FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA of Alpine Heath Resort gabion installation Phase 1 Heritage Impact Assessment (HIA) for the Alpine Heath Resort on the Farm Akkerman 5679 GS, Northern Drakensberg, KZN Leonie Marais-Botes 05/08/2021 - 13:30
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Optimum Colliery on Portion 8 of the Farm Boschmanspoort 159 IS, Hendrina, Mpumalanga AIA Phase 1 13/02/2023 Tobias Coetzee 24/04/2023 - 11:43
AIA; ARCHAEOLOGICAL EXCAVATIONS AT ERF 164, MELKBOSSTRAND ARCHAEOLOGICAL EXCAVATIONS AT ERF 164, MELKBOSSTRAND, MALMESBURY MAGISTERIAL DISTRICT, WESTERN CAPE AIA Phase 2 18/06/2010 Jayson Orton ACO Associates CC Wilmos CC 16/07/2018 - 13:09
AIA-Belvoir Aggregate Quarry II, Portion 7 of Farm Maidenhead 169, Division of Queenstown, Enoch Mgijima Local Municipality, Eastern Cape AIA Phase 1 14/08/2017 Karen Van Ryneveld isi-Xwiba Consulting cc 14/08/2017 - 09:50
Proposed Demolishing of Structures on Portion 1 and Remainder of Erf 705 on Farm Klipfontein 203, Ferndale, Randburg. Phase 1 Heritage Impact Assessment Report for the proposed demolishing of structures located on Portion 1 and Remainder of Erf 705 on the Farm Klipfontein 203 in Ferndale, Randburg, Ekurhuleni Metropolitan Municipality, Gauteng Province. HIA Phase 1 17/02/2021 Stephan Gaigher Netwater Properties (Pty) Ltd. 22/02/2021 - 10:52
PALAEONTOLOGICAL DESKTOP ASSESSMENT: PROPOSED MIRACH SOLAR PV PROJECT NEAR THABAZIMBI, LIMPOPO PROVINCE 10/10/2023 - 14:42
HIA: Target PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the 30MW Harmony Target Solar PV, Allanridge, Free State Province HIA Phase 1 22/08/2022 Jenna Lavin, Darya Presnyakova, Marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 26/08/2022 - 14:10
Madlanzini DBAR Heritage Report Cultural Heritage Impact Assessment Of The Proposed Iswepe (Madlanzi/Ermelo), Coal-Link Project, Including Substation And Powerline Alternatives, Mpumalanga Province. Heritage Impact Assessment Specialist Reports 23/01/2014 Frans Prins, Sidney Miller Sivest - Gauteng 21/04/2015 - 16:17
Dermacation of Agricultural land near Odendalsrus Free State Province INVESTIGATIONS FOR THE PROPOSED ESTABLISHMENT OF AGRICULTURAL CO-OPERATIVES ENTERPRISE (PIGGERY, POULTRY AND CROP PRODUCTION FARMING) ON FARM LANGKUIL 66, MATJHABENG LOCAL MUNICIPALITY,LUJWELEPUTSWA DISTRICT MUNICIPALITY,FREE STATE PROVINCE AIA Phase 1 31/03/2013 Eric Ndivhuho Mathoho 15/07/2013 - 16:01
Vryburg Solar 1 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province 24/07/2018 JF Durand 16/08/2018 - 15:05
Palaeontological Desktop Study Mining application by Xhariep Plant & Mining (Pty) Ltd on farms north-west of the town of Hotazel in the Northern Cape PIA Desktop 22/08/2020 JF Durand 07/09/2020 - 12:14
Mthonjaneni Bulk Water Supply HERITAGE IMPACT ASSESSMENT OF THE PROPOSED, GREATER MTHONJANENI SSA 2 BULK WATER SUPPLY PROJECT WITHIN THE MTHONJANENI LOCAL MUNICIPALITY HIA Phase 1 06/06/2014 Frans Prins Active Heritage CC ACER (Africa) Environmental Management Consultants 06/06/2014 - 08:18
R618 Widening DESKTOP HERITAGE SURVEY OF THE WIDENING OF PARTS OF THE R618, NONGOMA, KWAZULU-NATAL AIA Desktop 27/03/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management WSP Environmental Pty Ltd - Durban 12/05/2014 - 10:41
PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 488 OF LYDENBURG TOWNLANDS 31JT, PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 488 OF LYDENBURG TOWNLANDS 31JT, IN LYDENBURG, MPUMALANGA PROVINCE - APAC019/20 HIA Phase 1 12/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Philo Environmental Management 27/07/2019 - 19:32
HIA Duma Telecommunication Radio Phase 1 Cultural Heritage Impact Assessment:THE TRANSNET COAL LINK TELECOMMUNICATION PROJECT – CONSTRUCTION OF THE DUMA RS TOWER, KWACIBIGOJE REGION, KING CETSHWAYO DISTRICT MUNICIPALITY, KWAZULU-NATAL PROVINCE HIA Phase 1 31/05/2023 J van Schalkwyk 30/06/2023 - 12:45
AN AMENDED PHASE 1 HIA REPORT REPORT FOR THE LEEUWPAN COLLIERY AN AMENDED PHASE 1 HIA REPORT FOR THE LEEUWPAN COLLIERY NEAR DELMAS AND THE RECORDING AND DOCUMENTATION OF GRAVES AND GRAVE SITES THAT WILL BE IMPACTED BY EXPANDING MINING OPERATIONS AT LEEUWPAN - APAC018/77 Heritage Impact Assessment Specialist Reports 01/11/2018 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Synergistics Environmental Services 27/02/2019 - 17:52
PHA - KT PV2 (Oct 14) Palaeontological Heritage Assessment: Combined Desktop & Field-Based Study Proposed Solarreserve Kotulo Tsatsi Csp And PV Solar Energy Facilities Near Kenhardt, Northern Cape Province Palaeontological Specialist Reports John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 28/11/2016 - 09:56
Desktop PIA: Bulhoek DESKTOP PALAEONTOLOGICAL ASSESSMENT PROPOSED EXPANSION OF CHICKEN HOUSES FROM APPROXIMATELY 30 000 TO 60 000 CHICKENS, BULHOEK FARM, NEAR SWARTRUGGENS, KGETLENGRIVIER LOCAL MUNICIPALITY, BOJANA DISTRICT MUNICIPALITY, NORTHWEST PROVINCE PIA Desktop 26/01/2022 Gideon Groenewald Enviroworks 10/02/2022 - 09:09
PIA Amendment letter - Badenhorst PV3 PIA Amendment letter - Badenhorst PV3 Heritage Statement 13/10/2020 John Almond Natura Viva CC 14/10/2020 - 14:39
Jongiliziwe Sand Mining Basic assessment report Basic assessment report for Jongiliziwe mining permit application 25/02/2020 - 11:35
Palaeontological Impact Assessment for the proposed Mandlakazi bulk water supply scheme, Phase 5, Palaeontological Impact Assessment for the proposed Mandlakazi bulk water supply scheme, Phase 5, Nongoma Local Municipality, Zululand District, northern KwaZulu-Natal Palaeontological Specialist Reports 05/02/2018 Gary Trower Gary Trower Enviroedge 05/10/2018 - 12:21
HIA: PROPOSED THE HILLS OUTFALL SEWER, CITY OF TSHWANE, GAUTENG PROVINCE PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED THE HILLS OUTFALL SEWER, CITY OF TSHWANE, GAUTENG PROVINCE HIA Phase 1 21/07/2014 Anton van Vollenhoven Archaetnos CC Bokamoso Environmental Consultants 22/06/2016 - 15:49
Ntuzuma C WWR LETTER OF EXEMPTION FOR THE PROPOSED NTUZUMA C WATER RETICULATION PROJECT HIA Letter of Exemption 01/02/2018 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management JG AFRIKA 07/02/2018 - 10:25
Heritage Impact Assessment - FBAR Fronteer App I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 28/07/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 29/07/2021 - 10:14
PIA Renosterberg PV and Wind Palaeontological specialist assessment: desktop study PROPOSED RENOSTERBERG SOLAR PV AND WIND ENERGY FACILITIES NEAR DE AAR, NORTHERN CAPE PROVINCE PIA Desktop 01/09/2012 John E Almond Natura Viva CC Sivest - Gauteng 28/11/2012 - 09:18
HIA: Ruspoort 1 PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the PROPOSED RUSPOORT 1 SOLAR PV FACILITY NEAR PETRUSVILLE, DE AAR & PHILLIPSTOWN IN THE NORTHERN CAPE HIA Phase 1 24/04/2023 Jenna Lavin, Nicholas Wiltshire, Kimberley Chapelle CTS Heritage Savannah Environmental (Pty) Ltd 05/06/2023 - 10:44
Amended - St Anne's Convent, Umzinto Revision of Erven and proposed land use Proposed Subdivision of the Remainder of Erf 328 Umzinto Umdoni Local Municipality, Ugu DM, KwaZulu-Natal Built Environment and Cultural Landscapes 28/02/2018 Len van Schalkwyk eThembeni Cultural Heritage 02/03/2018 - 03:23
Phase 1 Archaeological Impact Assessment - Kolumela Mine Report on a Phase 1 Archaeological Impact Assessment of proposed mining areas on the farms Ploegfontein, Klipbankfontein, Welgevonden, Leeuwfontein, Wolhaarkop and Kapstevel, west of Postmasburg, Northern Cape. AIA Phase 1 01/08/2005 David Morris McGregor Museum Sishen Iron Ore Company (Pty) Ltd 18/02/2013 - 17:09
Phase 1 HIA of new road at Blaauwskop, near Upington Phase 1 Heritage Impact Assessment of a proposed new road at Blaauwskop near Upington, NC Province HIA Phase 1 29/07/2013 Lloyd Rossouw MDA Town and Regional Planners 09/10/2013 - 13:18
GPR-Dodoma Place (Kennedy Road) Housing Project, Durban, KZN Ground Penetrating Radar (GPR) Heritage Assessment - Dodoma Place (Kennedy Road) Housing Project, Erven 402-407 Springfield, Durban, Ethekwini Metropolitan Municipality, KwaZulu-Natal. Ethekwini MM-HSU: PQ No. 7H-17381 / SAHRIS CaseID 4969 / AMAFA Ref: SAH14/4969 Burial Grounds and Graves Specialist Reports 08/12/2015 Barry Barnardt, Karen Van Ryneveld, Duane Fourie eThekwini Department of Human Settlements 08/12/2015 - 10:23
PPC Dwaalboom Waste Tyre Storage Areas Phase 1 Heritage Assessment A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW TYRE STORAGE FACILITY AT PPC DWAALBOOM NORTHWEST OF NORTHAM, LIMPOPO PROVINCE Heritage Impact Assessment Specialist Reports 24/03/2022 Anton Pelser 29/07/2022 - 07:47
Archaeological Scoping Report For The Proposed Witwatersrand Gold Fields: Acid Mine Drainage (Phase 1): Eastern Basin, Gauteng Archaeological Scoping Report For The Proposed Witwatersrand Gold Fields: Acid Mine Drainage (Phase 1): Eastern Basin, Gauteng AIA Desktop 20/02/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting AECOM SA - Head Office 13/03/2014 - 10:47
PIA Astral Organic Composting Facility Palaeontological Impact Assessment: Astral Organic Composting Facility PIA Desktop 23/11/2019 Dr. Heidi Fourie Dr Heidi Fourie Dr Heidi Fourie 06/05/2021 - 15:00
HIA for Modikwa Platinum Mine (MPM) Heritage Impact Assessment for Modikwa Platinum Mine, Doornbosch 521501. Heritage Impact Assessment Specialist Reports 21/02/2018 Lysette Rothmann-Guest Archaetnos Culture & Cultural Resource Consultants SRK Consulting (Pty) Ltd - Johannesburg 27/11/2019 - 15:59
HDRB Heritage Report Heritage Impact Assessment: For the proposed construction of the 2km long Holsdam Barkly River Farmers 11kV powerline Heritage Impact Assessment Specialist Reports 03/11/2022 Jaco van der Walt 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 03/11/2022 - 16:04
De Groote Zalze farm, Stellenbosch: Historical survey of the owners: Report 2 De Groote Zalze farm, Stellenbosch: Historical survey of the owners: Report 2 AIA Phase 1 01/01/2004 Hennie Vos ArCape 16/06/2012 - 08:54
Heritage Report 1993 Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. HIA Phase 1 01/01/2014 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 08/05/2017 - 12:41
AIA - CastleWEF Oct14 Archaeological Impact Assessment Report for the Proposed Castle Wind Energy Facility, De Aar, Northern Cape Archaeological Specialist Reports 30/10/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 01/12/2014 - 16:43
Slipper Bay - Archaeological Test Excavations: Erven 55 and 462 St Helena Bay, Vredenburg Magisterial District, Western Cape Slipper Bay - Archaeological Test Excavations: Erven 55 and 462 St Helena Bay, Vredenburg Magisterial District, Western Cape Archaeological Permit Report 01/01/2007 Mary Patrick, Andrew B Smith, Belinda Mutti Cape Archaeological Survey CC 16/06/2012 - 14:33
REPORT 01915V GRAVE ASSESSMENT BRMO A REPORT ON THE ASSESSMENT OF A POSSIBLE GRAVE AT THE BLACK ROCK MINING OPERATIONS, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 10/04/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 23/05/2019 - 09:13
HEUNINGKRANZ PROJECT - ARCHAEOLOGICAL ASSESSMENT PHASE 1 AIA REPORT ON ARCHAEOLOGICAL CONTEXT AND HERITAGE RESOURCES ON THE FARMS HEUNINGKRANZ 364 AND LANGVERWACHT 432 IN POSTMASBURG, NORTHERN CAPE AIA Phase 1 01/01/2015 Udo Kusel EXM Advisory Services (Pty) Ltd 29/05/2018 - 14:50
AIA FOR THE PROPOSED RAPHUTI INFORMAL SETTLEMENT PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTIONS OF THE FARM WEIKRANS 539KQ FOR THE PROPOSED RAPHUTI INFORMAL SETTLEMENT PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 23/02/2021 Neels Kruger Exigo Sustainability Kantey & Templer Consulting Engineers 25/10/2021 - 12:00
Heritage Impact Assessment of Remainder of the farm Cecilia 2352 Phase 1 Heritage Impact Assessment of Remainder of the farm Cecilia 2352 and farm Bloemfontein 654, Bloemfontein, FS Province. Heritage Impact Assessment Specialist Reports 19/11/2014 Paleo Field Services Mangaung Metropolitan Municipality 18/11/2015 - 06:46
Solaire APIA Desktop Heritage Assessment of the Solaire Direct Solar Photovoltaic Facility of 10MW near Reddersburg, Free State Province AIA Desktop 16/05/2012 Lloyd Rossouw Council for Scientific and Industrial Research 23/07/2012 - 15:54
HIA-LethaboSolar Desktop Palaeontological Heritage Impact Assessment Report on the Site of a Proposed Power Production Facility (The Lethabo Solar Energy Facility) to be Located on Farm 1814, Free State Province Palaeontological Specialist Reports 27/11/2014 Barry Millsteed BM Geological Services Savannah Environmental (Pty) Ltd 17/03/2015 - 14:23
Motivation for Full Phase 1 HIA Exemption for Weltevredenpark Extension 4 - Erven 710 and 711 MOTIVATION FOR FULL PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) EXEMPTION FOR THE ERVEN 710 & 711 WELTEVREDENPARK EXTENSION 4 HOUSING DEVELOPMENT WITHIN THE JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Letter of Exemption 03/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING K2M Environmental 11/11/2020 - 14:44
PHASE 1ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED 5, 5 KILOMETERS TWEEDRACHT 88kV POWER LINE PHASE 1ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED 5, 5 KILOMETERS TWEEDRACHT 88kV POWER LINE ESTABLISHMENT ON PORTION 17 OF FARM KLIEN ZONDERHOUT WITHIN CITY OF TSHWANE METROPOLITAN MUNICIPALITY GAUTENG PROVINCE HIA Phase 1 27/05/2016 Eric Ndivhuho Mathoho Vhufa Hashu Heritage Consultants Nsovo Environmental Consulting 18/01/2017 - 14:36
Mafube Coal Mine Grave Relocation FINAL REPORT ON THE ASSESSMENT OF NEW GRAVE SITES THAT COULD BE POTENTIALLY IMPACTED ON BY THE MAFUBE COAL MINING OPERATIONS (ANGLO-AMERICAN THERMAL COAL), SITUATED ON PORTIONS OF SPRINGBOKLAAGTE 416JS, KLEINFONTEIN 432JS & ELANDSFONTEIN 433JS NEAR MIDDELBURG, MPUMALANGA. Burial Grounds and Graves Specialist Reports 26/05/2017 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Mafube Coal Mining (Pty) Ltd 06/06/2022 - 17:56
Heritage Screener: Claire PV i and II Desktop Heritage Screening Assessment for the Proposed development of Claire PV 1 and Claire PV 2 in Clayville, Gauteng HIA Letter of Exemption 23/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 30/06/2022 - 08:18
PIA report Beatrix DF-SMF 11kV powerline Palaeontological Impact Assessment for the proposed DF‐SMF 11kV overhead powerline interconnector, Theunissen, Free State Province PIA Phase 2 11/10/2021 Marion Bamford 1World Consultants (Pty) Ltd Eskom - FSOU 20/12/2021 - 14:27

Pages

CSV
 
 

Search form