FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
Kokerboom 3 Heritage report for the DEIR HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOKERBOOM 3 WIND ENERGY FACILITY ON FARMS 214/1 AND 214/2, NORTH OF LOERIESFONTEIN, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE 23/04/2021 Jayson Orton 07/09/2021 - 16:34
Heritage Statement 22/08/2022 - 11:06
HEADINGLEY AVENUE THE PROPOSED RESIDENTIAL DEVELOPMENT AT 40 HEADINGLEY AVENUE, eTHEKWINI METROPOLITAN MUNICIPALITY, DAWNCLIFFE, DURBAN, KWAZULU-NATAL Gary Errol Trower Gary Trower 18/03/2022 - 11:51
Building materials used in some colonial structures of Stellenbosch district:1-13 Building materials used in some colonial structures of Stellenbosch district:1-13 01/01/1978 P Locke, Hennie Vos Stellenbosch Museum 16/06/2012 - 08:54
Founders Estates FE 9 Heritage Report 31/08/2022 20/10/2022 - 11:16
Additions and Alterations to 74 Danville Road 18/11/2022 - 07:20
Palaeontological Impact Assessment - Lethabo 24/03/2016 - 16:30
BHIA Maropeng Interpretive Centre Basic Heritage Impact Assessment for the proposed upgrades to the Maropeng Interpretive Centre 01/11/2014 Dominic Stratford 26/09/2016 - 13:10
Manogeng Brief Heritage Report Manogeng Switching Station development - Archaeological Rescue of Human Remains and Artefacts from the site of the Construction of the Manogeng Switching Station Near Roossenekal, Elias Motsoaledi Local Municipality, Limpopo Province 15/12/2022 Edward Matenga Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 01/02/2023 - 15:11
Duduza HIA report 20/04/2015 - 13:20
An investiagtion on Bakkiesfontein 568 IR Archaeological investigations, done at Bakkiesfontein 568 IR, (Dipaliseng Local Municipality) Greylingstad Mpumalanga 06/11/2015 Domonique-Marie Verkerk Department of Anthropology & Archaeology, University of Pretoria 06/11/2015 - 11:21
Kudu Solar Facility 6 Heritage Scoping Report HERITAGE SPECIALIST SCOPING REPORT INPUTS: Scoping and Environmental Impact Assessment (EIA) Process for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 6) and associated infrastructure, near De Aar, Northern Cape Province 18/08/2022 Jayson Orton ASHA Consulting(Pty) Ltd CSIR 11/12/2022 - 21:34
Boitumelo Paleontological Impact Assessment 30/07/2021 - 09:55
HIA 28/06/2023 - 16:55
Monavoni X51 18/07/2013 18/07/2013 - 10:50
Mnandi Filling Station - HIA 10/05/2019 - 10:11
HIA report Sandveld 22 kV powerline re-build HIA report Sandveld 22 kV powerline re-build 24/11/2021 - 14:24
Still to be undertaken 14/10/2014 - 15:00
Archaeological Impact Assessment - Draft EIA Buffels 2 31/08/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 26/09/2016 - 13:24
Heritage Impact Assessment - DBAR Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder 30/06/2016 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 25/01/2017 - 12:42
29 Chiappini Street. Report on a Public Participation Process at Erf 741, Cape Town 29 Chiappini Street. Report on a Public Participation Process at Erf 741, Cape Town 07/01/2005 Mary Patrick, Harriet Clift Cape Archaeological Survey CC 16/06/2012 - 08:54
Application-form-A-Structures (AMAFA) Picture Report Application-form-A-Structures (AMAFA) Picture Report 24/01/2023 Darren Gregory Scott Clifton DGSC Designs DGSC Designs 07/02/2023 - 16:29
Vryburg Solar 1 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province 24/07/2018 JF Durand 16/08/2018 - 15:05
1469_PIA PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MINE WASTE SOLUTONS KAREERAND: RETURN WATER PIPELINE AND MIDWAY SLURRY TRANSFER LINE PROJECT, IN THE NORTH‐WEST PROVINCE Elize Butler PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 04/02/2022 - 12:37
9-2-026-0001-20080731-BPI Palaeontological Impact Analysis, Riverleigh VII CC - Farm 939 Cove Rock 31/07/2008 Bruce Rubidge Evolutionary Studies Institute 16/06/2012 - 14:34
Other_Lesedi_Power_Generation_NONE_Sep10 Heritage Gap Analysis Report for the proposed Lesedi Power Generation Project with archaeological report appended 01/09/2010 16/06/2012 - 14:52
HIA and PIA for Skeerhok PV3 HIA: SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF THE SKEERHOK PV3 SOLAR ENERGY FACILITY ON SMUTSHOEK 395/REMAINDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. 25/01/2018 Jayson Orton ASHA Consulting(Pty) Ltd South African National Research Network (CSIR), Juwi Renewable Energies (Pty) Ltd 21/02/2018 - 15:37
HIA for Mackenzie Park x 3 Heritage Impact Assessment for the Proposed Residential Township, Mackenzie Park Extension 3, Situated on Parts of Remaining Extent of Farm Benoni 77- IR in the Ekurhuleni Metropolitan Municipality, Gauteng Province. 19/04/2018 - 11:29
Air Quality Baseline Assessment AIR QUALITY BASELINE ASSESSMENT FOR SYNCHROPLEX FARM AREACHAP 426 PROSPECTING OPERATION, NORTHERN CAPE – UPINGTON. 04/07/2019 Anton Botha Environmental Assurance (Pty) Ltd 04/06/2019 - 08:55
Aggeneys 1 PV Amendment to Environmental Authorisation: Heritage Comments Aggeneys 1 Part 2 Amendment: Heritage Comments Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 16/10/2020 - 20:32
Not applicable 07/05/2013 - 15:50
HIA; Cape Saw Mills HERITAGE IMPACT ASSESSMENT. SUBMITTED TO HERITAGE WESTERN CAPE IN TERMS OF THE PROVISIONS OF SECTION 38(4) OF THE NATIONAL HERITAGE RESOURCES ACT. “CAPE SAW MILLS”. PORTION 57 OF FARM 183, STELLENBOSCH. (Being Incorporated With The Woodmill Lifestyle Market On Portion 57 Of Farm 158) 01/09/2015 Chris Snelling Lurand Investments (Pty) Ltd 27/06/2018 - 14:31
Complete BAR Report Zilkaatsnek BAR 15/09/2017 - 11:18
Graffiti Removal at Telperion Rock Art shelter Graffiti Removal through intervention at Telperion Rock Art shelter 24/11/2022 Stephen Townley Bassett Oppenheimer Generations Oppenheimer Generations 24/11/2022 - 18:03
Ecological & Wetland Assessment Report for Kophia Diamonds Blaauwboschfontein Ecological & Wetland Assessment Report 14/06/2019 Dr Elizabeth (Betsie) Milne Boscia Ecological Consulting 14/05/2019 - 11:29
Heritage Impact Assessment - DBAR Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder 30/06/2016 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 25/01/2017 - 12:43
Heritage and Paleontological Assessment 05/12/2017 - 09:58
Hidden Hills Golf Estate - HIA 11/04/2019 - 10:58
Aquatic Assessment Report on the aquatic assessment for the proposed alluvial diamond mining operations on a portion of the Remainder of the Farm Pniel 218 including a portion of the Vaal River near the town of Delportshoop, Northern Cape Province. 16/08/2019 J.C Potgieter DPR Ecologists and Environmental Services 16/07/2019 - 13:37
4 Ryde Place - forms 09/10/2023 - 13:50
Other_Tierberg_Rock_Shelter_Avery_G_Oct90 Report on Exploratory Excavation in a Small Rock Shelter on Tierberg, Prince Albert 18/10/1990 Graham Avery Iziko: South African Museum MAPID_02753 16/06/2012 - 14:52
Coral International Hotel Group Erf 10192, Helliger Lane Bo-kaap Cape Town Quahnita Samie Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants 23/01/2015 - 12:22
SAAO Main Building Figures 07/06/2002 Sarah Winter SOUTH AFRICAN ASTRONOMICAL OBSERVATORY NATIONAL RESEARCH FOUNDATION 07/06/2019 - 11:12
Founders Estates Revised Bulk Services Report 22/05/2023 Sarah Winter Sarah Winter Heritage Practitioner Boschendal (Pty) Ltd 22/05/2023 - 11:44
Heritage Input Sonneblom SPP 14/11/2022 - 19:10
Thabatsipi Substation and 132Kv Power line A Base Line Heritage Assessment Report for the Eskom's Thabatsipi Substation and 132Kv Power Line project near Amadelbult and Thabazimbi in the Limpopo Province of South Africa 01/11/2010 Julius CC Pistorius Heritage Archaeologist & Consultant EnviroXcellence 20/08/2012 - 12:50
Leeuwfontein Extension 4 Township Developmen and Formalisation HIA Report 05/08/2016 - 21:44
HIA of Alpine Heath Resort gabion installation Phase 1 Heritage Impact Assessment (HIA) for the Alpine Heath Resort on the Farm Akkerman 5679 GS, Northern Drakensberg, KZN Leonie Marais-Botes 05/08/2021 - 13:30
FRASERBURG LANDBOUKOOPERASIE BPK Demolish house on site 212 and 213 Fraserburg 21/09/2018 - 11:59
Demolition of wall Demolition of wall, Woodland Hills Wildlife Estate 24/01/2020 Reinier Bronn Woodland Hills Wildlife Estate Reinier Bronn Architects & Associates CC 24/01/2020 - 14:55

Pages

CSV
 
 

Search form