FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA Sparrow Grid Connection, North West Province HIA Sparrow Grid Connection, North West Province HIA Phase 1 28/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 24/10/2023 - 09:43
AIA_Qumanco_Borrow_Pit_Van_Ryneveld_K_Jun11 The Qumanco Borrow Pit, near Engcobo, Chris Hani District Municipality, Eastern Cape, South Africa AIA Phase 1 27/06/2011 Karen Van Ryneveld 16/06/2012 - 14:49
Roodepoort Strengthening HIA HERITAGE IMPACT ASSESSMENT FOR THE ROODEPOORT STRENGTHENING PROJECT, 2527DD, ROODEPOORT, GAUTENG HIA Phase 1 20/02/2014 Natasha Higgitt, Johan Nel Digby Wells Environmental Fourth Element Consulting (Pty) Ltd 21/02/2014 - 10:44
Proposed new power line at Sedibeng Mine Phase 1 Heritage Impact Assessment of a proposed new power line at Sedibeng Mine, Postmasburg, NC HIA Phase 1 17/04/2015 Lloyd Rossouw 20/04/2015 - 08:44
PIA 132 kV Powerline from Melkspruit Substation to Rouxville Substation PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED ESKOM 132KV POWERLINE FROM MELKSPRUIT SUBSTATION IN ALIWAL NORTH WITHIN WALTER SISULU LOCAL MUNICIPALITY IN EASTERN CAPE PROVINCE TO ROUXVILLE SUBSTATION WITHIN MOHOKARE LOCAL MUNICIPALITY IN THE FREE STATE PROVINCE PIA Phase 1 27/08/2017 Elize Butler Banzai Environmental (Pty) Ltd NSVT Consultants 15/11/2017 - 14:02
Heritage Impact Assessment for Beyers Naude (K31) A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WIDENING AND UPGRADE OF BEYERS NAUDE AVENUE (K31) IN THE MUNICIPAL AREAS OF MOGALE CITY AND CITY OF JOHANNESBURG, GAUTENG PROVINCE. HIA Phase 1 16/08/2016 17/08/2016 - 08:47
Amended Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DIAMONDS ALLUVIAL AND DIAMONDS GENERAL PROSPECTING RIGHT NEAR SCHWEIZER-RENEKE ON PORTION 2 AND A CERTAIN EXTENT OF THE REMAINING EXTENT OF THE FARM KAMEELKUIL 88HO, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 17/02/2018 Johan van Schalkwyk 19/02/2018 - 08:52
Oshoek Palaeontological Assessment PIA Phase 1 08/03/2019 - 12:56
Pofadder 2 WEF Heritage Reports PROPOSED POFADDER WIND ENERGY FACILITY 2, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 01/03/2022 Jayson Orton ASHA Consulting(Pty) Ltd SiVEST SA (Pty) Ltd 29/03/2022 - 11:18
Ngqura 16 Mtpa Heritage Reports Phase 1 Heritage Impact Assessment Kimberley to De Aar HIA Phase 1 10/10/2012 Elize Becker Hatch 19/10/2012 - 13:01
Granor Passi Heritage Screener Effluent Evaporation Ponds, Louterwater, Eastern Cape Intangible Heritage Report 16/05/2016 Mariagrazia Galimberti CTS Heritage SRK Consulting (South Africa) (Pty) Ltd - PLZ 28/09/2016 - 13:05
Vingerkraal HIA Report Heritage Impact Assessment Report. Formalisation of Demarcated Sites On Ptn 5 Of The Farm Vingerkraal 472-Kq within the Bela-Bela Local Municipality of Waterberg District. HIA Phase 1 31/05/2019 Frans Roodt Phaki Phakanani 03/06/2019 - 07:25
HIA for the proposed KAMA mining minerals prospecting rights at Dumisa Heritage Impact Assessment for the proposed KAMA mining minerals prospecting rights at Dumisa, on a portion of Farm Alexandra Native Location NO. 2 16458 in Umdoni local municipality, Ugu district municipality in the KwaZulu-Natal province of South Africa HIA Phase 1 20/04/2022 jennifer Mokakabye Conservation Exposure Education and Training (CEET) Setjo Sesho Consultants 02/06/2022 - 10:29
Portion 11 of Farm 1426 Paarl NID Portion 11 of Farm 1427 NID Graphic Material and NID Form Heritage Scoping 17/08/2022 Lize Malan 28/03/2023 - 13:12
Phase 1 Cultural Heritage Impact Assessment:THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS (DIA) NEAR WOLMARANSSTAD ON THE REMAINING EXTENT, PORTION 7 AND PORTION 8 OF THE FARM ROOIBULT 152, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE HIA Phase 1 13/10/2020 Johnny van Schalkwyk 13/11/2020 - 15:28
Heritage Impact Assessment Report HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 Heritage Scoping 07/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 17/05/2023 - 14:46
HIA: Swaziland Rail Link Cultural heritage impact assessment for THE PROPOSED SWAZILAND RAIL LINK, WESTERN SECTION, MPUMALANGA REGION HIA Phase 1 01/09/2013 Johnny Van Schalkwyk Aurecon - Head Office 14/04/2014 - 14:00
AIA, Sabie Sand Nature Reserve Kirkman's Kamp Phase 1 Archaeological Survey on the farm Toulon 383 KU located in Sabie Sand Nature Reserve, Mpumalanga Province. AIA Phase 1 30/09/2016 Jean-Pierre Celliers Kudzala Antiquity Henwood Environmental Services 12/12/2016 - 15:41
Delta HIA (2016) 05/02/2021 - 11:28
Umsobomvu Heritage Scoping Report PROPOSED UMSOBOMVU SOLAR PV ENERGY FACILITIES Heritage Scoping Report Heritage Scoping 24/07/2019 Wouter Fourie PGS Heritage (Pty) Ltd Sivest - Gauteng 30/07/2019 - 11:27
Nur el Houda Mosque Nur El Houda Erf 1895 Bo-kaap Cape Town Heritage Statement 02/07/2014 Quahnita Samie Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants 02/07/2014 - 12:25
HMP for Taung Skull WHS Heritage Management Plan for the Taung Skull WHS Conservation Management Plan 28/07/2015 Francois Odendaal, Jonathan Kingwill EcoAfrica Environmental Consultants EcoAfrica Environmental Consultants 17/08/2015 - 15:55
LETTER OF RECOMMENDATION FOR THE PROPOSED COEGA KOP WELLFIELD A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED COEGA KOP WELLFIELD ON ERF 1, WELLS ESTATE IN WARD 53 NEAR PORT ELIZABETH IN THE NELSON MANDELA BAY MUNICIPALITY OF THE EASTERN CAPE PROVINCE AIA Phase 1 31/10/2016 Johan Binneman, Kobus Reichert Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit 28/02/2017 - 15:50
APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY TELECOMMUNICATIONS MAST, LETAMO ESTATE PROPOSED CONSTRUCTION OF A TELECOMMUNICATIONS MAST, LETAMO ESTATE, GAUTENG PROVINCE. APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY HIA Letter of Exemption 13/10/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Lokisa Environmental Consulting CC 13/10/2015 - 13:55
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:49
Maritime Archaeological Survey for Monwabisi and Strandfontein Desalination Plants Maritime Archaeological Diving Survey for the Cape Town Emergency Water Resilience Project, Strandfontein and Monwabisi, False Bay, South Africa. Visual Impact Assessment 15/01/2018 Vanessa Maitland Vanessa Maitland Worley Parsons RSA (Pty) Ltd 14/06/2018 - 15:07
PPC Dwaalboom Waste Tyre Storage Areas Phase 1 Heritage Assessment A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW TYRE STORAGE FACILITY AT PPC DWAALBOOM NORTHWEST OF NORTHAM, LIMPOPO PROVINCE Heritage Impact Assessment Specialist Reports 24/03/2022 Anton Pelser 29/07/2022 - 07:47
HIA_Eyethu Kromdraai Coal Mine A Report on a Heritage Impact Assessment (HIA) for the proposed Eyethu Kromdraai Coal Mine close to Delmas, Mpumalanga HIA Phase 1 01/07/2012 Anton van Vollenhoven Archaetnos CC Geovicon Environmental (Pty) Limited 29/04/2013 - 12:03
Springhaas LiLo 2 Heritage Impact Assessment Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:24
Kokstad N2 Interchange PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED CONSTRUCTION OF THE KOKSTAD N2/R56 INTERCHANGE ON NATIONAL ROUTE 2 SECTION 21 (KM 6.4), SISONKE DISTRICT MUNICIPALITY, GREATER KOKSTAD LOCAL MUNICIPALITY, KWAZULU-NATAL. Heritage Scoping 28/04/2022 Len van Schalkwyk eThembeni Cultural Heritage SANRAL, GIBB Environmental 23/06/2023 - 12:58
Klipdrift Shelter 2011 Excavations Report Report on the 2011 archaeological excavations at Klipdrift Cave and Shelter Complex, southern Cape, South Africa Archaeological Permit Report 01/12/2011 Christopher Henshilwood University of the Witwatersrand University of the Witwatersrand - Institute for Human Evolution 04/07/2013 - 14:07
Heritage Study - Walmer Estate Walmer Estate Conservation Survey: For the Department of Community Development by the vernacular architecture society of South Africa Heritage Study 01/05/1977 Graeme Binckes Department of Community Development 23/03/2021 - 12:48
Soyuz 2 SEF Heritage Impact Assessment Heritage Impact Assessment: Proposed Soyuz 2 Solar Photovoltaic Park, outside Britstown, Northern Cape Province HIA Phase 1 30/06/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 15/08/2023 - 13:56
SAS5202 - Chance Finds Protocol Implementation of the Leeuspruit Risk Mitigation Measures Monitoring Plan: Chance Finds Protocol Non Impact Assessment Related Reports 28/10/2019 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Sasol Mining (Pty) Ltd 28/10/2019 - 11:48
Mhlabatshane BWSS HERITAGE SURVEY OF THE MHLABATSHANE BWSS PHASE 2 HIA Phase 1 23/08/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 30/09/2014 - 10:44
HIA Mambeni Gravel Road Proposed construction of 5.4 km gravel road in Mambeni Village, on the Farm Mthembu 17484 Msinga LM, Mzinyathi District DM, KwaZulu-Natal. Heritage Impact Assessment Specialist Reports 10/03/2017 Len van Schalkwyk eThembeni Cultural Heritage Magalela & Associates (Pty) Ltd 12/04/2017 - 13:14
GPR-Dodoma Place (Kennedy Road) Housing Project, Durban, KZN Ground Penetrating Radar (GPR) Heritage Assessment - Dodoma Place (Kennedy Road) Housing Project, Erven 402-407 Springfield, Durban, Ethekwini Metropolitan Municipality, KwaZulu-Natal. Ethekwini MM-HSU: PQ No. 7H-17381 / SAHRIS CaseID 4969 / AMAFA Ref: SAH14/4969 Burial Grounds and Graves Specialist Reports 08/12/2015 Barry Barnardt, Karen Van Ryneveld, Duane Fourie eThekwini Department of Human Settlements 08/12/2015 - 10:23
HIA Thornridge Farm CULTURAL HERITAGE IMPACT ASSESSMENT OF PORTION P55 OF UITKOMST AND DOORNRUG (THORNRIDGE), CATO RIDGE, ETHEKWENI MUNICIPALITY. HIA Phase 1 01/10/2015 Frans Prins 06/06/2017 - 14:12
Palaeontological Heritage Assessment - Gunstfontein WEF Palaeontological Heritage Assessment: Combined Desktop and Field Based Report for the Proposed Gunstfontein WEF near Sutherland, Karoo Hoogland Local Municipality, NC Province. Palaeontological Specialist Reports 21/12/2015 John Almond Natura Viva CC Savannah Environmental (Pty) Ltd 25/02/2016 - 15:59
Palaeo LOE - Kamieskroon PALAEONTOLOGICAL HERITAGE COMMENT: KAMIESKROON BULK WATER SUPPLY, PORTION 4 OF FARM 445, KAMIESBERG MUNICIPALITY, NORTHERN CAPE PIA Desktop 01/01/2018 John Almond Natura Viva CC Enviroafrica CC 16/08/2018 - 15:37
Alterations to Director's Office at the South African Observatory Alterations to Director's Office at the South African Observatory 31/01/2020 SOUTH AFRICAN ASTRONOMICAL OBSERVATORY NATIONAL RESEARCH FOUNDATION 31/01/2020 - 11:30
PAL6882 - BAR Appendix E (HBAR Addendum) Environmental Authorisation Process for the Moorddrift Prospecting Right Application Heritage Basic Assessment Report Addendum HIA Phase 1 02/07/2021 Shannon Hardwick, Johan Nel Digby Wells Environmental PalRho Exploration (Pty) Ltd 06/10/2021 - 18:21
22142-PIA Palaeontological Impact Assessment for the proposed N4 Schoemanskloof R539 road upgrade, Mpumalanga Province PIA Phase 1 15/07/2022 10/11/2022 - 12:51
ILI2395_WILGESPRUIT_HERITAGE_STATEMENT_REPORT HERITAGE STATEMENT REPORT FOR THE WILGESPRUIT BRIDGE UPGRADE Heritage Statement 09/09/2013 Natasha Higgitt, Shahzaadee Karodia Khan Digby Wells Environmental Iliso Consulting (Pty) Ltd 10/09/2013 - 08:59
AIA Loeriesfontein Orlight Transmission Lines HERITAGE IMPACT ASSESSMENT: PROPOSED LOERIESFONTEIN PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 5 OF THE FARM KLEIN ROOIBERG 227, NORTHERN CAPE PROVINCE HIA Phase 1 01/04/2012 Lita Webley, Dave Halkett ACO Associates CC Digby Wells Environmental 11/06/2012 - 14:34
Plaas de Eenzaamheid, Agter-Paarl: Bywerk van struktuuranalise (Mrt) Plaas de Eenzaamheid, Agter-Paarl: Bywerk van struktuuranalise (Mrt) 01/01/2005 Hennie Vos ArCape 16/06/2012 - 14:33
PIA Desktop Assessment for the Proposed Nchwaning Rail Balloon Turn Outs At BRMO, Hotazel, Northern Cape PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED NCHWANING RAIL BALLOON TURN OUTS AT BLACK ROCK MINE OPERATIONS NEAR HOTAZEL, NORTHERN CAPE PIA Desktop 10/06/2020 Elize Butler Banzai Environmental (Pty) Ltd EScience Associates (Pty) Ltd 11/06/2020 - 11:01
MULILO TOTAL HYDRA STORAGE: CONFIRMATION OF PROTECTION OF HERITAGE RESOURCES This letter is to confirm that the final approved layout for the three solar energy facilities forming part of the Mulilo Total Hydra Storage (MTHS) has considered and protected all known heritage resources. The three facilities making up the MTHS are known as:  Badenhorst Solar PV2  Badenhorst Dam Solar PV3; and  Mulilo De Aar PV. Heritage Statement 13/05/2021 Jayson Orton ASHA Consulting(Pty) Ltd Mulilo Total Hydra Storage (Pty) Ltd 24/05/2021 - 10:13
Paleo Report - Hibernia Palaeontological Specialist Reports 31/10/2013 John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 12/11/2013 - 12:09
Coral International Hotel Group Erf 10192, Helliger Lane Bo-kaap Cape Town Quahnita Samie Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants 23/01/2015 - 12:22

Pages

CSV
 
 

Search form