAL IMPACT ASSESSMENTM Phase 1 Archaeological Impact Assessment - (NOOITVERWAGT PORTION OF) KAFIR KRANTS 379, HAY DISTRICT, NORTHERN CAPE, SOUTH AFRICA AIA Phase 1 14/08/2006 Karen Van Ryneveld National Museum Bloemfontein Pieter Jacobus Smit 30/06/2023 - 16:23
HERITAGE STUDY: IMPACT LEVEL REPORT PROJECT NAME: PROPOSED TETRA4 CLUSTER 1 GAS PRODUCTION PROJECT HIA Phase 1 10/03/2017 Polke Birkholtz PGS Heritage and Grave Relocation Consultants Environmental Impact Management Services (Pty) Ltd 28/03/2017 - 14:12
PIA_Genoegsaam_solar_Botha-Brink_J_Mar12 PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED GENOEGSAAM SOLAR FARM, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE PIA Phase 1 05/03/2012 Jennifer Botha National Museum Bloemfontein - Karoo Palaeontology Department 16/06/2012 - 14:54
HIA; Proposed Groene Kloof Wind Energy Facility and PTL, Mamre HERITAGE IMPACT ASSESSMENT PROPOSED GROENE KLOOF WIND ENERGY GENERATION FACILITY AND POWER TRANSMISSION LINE(S) NEAR MAMRE, WESTERN CAPE PROVINCE HIA Phase 1 01/10/2012 Anne-Marie Fick MR Consultants Withers Environmental Consultants 29/05/2018 - 09:30
N10 section 4 Palaeontology Palaeontological impact assessment for Proposed upgrade of the N10 section 4, immediately north of Cradock PIA Phase 1 01/06/2012 Robert Gess Rob Gess Consulting SRK Consulting (Pty) Ltd - Pretoria 16/07/2012 - 16:28
Desktop PIA Klerksdorp Extension 48 Desktop Palaeontological Impact Assessment Extension 48 Township Establishment at Klerksdorp, Northwest Province PIA Desktop 14/07/2018 Bruce Rubidge Evolutionary Studies Institute Maxim Planning Solutions 17/07/2018 - 18:00
SAS5202 - Chance Finds Protocol Implementation of the Leeuspruit Risk Mitigation Measures Monitoring Plan: Chance Finds Protocol Non Impact Assessment Related Reports 28/10/2019 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Sasol Mining (Pty) Ltd 28/10/2019 - 11:48
Nxaxo Reticulation Project Proposed Development of Amathole District Municipality Water Supply Scheme in the Nxaxo and Cebe area Eastern Cape Province Heritage Impact Assessment Specialist Reports 27/07/2013 Wouter Fourie PGS Heritage and Grave Relocation Consultants Terreco Environmental 06/12/2013 - 09:11
Welgedacht Filling Station - HIA Welgedacht Filling Station - HIA 18/02/2020 - 09:51
HIA TSAKANE ROAD INFRASTRUCTURE IMPROVEMENT, EKURHULENI METRO MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 29/11/2019 Edward Matenga AHSA 27/09/2022 - 10:47
AIA - Iziduli SS & PL A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENTS OF THE PROPOSED SUBSTATION, SWITCHING STATION AND POWER LINE GRID CONNECTION FOR THE IZIDULI EMOYENI WIND FARM, BLUE CRANE ROUTE LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT, EASTERN CAPE PROVINCE. AIA Phase 1 31/07/2014 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 25/02/2015 - 15:13
Heritage Screener CTS15_015a EOH Rietkloof Wind Energy Facility Heritage Screener CTS15_015a EOH Rietkloof Wind Energy Facility 01/02/2016 Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire CTS Heritage EOH Coastal & Environmental Services (CES) - Cape Town 08/02/2016 - 17:12
Heritage Crime – Police Minister Bheki Cele – Publication of the (Draft) Firearms Control Amendment Bill (21 May 2021) Heritage Crime – Police Minister Bheki Cele – Publication of the (Draft) Firearms Control Amendment Bill (21 May 2021) Non Impact Assessment Related Reports 07/06/2021 Karen Van Ryneveld 07/06/2021 - 00:27
Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF Palaeontological Specialist Reports 15/11/2022 Elize Butler PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 15/11/2022 - 12:38
Hotazel Solar Farm & Transmission lines (Paleontology exemption rec.) PROPOSED HOTAZEL SOLAR PARK ON THE FARM HOTAZEL ANNEX LANGDON (F278/0), JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PIA Desktop 27/10/2016 John E Almond Natura Viva CC Aurecon South Africa (Pty) Ltd 08/05/2017 - 13:33
IXI3002_HIA Heritage Impact Assessment Report: Environmental Authorisation for the Proposed Imvula Coal Mine Heritage Impact Assessment Specialist Reports 29/02/2016 Justin du Piesanie, Johan Nel Digby Wells Environmental Ixia Coal (Pty) Ltd 30/03/2016 - 09:32
2nd HIA Transnet Glosam Siding for PMG's Bishop Mine A 2ND REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE UPGRADE OF TRANSNET’S GLOSAM SIDING FOR PMG’S BISHOP MINE (LOADING BAY) ON PORTION 2 AND THE REMAINDER OF GLOUCESTER 674 NEAR POSTMASBURG, TSANTSABANE LOCAL MUNICIPALITY, NORTHERN CAPE HIA Phase 1 06/06/2012 Anton Pelser Kai Batla Holdings (Pty) Ltd 06/06/2012 - 08:29