THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 301 - 350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Phagamen walk down hia | A REPORT ON A WALK DOWN HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PHAGAMENG 11KV LINE, LIMPOPO PROVINCE | HIA Phase 1 | 04/11/2016 | Anton van Vollenhoven | Archaetnos CC | LIM368 | 08/11/2016 - 05:33 |
Permit_Mapungubwe_ceramics_Tiley_S_Nov06 | Mapungubwe Museum Report, Mapungubwe Permit Report: Restoration of Low Fired Ceramics from Mapungubwe and K2 Collections, University of Pretoria | Archaeological Permit Report | 07/11/2006 | S Tiley | University of Pretoria | 16/06/2012 - 14:53 | |
Palmietfontein_Ventersdorp_AIA_Revised+desktop | Palmietfontein_Ventersdorp_AIA_Revised+desktop | Archaeological Specialist Reports | 22/02/2020 | Tobias Coetzee | 28/02/2020 - 11:05 | ||
PIA Sasol Irenedale Water Pipeline Project | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED SASOL IRENEDALE WATER PIPELINE PROJECT IN THE LEKWA LOCAL MUNICIPALITY AND THE GOVAN MBEKI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, | Palaeontological Specialist Reports | 25/11/2020 | Elize Butler | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 15/04/2021 - 13:54 |
Weenen Survey Report | Survey and condition assessment of archaeological sites in Weenen Nature Reserve and investigation into the possibility of opening a low-impact archaeological tourism destination | Heritage Study | 28/06/2018 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 07/10/2022 - 15:00 |
Heritage Impact Assessment Groot Marico Extension 2 | A report on a Heritage Impact Assessment for the proposed Groot Marico Extension 2 Township Development on the Remaining Extent of Portion 127 and Portion 282 of the farm Wonderfontein No. 258-JP, near Groot Marico, Northwest | HIA Phase 1 | 14/06/2012 | Anton Pelser | Archaetnos CC | Maxim Planning Solutions | 15/10/2012 - 18:26 |
Letter re Kakamas Hydro | NEUS HYDRO: NEW SPOIL AREA | Heritage Statement | 25/06/2013 | Jayson Orton | ACO Associates CC | Aurecon - Head Office | 26/06/2013 - 08:49 |
PHASE 1 HIA REPORT OMDRAAI/AFDRAAI PLOT 337 & PLOT 396 KAKAMAS-NORTH NORTHERN CAPE | PROPOSED AGRICULTURAL DEVELOPMENTS ON PLOT 337 AND PLOT 396, KAKAMAS-NORTH, KAI !GARIB LOCAL MUNICIPALITY, Z.F. MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 15/05/2021 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Afdraai/Omdraai Landgoed Trust | 11/06/2021 - 14:54 |
AIA | AIA | AIA Phase 1 | 25/07/2018 - 19:14 | ||||
Adam Kok III Grave and Memorial | Adam Kok III Grave and Memorial | Heritage Scoping | 29/04/2013 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | 08/01/2015 - 12:35 | |
Heritage Motivation Kathu Optic Fibre Cable | Exemption of a Phase 1 Heritage Impact Assessment for a proposed new overhead and underground installation of a Vodacom optic fibre cable along provincial road and local reserves in the vicinity of Kathu, NC Province*. | HIA Letter of Exemption | 27/11/2015 | Lloyd Rossouw | Paleo Field Services | 30/11/2015 - 11:11 | |
HIA for Matai Mining Right Application | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT APPLICATION FOR VANADIUM, TITUNIUM AND IRON ORE ON PORTION (S) OF THE FARM (S) WILDEBEESTKUIL 7 JQ, AND PORTION OF FARM MAGAZYNSKRAAL 3 JQ, HAAKDOORN 6 JQ, SYFERKUIL 9 JQ AND MIDDELKUIL 8 JQ WITHIN MOSES KOTANE LOCAL MUNICIPALITY OF BOJANALA DISTRICT MUNICIPALITY IN THE NORTH WEST PROVINCE | HIA Phase 1 | 17/04/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 17/10/2018 - 16:07 |
New croplands on the re and portion 2 of the farm Maroelaknop 844 LS | Heritage scoping report for proposed new croplands on the remaining portion and portion 2 of the farm Maroelaknop 844 LS, near Polokwane, Limpopo Province | Heritage Scoping | 23/04/2021 | Liesl Stegmann | AGES (PTY) Ltd - Limpopo | 02/11/2021 - 09:49 | |
Ptn 58 Vaalbank HIA | A Report on a Heritage Impact Assessment for the Proposed Development of a Light Industrial Area on Portion 58 of the Farm Vaalbank 289 JS, Middelburg, Mpumalanga Province. | HIA Phase 1 | 05/03/2020 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 21/07/2020 - 12:28 |
Heritage Scoping Assessment | Additional development area for the authorised Engie Graspan PV Facility, in the Siyancuma Local Municipality in the Northern Cape Province | Heritage Scoping | CTS Heritage | 21/01/2022 - 03:47 | |||
Hendrina Green hydrogen and ammonia -Heritage impact assessment report | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) FOR THE PROPOSED HENDRINA GREEN HYDROGEN AND AMMONIA FACILITY, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 08/04/2022 | Jaco van der Walt | Beyond Heritage | 23/11/2022 - 10:31 | |
REVISED DESKTOP INDEPENDENT HIA REVIEW AND ADDENDUM - LESEDI POWER COMPANY [nid:618048] | REVISED DESKTOP INDEPENDENT HIA REVIEW AND ADDENDUM - LESEDI POWER COMPANY [nid:618048] | Anton Pelser | 08/09/2023 - 14:51 | ||||
Prestwich Precinct Revitalization Stage 1 HIA | PRESTWICH PRECINCT REVITALISATION ERVEN 738, 734, 564, 202, 566 GREEN POINT. | Burial Grounds and Graves Specialist Reports | 01/02/2011 | Timothy Hart | ACO Associates CC | Citythinkspace | 05/02/2013 - 11:46 |
HIA for Proposed Drilling at Farm 277 | Heritage Impact Assessment for proposed drilling site at Plaas 277, near Delportshope, Northern Cape | HIA Phase 1 | 01/08/2020 | David Morris | Archaeology department, McGreggor Museum | De Beers Consolidated Mines (Pty) Ltd | 23/09/2020 - 10:07 |
Heritage Walkdown Report & Supporting Letter | Heritage Walkdown Report & Supporting Letter | Heritage Study | 03/08/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 04/08/2021 - 14:02 |
River View Solar Plant Desktop HIA | DESKTOP STUDY FOR THE PROPOSED IKOMKHULU SOLAR PLANT ON FARM RIETPUTS 15 NEAR WINDSORTON, NORTHERN CAPE PROVINCE, SOUTH AFRICA. | AIA Desktop | 01/12/2022 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | 30/01/2023 - 15:30 | |
HIA Greater Efaye | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED GREATER EFAYE PIPELINE AND RESERVOIRS UMSHWATHI LOCAL MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 28/03/2017 | Frans Prins | Active Heritage CC | EnviroPro | 26/05/2017 - 10:39 |
Desktop Heritage Impact Assessment | Desktop Heritage Impact Assessment | Heritage Study | 17/10/2023 | Gert Watson | K2M Environmental | K2M Environmental | 25/10/2023 - 15:34 |
HIA: Majuba Coal Gasification | HERITAGE ASSESSMENT REPORT FOR THE UNDERGROUND COAL GASIFICATION PROJECT AND ASSOCIATED INFRASTRUCTURE IN SUPPORT OF CO-FIRING OF GAS AT THE MAJUBA POWER STATION, AMERSFOORT, MPUMALANGA | HIA Phase 1 | 01/12/2012 | Johnny Van Schalkwyk | Royal Haskoning DHV | 05/11/2013 - 15:26 | |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 02/10/2017 - 13:38 |
HIA for proposed Richtersveld Sunspot Solar Energy Power Plant | Heritage Impact Assessment for proposed Richtersveld Sunspot Solar Energy Power Plant, at Portion 10 (Arris) of Farm 2 Korridor Wes, Namakwaland, Northern Cape. | HIA Phase 1 | 02/02/2015 | Stephen Townsend | Richtersveld Sunspot (Pty) Ltd. | 17/03/2015 - 11:18 | |
HIA FOR THE MANTULI ROAD UPGRADE | HERITAGE SURVEY FOR THE MANTULI ROAD UPGRADE | Heritage Study | 05/12/2016 | Gavin Anderson | Afzelia Environmental Consultants Pty Ltd | 13/12/2017 - 12:32 | |
PIA Portion 93, Rondebosch 403 JS | Palaeontological Impact Assessment: Phase 1 Field Study: The Development of a Residential Area on a Portion of Portion 93 of the Farm Rondebosch 403 JS, Middelburg, Mpumalanga Province. | PIA Phase 1 | 14/01/2019 | Dr. Heidi Fourie | Dr Heidi Fourie | AdiEnvironmental cc | 28/01/2019 - 12:56 |
A PHASE I HERITAGE IMPACT ASSESSMENT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ANGLO OPERATIONS LIMITED GREENSIDE COLLIERY’S NEW DISCARD FACILITY NEAR EMAHLALENI ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 11/01/2015 | 08/06/2015 - 13:22 | |||
Heritage Assessment - Ilanga CSP Tower 1 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga Tower 1 Project, near Upington, NC Province | Heritage Impact Assessment Specialist Reports | 13/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 18:45 |
REVISED HIA - 23 April 2019 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE NORTHWEST GATEWAY PROJECT, ON THE FARM HARTEBEESTFONTEIN 445 JQ, NORTH-WEST PROVINCE | HIA Phase 1 | 23/04/2019 | Prof. Anton van Vollenhoven | 23/04/2019 - 13:22 | ||
Oakfield Development, Portion 240, 241 and 242 of the Farm Rietfontein 189, I.Q., Mogale Municipality | Heritage Impact Assessment for the Proposed Oakfield Development located on Portions 240, 241 and 242 of Farm Rietfontein 189 I.Q. Mogale Municipality, West Rand District Municipality | PIA Phase 1 | 01/04/2022 - 10:44 | ||||
Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/06/2016 | Marko Hutten | Tekplan Environmental | 11/07/2016 - 08:55 | |
HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) | PHASE 1 HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) ON THE REMAINING EXTENT OF THE FARM VETLAAGTE 4 WITHIN EMTHANJENI LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 15/10/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Sativa Travel and Environmental Consultants | 17/11/2020 - 00:10 |
APPLICATION FORM A for 90 27th Avenue, erf 659 Umhlatuzana | APPLICATION IN TERMS OF SECTION 37(1)(a) OF THE KWAZULU-NATAL AMAFA AND RESEARCH INSTITUTE ACT (5/2018,) FOR A PERMIT TO DEMOLISH, ALTER OR ADD TO A STRUCTURE WHICH IS, OR WHICH MAY REASONABLY BE EXPECTED TO BE OLDER THAN 60 YEARS | Built Environment and Cultural Landscapes | 18/05/2022 | Sumesh Govender | 05/06/2022 - 23:59 | ||
mining permit application on the farm vogelstruisnel 173JP | AIA Phase 1 | 29/03/2023 - 23:09 | |||||
PROPOSED NEW TRAIN REPEATER HIGH SITE WITHIN THE GREENPOINT LIGHTHOUSE SITE | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW TRAIN REPEATER HIGH SITE WITHIN THE GREENPOINT LIGHTHOUSE SITE IN PORT SHEPSTONE, KWAZULU NATAL PROVINCE. | HIA Phase 1 | 27/01/2014 | Makhosazana Mngomezulu | 27/01/2014 - 11:45 | ||
Palaeontological Impact Assessment for the proposed Renewable Energy Generation projects by Carina Energy (Pty) Ltd: | Palaeontological Impact Assessment for the proposed Renewable Energy Generation projects by Carina Energy (Pty) Ltd: Buffalo 1 Solar Park on the Farm Buffelsjagt 744-LQ with overhead powerlines to the ESKOM Medupi Substation, within the Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province | PIA Phase 2 | 11/04/2023 | Marion Bamford | Prof Marion Bamford | 19/05/2023 - 11:42 | |
Archaeological Impact Assessment, Bram Fischer Airport Boulevard Precint | A DESKTOP ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE BOULEVARD PRECINCT, BRAM FISCHER AIRPORT, BLOEMFONTEIN | AIA Desktop | 01/11/2013 | Dave Halkett | ACO Associates CC | Vidamemoria Heritage Consultants, Airports Company South Africa | 20/03/2014 - 13:50 |
A&PIA Phase 1 Map IDZ TSHIAME / INDUSTRIQUA, HARRISMITH, FREE STATE | FIRST PHASE ARCHAEOLOGICAL, PALAEONTOLOGICAL & GEOLOGICAL INVESTIGATION OF THE PROPOSED TOWNSHIP & LIGHT INDUSTRIAL & AGRO-PROCESSING DEVELOPMENTS AT TSHIAME / INDUSTRIQUA, HARRISMITH, FREE STATE | AIA Phase 1 | 01/01/2015 | Cobus Dreyer, Johan Loock | ENVIROMATRIX (Pty) Ltd | DESTEA-Free State | 22/03/2018 - 19:05 |
Heritage Impact Assessment - Draft EIA | Heritage Impact Assessment: Proposed hartebeest Wind Farm at Moorreesberg | Heritage Impact Assessment Specialist Reports | 30/11/2016 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 31/01/2017 - 14:59 |
Aquatic Assessment | Report on the aquatic assessment for the proposed alluvial diamond mining operations on a portion of the Remainder of the Farm Pniel 218 including a portion of the Vaal River near the town of Delportshoop, Northern Cape Province. | 16/08/2019 | J.C Potgieter | DPR Ecologists and Environmental Services | 16/07/2019 - 13:37 | ||
VIA_SIMONSBERGSILVERMINE_SILVERMINE | ZILVERMYN AT SIMONSBERG GROOT DRAKENSTEIN FIRST PHASE: GENERAL VISUAL ASSESSMENT OF THE SILVER MINE INDUSTRIAL COMPLEX | Visual Impact Assessment | 01/10/2004 | Hennie Vos | 13/09/2016 - 15:57 | ||
Construction of steel smelter | Proposed construction of steel smelter, Colenso, Alfred Duma Local Municipality, KwaZulu-Natal | HIA Phase 1 | 06/09/2019 | Jean Beater | JLB Consulting | Fuze Environmental Services | 13/10/2019 - 08:54 |
Ga-Molepo Mankgaile Petroleum Station HIA Report | HERITAGE IMPACT ASSESSMENT IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT (NO 25/1999) FOR PROPOSED ESTABLISHMENT OF A PETROLEUM FILLING STATION AND ASSOCIATED FACILITIES AT GA MOLEPO MANKGAILE, MASHALANG EXTENSION 1 ON A REMAINING PORTION OF THE FARM NOOITGEDACHT 189 KS WITHIN, POLOKWANE LOCAL MUNICIPALITY, CAPRICORN DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 10/10/2020 | Edward Matenga | AHSA | AHSA | 09/02/2021 - 13:34 |
Grading FE 9 | Boschendal (Pty) Ltd | 01/08/2022 - 07:20 | |||||
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:09 |
HIA Proposed Residential Developments Langa Cape Town | HIA Proposed Residential Developments Langa Cape Town Erven 311, 315, 2877 (Special Quarters), Erven 2988, 2989, 2990, 2991, 3004, 3005, 3006, 3007, 3008, 3009, 3011 (Civic Core sites), Erf 2731 (new Flats), Erven 3280, 3281 (Entry Sites), Erf 2574 (Zone 2) | HIA Phase 2 | 19/03/2013 | Bridget O'Donoghue | City of Cape Town Metropolitan Municipality, City of Cape Town - Environmental and Heritage Management | 19/03/2013 - 11:10 | |
Heritage Impact Assessment - Gautrain Rapid Rail Link Project | Heritage Impact Assessment of the recommended route alignment for the proposed Gautrain Rapid Rail Link Project: Supplementary volume 2 of the addendum to the draft environment impact assessment report for the proposed Gautrain rapid rail link between Johannesburg, Pretoria and Johannesburg International Airport: Appendices: Book 1, 2 & 3 | Heritage Impact Assessment Specialist Reports | 01/04/2003 | Johann Bruwer, Mauritz Naude, William Martinson | 25/03/2021 - 11:25 | ||
HIA Filling Station 312 Vaal-Harts Settlement B, Hartswater | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A FILLING STATION AND ASSOCIATED INFRASTRUCTURE ON A PORTION OF FARM 312, PAMPIERSTAD, SITUATED NORTH OF THE MR933 ROAD BETWEEN THE SETTLEMENTS OF PAMPIERSTAD AND HARTSWATER, NORTHERN CAPE PROVINCE | HIA Phase 1 | 25/05/2023 | Loudine Philip | Turn 180 Environmental Consultants | 27/06/2023 - 15:38 |