FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Addendum to HIA, Springbok Wind Farm SPRINGBOK WIND ENERGY FACILITY Portions 17 and 19 of Farm No. 134; Portion 0 (Remaining Extent) and Portion 1 (Remaining Extent) of Farm No. 132;Portion 0 (Remaining Extent) of Farm No. 946; Portion 0 (Remaining Extent) of Farm No. 215;Portion 0 of Farm No. 635; and Portion 9 (Remaining Extent) of Farm No. 133 NAMAQUALAND MAGISTERIAL DISTRICT HIA Phase 2 23/11/2017 Ron Martin Ron Martin Heritage Consultancy Longyuan Mulilo Wind Power (Pty) Ltd 22/11/2017 - 12:47
Alabama Extension 6 Pahse 1 HIA Phase 1 Cultural Heritage Resources Impact Assessment Phase 1 Cultural Heritage Resources Impact Assessment for the proposed town development Alabama Extension 6 and the rezoning of Park Erf 19613, Jouberton Extension 19. The proposed township establishment is situated on a poriton of the Remaining Extent of Portion 1 of the farm Townlands of Klerksdorp No. 424-IP North West Province HIA Phase 1 09/06/2016 Udo Kusel African Heritage Consultants CC Maxim Planning Solutions 23/08/2016 - 11:51
Davel Project A Phase I Heritage Impact assessment study for the proposed Davel Project near Bethal in the Mpumalanga Province Heritage Impact Assessment Specialist Reports 01/11/2017 Julius CC Pistorius Jaco K Consulting 21/02/2018 - 17:39
AIA Bospoort 558 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF THE REMAINDER OF THE FARM BOSPOORT 558 FOR THE PROPOSED BOSPOORT SAND MINE PROJECT IN THE FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE AIA Phase 1 25/02/2019 Nelius Kruger Exigo3 Sustainability LW Consultatns 14/03/2019 - 12:59
Klipfontein 268 JR Heritage Scoping Report for the Prospecting Right Application on the Farm Klipfontein 268 JR Platinum Group Metals (RSA) (Pty) Ltd in the Gauteng Province AIA Phase 1 22/10/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting Batho Earth Social and Environmental Consultants 26/10/2012 - 10:31
Eq 269 Exemption HIA Letter of Recommendation for Exemption: PROPOSED DEVELOPMENT OF EQUESTRIA EXTENSION 269 ON HOLDING 213, WILLOW GLEN AGRICULTURAL HOLDINGS, CITY OF TSHWANE DISTRICT MUNICIPALITY, GAUTENG PROVINCE HIA Letter of Exemption 01/09/2017 J.A. van Schalkwyk JA van Schalkwyk Heritage Consultant J Paul van Wyk 06/06/2019 - 10:42
Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province HIA Phase 1 06/04/2022 Jaco van der Walt Beyond Heritage Cape Environmental Assessment Practitioners 11/05/2022 - 08:12
Locomotive Turnaround Richards Bay Cultural Heritage Impact Assessment of the proposed Richards Bay Harbour Locomotive Turnaround,KwaZulu Natal HIA Phase 1 17/01/2013 Frans Prins Active Heritage CC Jeffares & Green - Pietermaritzburg 11/02/2013 - 12:29
Archeological Impact Assessment for Proposed Barry Marais Proposed Barry Marais Road-K155 Upgrade AIA Phase 1 02/09/2019 Eric Ndivhuho Mathoho Millenium Heritage Group (Pty) Ltd Tholoana Sustainable Development and Environmental Consultants 19/01/2021 - 12:08
Elliot Agricultural Developments PHASE 1 HIA REPORT RELATED TO THE PROPOSED ELLIOT AGRICULTURAL DEVELOPMENTS [PIGGERY/FEEDMILL AND CLOETE SITESS 1–3], NEAR KHOWA (ELLIOT) IN THE SAKHISIZWE LOCAL MUNICIPALITY OF THE EASTERN CAPE - APAC022/43a HIA Phase 1 16/05/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bioblue Environmental Sustainability 13/07/2022 - 13:45
PIA: BOSTON HYDRO POWER GENERATION SCHEME AND ASSOCIATED GRID INFRASTRUCTURE, FREE STATE PROVINCE PALAEONTOLOGICAL IMPACT ASSESSMENT: PROPOSED 5 MW BOSTON HYDRO POWER GENERATION SCHEME AND ASSOCIATED GRID INFRASTRUCTURE, IN THE FREE STATE PROVINCE PIA Phase 1 31/03/2023 Elize Butler Banzai Environmental (Pty) Ltd Boston Hydro Power Plant (Pty) Ltd 08/05/2023 - 09:38
NONDABUYA PIPELINE HERITAGE SURVEY OF THE JOZINI INGWAVUMA WATER SUPPLY PROJECT; NONDABUYA PIPELINE HIA Phase 1 11/08/2013 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management WSP Environmental Pty Ltd - Durban 22/04/2014 - 12:43
PGS Heritage_ArcelorMittal South Africa (AMSA) Heritage Impact Assessment Report for the ArcelorMittal South Africa (AMSA) Vanderbijlpark Solar Energy Facility Heritage Impact Assessment Specialist Reports 23/03/2023 Michelle Sachse PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 08/06/2023 - 16:19
Residential Township development, Tekwane extension 2, Kanyamazane Phase 1 Archaeological / Heritage Impact assessment for proposed residential Township, Tekwane extension 2, portion 7 of Tekwane 537JU, Kanyamazane AIA Phase 1 23/08/2015 Christine Van Wyk Rowe Adansonia Heritage Consultants Wandima Environmental Services cc 23/08/2015 - 11:15
Umqeku river bridge HIA desktop Desktop Survey of the Umqeku Low Level Bridge AIA Desktop 22/09/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management JG AFRIKA 03/03/2017 - 09:27
AIA_Dwesa_Cwebe_revised_Magoma_M_Apr12 ARCHAEOLOGICAL INVESTIGATION FOR THE PROPOSED CONSTRUCTION OF 15 STAFF ACCOMMODATION UNITS AND SEWEGE TREATMENT PLANT IN DWESA CWEBE NATURE RESERVE WITHIN THE JURISDICTION OF MBASHE LOCAL MUNICIPALITY WHICH IN TURN FALLS UNDER THE AMATHOLE DISTRICT MUNICI AIA Phase 1 23/04/2012 Munyadziwa Magoma Engwe Scoping Cultural Heritage 16/06/2012 - 14:44
Integrated HIA: Proposed Ephraim Sun Solar PV Development INTEGRATED HERITAGE IMPACT ASSESSMENT IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999): PROPOSED DEVELOPMENT OF EPHRAIM SUN SOLAR PV DEVELOPMENT ON THE REMAINDER OF PORTION 62 (A PORTION OF PORTION 9)(VRYHEID) OF THE FARM VAALKOPPIES 40, INCLUDING GRID CONNECTIONS ALTERNATIVES ACROSS PORTIONS OF THE FARM VAAL KOPPIES 40/3, 9, 52 & 66; FARM 555/7; AND ERVEN 73 & 19951, //KHARA HAIS MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 2 20/10/2015 Stefan de Kock, Peter Nilssen, John Almond, Stephen Stead 20/10/2015 - 13:32
CTS16_049 Roodepan 180 CTS16_049 Ilke Nel Roodepan 180 North West Province - Proposed Opencast Diamond Mine 03/10/2016 Jenna Lavin, Kyla Bluff CTS Heritage 10/10/2016 - 08:07
PGS06 - Phase 2 Mitigation report Phase 2 Specialist Study of affected Stone Age Locality on the ACWA Power SolarReserve Redstone Solar Thermal Power Plant Site PGS06 – farm 469 “Humansrus” close to Postmasburg in the Northern Cape Province Archaeological Permit Report 04/11/2016 Wouter Fourie, Timothy Robin Forssman, Marko Hutten, Jessica Angel PGS Heritage and Grave Relocation Consultants ACWA Power SolarReserve Redstone Solar Thermal Power Plant 15/11/2016 - 12:53
PIA BREIDBACH SEWER AND PUMPSTATION DESKTOP PALAEONTOLOGICAL ASSESSMENT AND “CHANCE FIND PROTOCOL” FOR THE PROPOSED BREIBACH RISING MAIN AND PUMP STATION IN THE BUFFALO CITY LOCAL MUNICIPALITY, AMATHOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. PIA Desktop 23/08/2019 Dr. Gideon Groenewald Dr. Gideon Groenewald Makhetha Environmental Consultants 11/09/2019 - 10:17
Draft Environmental Scoping Report Draft Environmental Scoping Report for the Proposed Continuous Ash Disposal Facility for the Matimba Power Station in Lephalale, Limpopo Province 29/04/2013 Phyllis Kalele Royal Haskoning DHV Eskom Holdings SOC Ltd 06/05/2013 - 10:45
AIA_Phase 1 _ Clearing of vegetation_Portion 1 of the Farm Vissers Vale No. 96 A Phase 1 Archaeological Impact Assessment for the proposed clearing of approximately 10 hectares of natural vegetation for agricultural activities and the establishment of a warehouse, three chalets and a residential dwelling on the Remainder of Portion 1 of the Farm Vissers Vale No. 96 near Addo in the Sundays River Valley Municipality of the Eastern Cape Province AIA Phase 1 10/12/2019 Johan Binneman, Kobus Reichert Eastern Cape Heritage Consultants Habitat Link Consulting (Pty) Ltd 10/12/2019 - 13:41
Heritage Impact Assessment Heritage Impact Assessment & Palaeontological Desk Assessment for a Mining Right Application on Portion 1 (Neel Dale), Portion 2 (Witkop), Portion 3 (Eijerdop Put), Portion Eyerdop Pan 58, Near Marydale, Northern Cape Province Heritage Impact Assessment Specialist Reports 11/03/2021 Edward Matenga Edward Matenga 12/03/2021 - 07:54
Rietspruit Wastewater Treatment Works conveyances Heritage Impact Assessment for the proposed upgrade of the Rietspruit Wastewater Treatment Works conveyances, Gauteng Province, South Africa HIA Phase 1 01/07/2022 Lara Lucija Kraljević SAHRA Council Beyond Heritage 01/09/2022 - 10:00
Palaeontological Impact Assessment - TSE PALAEONTOLOGICAL IMPACT ASSESSEMENT REPORT ON THE SITE OF A PROPOSED SUBSTATION ON PORTION 8 OF FARM DAMFONTEIN 114, NEAR NOUPOORT, USOMBOMVU LOCAL MUNICIPALITY, NORTHERN CAPE Palaeontological Specialist Reports 30/06/2013 Barry Millsteed BM Geological Services Savannah Environmental (Pty) Ltd 12/07/2013 - 11:56
Deerpark Shopping Centre Proposed new shopping centre Deerpark, Tzaneen, Limpopo HIA Phase 1 12/08/2013 Frans Roodt Shasa Heritage Consultants CC Polygon Environmental Planning CC 08/07/2014 - 11:34
AIA FOR THE PROPOSED CLUSTER 6 MNYOLO & JALISA BULK RETICULATION PROJECT, MNYOLO AREA, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED CLUSTER 6 MNYOLO & JALISA BULK RETICULATION PROJECT, MNYOLO AREA, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 22/02/2021 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - East London 07/05/2021 - 23:37
HERITAGE STATEMENT – For the Part 2 Amendment for the Booysendal BS4 Vent Shaft. HERITAGE STATEMENT – For the Part 2 Amendment for the Booysendal BS4 Vent Shaft. Heritage Statement 04/10/2022 Jaco van der Walt Beyond Heritage GCS Water and Environmental Consultants - Durban 25/10/2022 - 11:06
Heritage Impact Assessment - Copper 25/07/2023 - 09:24
Jozini-Ingwavuma Water Supply Scheme Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed Jozini-Ingwavuma Water Supply Scheme, Zones 8-12, Jozini Local Municipality, uMkhanyakude District Municipality KwaZulu-Natal HIA Letter of Exemption 28/09/2014 Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 06/10/2014 - 11:43
Cultural Heritage Impact Assessment CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED HOUSING DEVELOPMENT ON PORTIONS 72 AND 162 OF THE FARM WATERKLOOF 305JQ, RUSTENBURG, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 21/03/2017 Anton van Vollenhoven HydroScience HydroScience 19/04/2017 - 10:37
AIA Upgrade of the K101 between Brakfontein Road and Road D795 Archaeological Impact Assessment for the proposed upgrade of the K101 between Brakfontein Road (Km 14.4) and Road D795 (Km 9.0), Gauteng Province AIA Phase 1 07/07/2015 Neels Kruger Exigo3 Sustainability Interdesign Landscape Architects 09/12/2015 - 08:34
Mortimer Heritage Assessment A Report on Cultural Heritage Impact Assessment for the Proposed Mortimer Smelter SO2 Abatement Project, North West Province HIA Phase 1 12/04/2017 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants WSP Environmental Pty Ltd - Johannesburg 14/06/2017 - 13:22
AIA Jan Smuts Upgrade Archaeological Impact Assessment for the proposed Jan Smuts Carriage Way, Gauteng Province AIA Phase 1 13/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirolution Consulting (Pty) Ltd 19/06/2018 - 09:28
Department of Defence (DoD) Intelligence HIA Phase 1 Cultural Heritage Impact Assessment of the proposed Head quarters office complex construction of the Department of Defence Intelligence at the South African National Intelligence College (SADIC), Pretoria Gauteng HIA Phase 1 01/08/2010 Strategic Environmental Focus (Pty) Ltd - Pretoria 01/03/2016 - 13:05
Umhlatuzana 2018 Report on 2018 fieldwork at Umhlatuzana Rockshelter Archaeological Permit Report 22/08/2018 Gerrit Leendert Dusseldorp, Geeske Langejans 22/08/2018 - 10:12
Phase 1 for AIA for Rietfontein Mining Permits A Phase 1 Archaeological Impact Assessment for the Proposed Mining Development on Three Portions intersecting Portion 2 of the Farm Rietfontein 314 JS near Middelburg, Mpumalanga AIA Phase 1 15/08/2021 Tobias Coetzee 15/09/2021 - 10:55
Letter of Exemption Archaeological Study Calvinia Sewer Pipeline ARCHAEOLOGICAL SPECIALIST STUDY: LETTER OF EXEMPTION CONSTRUCTION OF SPORTS FIELD IRRIGATION AND FACILITIES INFRASTRUCTURE IN CALVINIA, HANTAM LOCAL MUNICIPALITY, NORTHERN CAPE HIA Letter of Exemption 16/03/2020 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 31/03/2020 - 12:36
AIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, Nelson Mandela Bay Municipality, Eastern Cape AIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, Nelson Mandela Bay Municipality, Eastern Cape AIA Phase 1 19/11/2021 Karen Van Ryneveld 19/11/2021 - 11:10
ENNERDALE EXTENSION 6 ON ERF 4625 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ENNERDALE EXTENSION 6 ON ERF 4625 GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 11/10/2022 Jaco van der Walt Beyond Heritage Setala Environmental 25/10/2022 - 16:08
SUNNYSIDE BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED LAND USE DEVELOPMENT AT SUNNYSIDE 2620, BLOEMFONTEIN AIA Phase 1 10/09/2013 Cobus Dreyer NSVT Consultants 12/09/2013 - 20:12
Heritage Impact Assessment Heritage Impact Assessment Eskom Camden Power Station Heritage Impact Assessment Specialist Reports 04/07/2020 Edward Matenga Green Gold Consulting Eskom Generation 13/08/2020 - 14:21
Heritage Crime - SEIA for the Expropriation Bill, 2019 Heritage Crime - SEIA for the Expropriation Bill, 2019 Non Impact Assessment Related Reports 04/07/2021 Karen Van Ryneveld 04/07/2021 - 16:09
Kudu Solar Facility 4 Heritage Scoping Report HERITAGE SPECIALIST SCOPING REPORT INPUTS: Scoping and Environmental Impact Assessment (EIA) Process for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 4) and associated infrastructure, near De Aar, Northern Cape Province Heritage Scoping 18/08/2022 Jayson Orton ASHA Consulting(Pty) Ltd CSIR 11/12/2022 - 21:09
Heritage Impact Assessment report for the Proposed Waterval Retrofit E-feed Project A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WATERVAL RETROFIT E-FEED PROJECT AT THE RUSTENBURG PLATINUM MINES LIMITED (RPM) LOCATED IN THE NORTHWEST PROVINCE HIA Phase 1 30/09/2013 Anton van Vollenhoven 14/11/2013 - 15:54
Archaeological Impact Assessment for Postmasburg Solar PV Energy Facility 2, RE/436 Kapstewel, Postmasburg ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF POSTMASBURG SOLAR PV ENERGY FACILITY 2 (previously named RE Capital 10 Solar Development) on the Remaining Extent of the Farm Kapstewel 436, Postmasburg, Northern Cape. (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999) AIA Phase 1 30/11/2014 Lita Webley ACO Associates CC Postmasburg Solar PV Energy Facility 2 (Pty) Ltd. 03/02/2015 - 12:59
Proposed reconstruction Station Street to Fitzpatrick Street Fleet Street East London - Proposed reconstruction Station Street to Fitzpatrick Street Heritage Impact Assessment Specialist Reports 01/05/2012 Gillian Vernon Environmental Impact Management Services (Pty) Ltd 14/06/2012 - 11:25
Report on Archaeological Sites Between Bloubergstrand and Melkbosstrand Report on Archaeological Sites Between Bloubergstrand and Melkbosstrand AIA Phase 1 01/01/1991 Graham Avery Iziko: South African Museum 16/06/2012 - 14:33
MINING RIGHTS APPLICATION THE MINING RIGHT APPLICATION FOR THE PROPOSED MINING DEVELOPMENT FOR DIAMOND KIMBERLITE (DK) AND DIAMOND GENERAL (DG) ON FARM VILJOENSHOF 1655 IN BOSHOF, FREE STATE, SOUTH AFRICA Tiyiselani Macebele, Election Nhlawulo Mahori, Fortunate Ngubeni Biomental Services (Pty) Ltd Biomental Services (Pty) Ltd 21/09/2023 - 08:21
Botswana Report Site Inspection Report 24/08/2021 - 23:04

Pages

CSV
 
 

Search form