FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
ERG6028 - Project Status and Close-out Memo City Dump Burial Ground Mitigation Process - Proposed Way Forward and Proposed Project Close out Non Impact Assessment Related Reports 29/05/2023 Shannon Hardwick Digby Wells Environmental Ergo Mining (Pty) Ltd 29/05/2023 - 11:49
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED BEENLEEGTE EMBEDDED SMALL HYDRO PROJECT A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED BEENLEEGTE EMBEDDED SMALL HYDRO PROJECT IN THE BLUE CRANE ROUTE LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE AIA Phase 1 30/07/2016 Johan Binneman, Kobus Reichert Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit 08/02/2017 - 09:01
Desktop Palaeontological Impact Assessment report Palaeontological Desktop Assessment for the proposed Diamond Mining Right Application combined with a Waste Licence Application on the Remaining Extent, Portion 3, portion of Portion 9 and portion of Portion 10 of the farm Pienaarsfontein 113, North West Province PIA Desktop 06/04/2021 Elize Butler 08/04/2021 - 15:48
HIA: Notsi PV3 HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed Development of the Notsi PV 3 project as part of the Notsi Solar Projects near Dealesville, Free State Province HIA Phase 1 04/04/2023 Jenna Lavin CTS Heritage Environamics 04/07/2023 - 11:10
Dannhauser Subsidised Housing Project (Phase 1) Application for Exemption from a Phase 1 Heritage Impact Assessment for the Dannhauser Housing Project, Dannhauser Local Municipality, KwaZulu-Natal Heritage Scoping 30/05/2015 Len van Schalkwyk eThembeni Cultural Heritage 17/09/2015 - 16:00
Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities at the Anglo American Platinum’s Amandelbult Mine at Thabazimbi, Limpopo Province Heritage Impact Assessment Specialist Reports 26/05/2016 Stephan Gaigher, JF Durand, Lynette Herbst G&A Heritage Management Consultants Aurecon South Africa (Pty) Ltd 03/04/2017 - 09:13
Ogies Eskom 88kV Powerline Phase 1 Archaeological Impact and Heritage Assessment on portions of the farms Kleinzuikerboschplaat 5 IS, Klipfontein 3 IS and Zondagsvlei 9 IS, in respect of the proposed construction of a 88 kV Eskom Powerline, Ogies, Mpumalanga Province. AIA Phase 1 06/05/2015 Jean-Pierre Celliers Kudzala Antiquity Royal Haskoning DHV 20/11/2015 - 10:33
HIA; Expansion of an Existing Borrow Pit, Nelspoort Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along MR 587 near Nelspoort, Central Karoo District Municipality. 14/07/2015 Quahnita Samie, John Almond, Madelon Tusenius Vidamemoria Heritage Consultants, Natura Viva CC Aurecon South Africa (Pty) Ltd 30/05/2018 - 14:05
HIA FOR THE CONSTRUCTION OF A PEDESTRIAN PATHWAY AND CYCLE PATH IN THE MABOPANE AREA OF GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 20/09/2013 - 15:59
Draft Scoping Report Hans Hoheisen Veterinary Station Draft Scoping Report for the Hans Hoheisen Veterinary Station Heritage Scoping 15/01/2013 V&L Landscape Architects 04/03/2013 - 10:53
West Wits Mining Permit Application Creswell Park Heritage Impact Assessment - Mining Permit Application: West Wits Mining MLI (Pty) Ltd – Proposed Opencast Pit: Creswell Park, Roodepoort, Johannesburg Metropolitan Municipality, Gauteng Heritage Impact Assessment Specialist Reports 23/05/2018 Wouter Fourie PGS Heritage (Pty) Ltd PGS Heritage (Pty) Ltd 19/07/2018 - 09:52
Equiano Cable System Maritime HIA Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, landing at Melkbosstrand, Western Cape Province AIA Desktop 28/10/2019 John Gribble ACO Associates CC 01/11/2019 - 14:20
HIA_Volspruit_326_KR_Pelser_AJ_Sep11 A heritage impact assessment report for the proposed Sylvania resources Volspruit Mine on the farms Volspruit 326 KR and Zoetveld 294 KR, near Mokopane, Limpopo Province AIA Phase 1 01/09/2011 Anton Pelser Archaetnos CC 16/06/2012 - 14:51
Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Dikgale Filling Station in Polokwane Local Municipality Area of Limpopo Province Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Dikgale Filling Station in Polokwane Local Municipality Area of Limpopo Province AIA Phase 1 12/01/2005 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:33
Phase 1 Cultural Heritage Resources Impact Assessment Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the remainder of portion 3 of the farm Sjambok Zijn Oude Kraal 258 JR Ga-Rankuwa Tshwane Gauteng HIA Phase 1 22/04/2015 Udo Kusel African Heritage Consultants CC Aurecon - Head Office 17/06/2015 - 09:46
Government Avenue Government Avenue Cape Town Heritage Statement 13/07/2015 Quahnita Samie Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants 13/07/2015 - 10:34
UPDATED PALAEONTOLOGICAL ASSESSMENT WITH REVISED FOSSIL FINDS PROCEDURE FOR THE EMP. UPDATED PALAEONTOLOGICAL ASSESSMENT WITH REVISED FOSSIL FINDS PROCEDURE FOR THE EMP. PROPOSED PROSPECTING ON A PORTION OF PORTION 1 OF THE FARM VOORUITZIGT 81, SOL PLAATJE MUNICIPALITY, KIMBERLEY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE BYJohn Pether, M.Sc., Pr. Sci. Nat. (Earth Sci.) Geological and Palaeontological Consultant PIA Desktop 10/01/2018 Geological and Palaeontological Consultant Geological and Palaeontological Consultant 17/01/2018 - 15:15
Integrated Heritage Impact Assessment: AMDA Strausheim Bravo SEF, Kenhardt PROPOSED DEVELOPMENT OF THE AMDA BRAVO PV (SOLAR ENERGY FACILITY) ON PORTION 1 OF N'ROUGAS ZUID NO 121, STRAUSSHEIM AS WELL AS OVERHEAD POWER LINE GRID CONNECTION TO THE ESKOM NIEUWEHOOP MTS SUB-STATION ACROSS PORTION 3 OF GEMSBOK BULT NO120, KENHARDT DISTRICT, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 15/09/2016 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 15/09/2016 - 20:39
Estcourt HERITAGE SURVEY OF THE PROPOSED WATER RETICULATION SCHEME ESTCOURT, KZN Heritage Impact Assessment Specialist Reports 27/11/2017 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Terratest (Pty) Ltd 10/04/2018 - 08:45
Heritage Impact Assessment for Kophia Diamonds Blaauwboschfontein PGS Heritage Kophia Diamonds (Pty) Ltd. Catherine's Fancy 831, which forms part of the Blaauwbosch Mine, Boshof District, Free State Province. Heritage Impact Assessment HIA Phase 1 14/06/2019 Henk Steyn PGS Heritage (Pty) Ltd 14/05/2019 - 12:00
Falcon Ridge Farm, Archeology A Phase 1 Archaeological Impact Assessment for the proposed expansion of the existing agricultural activities on Falcon Ridge, Portion 274 of Strathomers estate no. 42, Sundays River Valley Municipality, Eastern Cape Province. AIA Phase 1 01/05/2012 Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 12/11/2012 - 16:21
Palaeontological Impact Assessment, Katlani 236 Palaeontological Impact Assessment for the proposed Prospecting and Mining rights Applications for Katlani 236, west of Douglas, Northern Cape Province PIA Desktop 31/07/2019 Marion Bamford Prof Marion Bamford Archaeological and Heritage Services Africa (Pty) Ltd 10/08/2019 - 18:32
SRPM PV Heritage Scoping Report (Draft) SRPM PV Heritage Scoping Report (Draft) Heritage Scoping Dr Julius CC Pistorius Savannah Environmental (Pty) Ltd 20/06/2022 - 14:51
Archaeological Impact Assessment PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED HENNOPS WEDDING AND CONFERENCE CENTRE ON PORTION 200 OF THE FARM HENNOPS RIVIER NO 489 JQ, HENNOPS RIVER, CITY OF TSHWANE, GAUTENG PROVINCE, SOUTH AFRICA Archaeological Specialist Reports 02/08/2019 Mathoho Ndivhuho Eric Millennium Heritage Group (PTY) LTD 24/02/2021 - 03:41
PALAEONTOLOGICAL DESKTOP STUDY The proposed development of a Battery Energy Storage System (BESS) and associated infrastructure at the Cuprum Substation located within Copperton, near the town of Prieska, Northern Cape Province PIA Desktop 16/05/2021 Jacobus Francios Durand Sativa Travel and Environmental Consultants 15/08/2022 - 09:19
HIA The Rest 454 JT, Mbombela, Mpumalanga Phase 1 Archaeological and Heritage Impact Assessment on a portion of Portion 22 and Portion 23 and 24 and portions of Portion 278 and 279 of The Rest 454 JT in respect of proposed township establishment, Mbombela, Mpumalanga Province. HIA Phase 1 25/11/2019 Jean-Pierre Celliers Kudzala Antiquity Eco8 Environmental Planners 30/05/2023 - 11:24
DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF THE PROPOSED BRONKHORSPRUIT RAIL SIDING REDEVELOPMENT PROJECT, NEAR BRONKHORSTSPRUIT, GAUTENG PROVINCE DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF THE PROPOSED BRONKHORSPRUIT RAIL SIDING REDEVELOPMENT PROJECT, NEAR BRONKHORSTSPRUIT, GAUTENG PROVINCE PIA Desktop 16/07/2016 Barry Millsteed Heritage Contracts and Archaeological Consulting Zantow Environmental Consulting Services 08/02/2017 - 14:04
Phase 1 HIA for the Proposed Khutsong South Extension 8 Housing Development Phase 1 Heritage Impact Assessment for the Proposed Khutsong South Extension 8 Housing Development, Merafong City Local Municipality, West Rand District Municipality, Gauteng HIA Phase 1 30/06/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Afzelia Environmental Consultants Pty Ltd 12/04/2021 - 18:15
Desktop PIA Altina Solar PV near Orkney PALAEONTOLOGICAL DESKTOP ASSESSMENT - ALTINA 120 MW SOLAR PHOTOVOLTAIC PROJECT NEAR ORKNEY IN THE FREE STATE PIA Desktop 01/07/2022 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 04/07/2023 - 12:26
Revised Burbreeze Pipeline PIA REVISED DESKTOP PALAEONTOLOGICAL ASSESSMENT FOR THE PROPOSED BURBREEZE PIPELINE PROJECT, TONGAAT, ETHEKWINI METROPOLITAN MUNICIPALITY, KWAZULU-NATAL PROVINCE. PIA Desktop 23/02/2017 Gideon Groenewald 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 03/04/2017 - 10:41
Argent Siding AIA-003/14_15 Phase 1 Archaeological Impact Assessment for Environmental Assurance (Pty) Ltd on the area demarcated for the development of Argent Siding near Delmas, Mpumalanga. AIA Phase 1 01/11/2014 Tobias Coetzee Environmental Assurance 23/11/2015 - 13:27
Archaeological Impact Assessment for Belfast Resettlement Project Phase 1 Archaeological Impact Assessment for the Belfast Implementation Project: Resettlement Site, Mpumalanga Province AIA Phase 1 10/03/2016 JP Cilliers South African Heritage Resources Agency South African Heritage Resources Agency 28/10/2016 - 14:45
Bredell HIA Exemption request LETTER FOR HIA EXEMPTION REQUEST: RE-ESTABLISHING OF THE FLOODLINE ON HOLDING 56, BREDELL AGRICULTURAL HOLDINGS, GAUTENG PROVINCE HIA Letter of Exemption 03/04/2018 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Texture Environmental Consultants 31/05/2018 - 13:49
AIA Erf 330 Crown Mines Archaeological Impact Assessment For the proposed filling station on Erf 330 Crown Extension 18, Crown Mines, Gauteng AIA Phase 1 15/08/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Marinda le Roux Consulants 23/09/2013 - 16:59
HIA Melkstroom Development Heritage Impact Assessment for the Proposed Development of an Agri-estate on the Farm Melkstroom East of Upington, Gordonia Magisterial District, Northern Cape Province HIA Phase 1 01/03/2012 Johnny Van Schalkwyk Heritage Consultants MEG Environmental Impact Studies 05/03/2013 - 12:35
AIA; Portswood Ridge, Site B, Green Point A DESKTOP ARCHAEOLOGICAL ASSESSMENT OF PORTSWOOD RIDGE – SITE B, GREEN POINT, CAPE TOWN AIA Desktop 01/05/2014 Timothy Hart ACO Associates CC Nicolas Baumann Urban Conservation and Planning 19/07/2018 - 12:07
Palaeontological Impact Assessment Palaeontological Impact Assessment: Desktop Study PIA Desktop Heidi Fourie Exigo3 Sustainability Magogudi Construction Projects CC 04/11/2019 - 18:07
HIA Zuurwater 62 Boesmanland 75 MW PV 2602 DRAFT PHASE ONE INTEGRATED HERITAGE IMPACT ASSESSMENT COMPILED IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999) PROPOSED BOESMANLAND SOLAR FARM (75MW): PORTION (300HA) OF THE FARM ZUURWATER 62/6, NAMAQUALAND DISTRICT, NORTHERN CAPE PROVINCE 01/04/2012 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 04/06/2012 - 09:02
Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study Report for the Proposed Road Upgrade from Gravel to Tarred Surface at Ramokokastad Village in Moses Kotane Local Municipality, North West Province Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study Report for the Proposed Road Upgrade from Gravel to Tarred Surface at Ramokokastad Village in Moses Kotane Local Municipality, North West Province AIA Phase 1 02/01/2006 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:33
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED AUTHORISATION OF ERMELO-RICHARDS BAY COAL LINK UPGRADE PROJECT: DEVELOPMENT OF THE VRYHEID TRACTION STATION AND THE ASSOCIATED TURN-IN POWER LINES WITHIN THE ABAQULUSI LOCAL MUNICIPALITY OF ZULULAND DISTRICT IN KWAZULU PROVINCE HIA Phase 1 01/07/2019 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Ecosolve (Pty) Ltd 25/02/2020 - 21:07
PROPOSED DEVELOPMENT OF THE REFELE VILLAGE SPORTS FACILITY PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF THE REFELE VILLAGE SPORTS FACILITY, MOUNT FLETCHER WITHIN ELUNDINI LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE AIA Phase 1 03/08/2020 Celeste Booth Booth Heritage Elundini Local Municipality 14/04/2021 - 10:45
1518 PIA for Eskom Gamohaan Powerline PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED KURUMAN GAMOHAAN SEVEN MILES 22KV POWERLINE ON THE REMAINING EXTENT OF THE FARM KURUMAN RESERVE 690, IN KURUMAN, NORTHERN CAPE PROVINCE Palaeontological Specialist Reports 28/08/2022 Elize Butler PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 07/10/2022 - 12:27
Aliwal North FET Colleges APPLICATION FOR EXEMPTION ON THE PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN ALIWAL NORTH, EASTERN CAPE PROVINCE. HIA Letter of Exemption 14/02/2014 Makhosazana Mngomezulu 25/11/2013 - 15:37
SAS6986 - DBAR Appendix E (NID & RfE) Basic Assessment Process for the Construction of a Pump Station and Pipeline for Wollie se Gat, Secunda: Notification of Intent to Develop HIA Phase 1 30/04/2021 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Sasol Mining (Pty) Ltd 10/06/2021 - 14:35
AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape AIA Phase 1 21/11/2022 Karen Van Ryneveld 21/11/2022 - 06:27
HIA - Castle WEF Full Palaeontological Heritage Impact Assessment Report on a Portion of a Proposed Wind Energy Generation Facility (The Castle Project); This Being on the Eastern Extent of the Farm Knapdaar 8 near De Aar, Northern Cape Province Heritage Impact Assessment Specialist Reports 24/11/2014 Barry Millsteed Savannah Environmental (Pty) Ltd 01/12/2014 - 16:45
Heritage report Queenswood Extension 14 Cultural heritage impact assessment for THE PROPOSED TOWNSHIP ESTABLISHEMENT ON PART OF PORTION 69 OF THE FARM KOEDOESPOORT 325JR, CITY OF TSHWANE, GAUTENG PROVINCE HIA Phase 1 10/10/2016 J Paul van Wyk 15/05/2017 - 09:56
HIA Scoping: construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro Scoping Heritage Impact Assessment for the construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro, Western Cape Heritage Scoping 23/10/2009 Timothy Hart ACO Associates CC Savannah Environmental (Pty) Ltd 24/07/2017 - 15:33
Proposed Ntunjambili BWSS Phase 1 Heritage Impact Assessment Report Proposed Ntunjambili Bulk Water Supply Pipeline Ward 1 and 2 Maphumulo Local Municipality, Ilembe District Municipality, KwaZulu-Natal 16/05/2018 Len van Schalkwyk eThembeni Cultural Heritage Black Cubans Consulting (PTY) Ltd 19/07/2018 - 16:53
Archaeology Archaeological Impact Assessment Report AIA Phase 1 20/03/2016 Karen Van Ryneveld ArchaeoMaps ArchaeoMaps 13/04/2016 - 16:18

Pages

CSV
 
 

Search form