FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Weltevreden 386JS Phase 1 Archaeological/Heritage Impact Assessment for proposed residential township: extention 7 of portion 5 (a portion of portion 2) of the farm Weltevreden 386 JS, Belfast AIA Phase 1 01/02/2012 Christine Van Wyk Rowe Adansonia Heritage Consultants Wandima Environmental Services cc 17/10/2012 - 14:51
Archaeological Impact Assessment for Thaba Mine Archaeological Impact Assessment for the proposed additional underground and opencast mining, associated infrastructure and processing facilities at Thaba Cronimet Chrome Mine, Limpopo Province. Archaeological Specialist Reports 26/02/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Worley Parsons RSA (Pty) Ltd 07/09/2023 - 13:54
Klip-Kruisfontein A CULTURAL HERITAGE MANAGEMENT PLAN FOR THE KLIP-KRUISFONTEIN RESORT, CITY OF TSHWANE Conservation Management Plan 25/11/2013 Anton van Vollenhoven Archaetnos CC City of Tshwane - Environmental Management Department 06/01/2014 - 10:43
Desktop HIA Report Moa Solar Plant DESKTOP STUDY FOR THE PROPOSED MOA CONSTRUCTION CC SOLAR PLANT ON FARM RIETPUTS 15 NEAR WINDSORTON, NORTHERN CAPE PROVINCE, SOUTH AFRICA. AIA Desktop 01/12/2022 Ndivhuho Eric Mathoho Millenium Heritage Group (Pty) Ltd 30/01/2023 - 14:39
Eureka Building Heritage Report Submission Refurbishment, Alterations and Demolitions to Eureka Building on Stand 32 Theta Township, Johannesburg - Heritage Report Submission Heritage Impact Assessment Specialist Reports 30/08/2017 Rudd van Deventer De Beers Consolidated Mines (Pty) Ltd 30/08/2017 - 11:31
Basic Heritage Impact Assessment A BASIC HERITAGE IMPACT ASSESSMENT REPORT FOR THE LAKEVIEW FLOODLINE CONFINEMENT AND WATER USE LICENCE APPLICATION, CONSTANTIA KLOOF, ROODEPOORT HIA Phase 1 31/01/2013 Anton Pelser A Pelser Archaeological Consulting 05/02/2013 - 12:15
Heritage Report - Boundary Solar Energy Facility Proposed Boundary Solar Energy Facility on the farm Karreeboom 1716, east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input Heritage Scoping 06/09/2013 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 10/09/2013 - 09:03
PHASE I HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON A PORTION OF FARM 393, BARKLY WEST DISTRICT, NORTHERN CAPE PROVINCE PHASE I HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON A PORTION OF FARM 393, BARKLY WEST DISTRICT, NORTHERN CAPE PROVINCE. This report provides a heritage impact evaluation in terms of Section 38 of the National Heritage Resources Act (25 of 1999) in respect of an application by Sedibeng Mines (JV) for prospecting and mining rights on a Portion of the Farm 393, Barkly West District, Northern Cape. The report is based on a scoping ground survey and understanding of the significance and heritage attributes of the cultural heritage resources found on the property and recommends an overall approach to the conservation of the resources. HIA Phase 1 10/05/2017 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Archaeological and Heritage Services Africa (Pty) Ltd 11/05/2017 - 11:10
Leslie 2 - Heritage Impact Assessment Leslie 2 - Heritage Impact Assessment HIA Phase 1 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Shangoni Management Services 03/02/2017 - 14:46
Monitoring Report: 132kv Electricity Cables from Foreshore Switching Station to New Green Point Stadium A REPORT ON THE ARCHAEOLOGICAL MONITORING OF THE LAYING OF THE 132 KV ELECTRICITY CABLES FROM THE FORESHORE SWITCHING STATION TO THE NEW GREEN POINT STADIUM Archaeological Monitoring 01/11/2009 Dave Halkett ACO Associates CC Jeffares & Green - Cape Town 24/07/2017 - 14:23
R22 HIA and Desktop PIA Heritage Survey of the Proposed R22 Deviation, Hluhluwe, KZN Heritage Impact Assessment Specialist Reports 09/03/2017 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management SANRAL 20/03/2018 - 12:21
213 ZK MATTHEWS AMAFA REPORT 213 ZK MATTHEWS AMAFA REPORT Visual Impact Assessment 19/10/2023 19/10/2023 - 19:40
Vaalbult Palaeontological Monitoring Report PALAEONTOLOGICAL MONITORING REPORT ON THE COLLIERY PIT AND WASTE ROCK STOCKPILES (VAALBULT COLLIERY) LOCATED ON THE FARM VAALBULT 31T, MPUMALANGA PROVINCE Palaeontological Monitoring 10/02/2017 Barry Millsteed BM Geological Services Vaalbult Mining Company (Pty) Ltd 12/04/2017 - 11:07
HIA; Borrow Pit - OP4963, Albertinia Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along OP 4963 Near Albertinia in the Eden District Municipality, Western Cape. HIA Phase 1 29/10/2012 Madelon Tusenius Vidamemoria Heritage Consultants Aurecon South Africa (Pty) Ltd 21/05/2018 - 09:41
Kwaggasrand Desktop PIA PIA Desktop Gideon Groenewald New GX Enviro Solutions and Logistics 16/09/2015 - 08:51
Verref-Rietfontein Landfill Site DEAIR DEIAR FOR THE PROPOSED NEW TONK METER ROAD GLB+ / CLASS B WASTE DISPOSAL FACILITY AT RIETFONTEIN, SPRINGS 08/04/2013 13/06/2013 - 12:16
Phase 1 PIA: MACENGENI TO MACIJO ROAD PROPOSED DEVELOPMENT OF MACENGENI TO MACIJO ROAD, KWAZULU/NATAL : SCOPING REPORT PALAEONTOLOGY PIA Phase 1 09/11/2015 JF Durand G&A Heritage Management Consultants Nzingwe Consultancy 19/11/2015 - 08:53
PIA - Merensky-Uchoba 132kV Deviation Palaeontological Impact Assessment for the proposed Merensky-Uchoba 132kV powerline deviation, Limpopo Province PIA Phase 1 11/01/2023 Prof Marion Bamford 29/03/2023 - 15:40
HIA_Ptn 29 of Farm Goedehoop 308 Cultural Heritage Resources Impact Assessment for Portion 29 of the Farm Goedehoop 308 IR, Govan Mbeki Local Municipality, Mpumalanga HIA Phase 1 07/09/2011 Udo Kusel African Heritage Consultants CC Thallos Environmental Consulting 25/04/2013 - 12:12
greenfields HIA desktop HIA DESKTOP STUDY FOR THE FARM GREENFIELDS, MOOI RIVER, KZN Heritage Impact Assessment Specialist Reports 10/12/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Enviroheart Consulting Pty (Ltd) 04/02/2022 - 09:15
Cultural Heritage Statement for the proposed Witfield Stormwater Network CULTURAL HERITAGE STATEMENT FOR THE PROPOSED WITFIELD STORMWATER NETWORK, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE Heritage Statement 28/06/2016 Johnny Van Schalkwyk 04/07/2016 - 11:42
PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR GEMSTONE, COBALT, LEAD, GOLD, COPPER, NICKEL, SILVER AND ZINC ORE ON THE REMAINING EXTENT AND PORTION 1 OF THE FARM MAMAGHODI 654, MAGISTERIAL DISTRICT OF POSTM PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR GEMSTONE, COBALT, LEAD, GOLD, COPPER, NICKEL, SILVER AND ZINC ORE ON THE REMAINING EXTENT AND PORTION 1 OF THE FARM MAMAGHODI 654, MAGISTERIAL DISTRICT OF POSTMASBURG IN NORTHERN CAPE PROVINCE. HIA Phase 1 Trust Mlilo 18/05/2023 - 15:51
Wonderfontein Road Diversion Attached a Heritage Report on the full Mining Right extent. The application is for a road diversion which is on this Mining Right Area, so we please refer you to the Heritage Section in the draft EIA for further information HIA Phase 1 02/03/2008 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Zyntha Consulting (Pty) Ltd 18/03/2020 - 13:34
Tafelkop 1154 Petrusburg FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT TAFELKOP 1154, (PETRUSBURG), BLOEMFONTEIN DISTRICT Heritage Impact Assessment Specialist Reports 17/07/2014 Cobus Dreyer De Beers Consolidated Mines (Pty) Ltd De Beers Consolidated Mines (Pty) Ltd 18/09/2014 - 22:12
Phase 1 PIA for the Turfvlakte Open Pit Project Proposed Turfvlakte Open Pit Mining near Lephalale, Limpopo Province - Palaeontological Impact Assessment: Phase 1 Field Study PIA Phase 1 27/02/2018 Dr. Heidi Fourie Dr Heidi Fourie Golder Associates Africa (Pty) Ltd 22/01/2020 - 14:55
HIA for Mpophomeni Shopping Centre Heritage Impact Assessment Mpophomeni Shopping Centre Heritage Impact Assessment Specialist Reports 09/01/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Umlando: Archaeological Surveys & Heritage Management 09/01/2015 - 09:06
HIA Paleso PL Heritage Impact Assessment Report Paleso Power Line 07/01/2022 - 08:35
SUN4642 - CMP The Sun City Resort Complex Heritage Conservation Management Plan Project 2019 - 2024 Conservation Management Plan 27/06/2019 Justin du Piesanie Digby Wells Environmental Sun International (Pty) Ltd 27/06/2019 - 10:13
PALAEONTOLOGICAL FIELD ASSESSMENT PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL & GENERAL) BETWEEN DOUGLAS AND PRIESKA ON PORTION 12, REMAINING EXTENT OF PORTION 29 (PORTION OF PORTION 13) AND PORTION 31 (PORTION OF PORTION 29) ON THE FARM READS DRIFT 74, REGISTRATION DIVISION; HERBERT, NORTHERN CAPE PROVINCE PIA Phase 1 20/09/2020 Banzai Environmental (Pty) Ltd 02/11/2020 - 08:41
Heritage Impact Assessment HIA FOR THE PROPOSED MANDENI CEMETERY Heritage Impact Assessment Specialist Reports 18/06/2023 Gavin Anderson Umlando: Archaeological Surveys and Heritage Management Umlando 27/06/2023 - 08:58
Application for Exemption: Raw Water Pipeline: Medupi Power Station Application for Exemption from further Heritage Mitigation Raw Water Pipeline at Medupi Power Station Lephalale Municipality, Waterberg District, Limpopo Province HIA Letter of Exemption 22/04/2019 Len van Schalkwyk eThembeni Cultural Heritage WSP Environmental Pty Ltd - Johannesburg 07/05/2019 - 14:30
Exxaro_Belfast_BGGC_report Exxaro Relocation Project Burial Grounds and Graves Project BGG Phase 1 11/11/2015 Johan Nel Digby Wells Environmental Exxaro Resources 15/04/2016 - 12:14
Umqeku river bridge HIA desktop DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: HIA Letter of Exemption 22/09/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Jeffares & Green - Pietermaritzburg 27/10/2016 - 15:08
Bhobhoyi-Umzimkhulu Water Pipeline PDA PALAEONTOLOGICAL DESKTOP ASSESSMENT - UMZIMKHULU RIVER PIPELINE PROJECT NEAR PORT SHEPSTONE, IN KWAZULU-NATAL PIA Desktop Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 17/08/2023 - 12:34
Springhaas LiLo 2 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed LiLo Connection from Springhaas Collector Substation B to the Beta/ Delphi 400kV Overhead Line, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:29
Application for Exemption from a Phase 1 Heritage Impact Assessment Application for Exemption from a Phase 1 Heritage Impact Assessment of REM of ERF 1740 Kloof at 1 Everton Road, Kloof, Outer West Municipality, eThekwini, KwaZulu-Natal., KwaZulu-Natal, South Africa HIA Letter of Exemption 07/04/2014 Len van Schalkwyk 07/04/2014 - 12:29
Heritage Impact Assessment for Henley Booysen Phase 1 Heritage Impact Assessment report on the farm Eureka 200 near Kimberley, Frances Baard District Municipality, Northern Cape Province. HIA Phase 1 04/04/2019 Peter Beaumont EnviroServ 04/03/2019 - 12:36
RE Capital 3C BESS Amendment Heritage Statement Heritage Statement David Morris Archaeology department, McGreggor Museum Cape Environmental Assessment Practitioners 04/07/2021 - 14:36
Mandeni Local Municipality - Hlomendlini Existing Road Upgrade Mandeni Local Municipality - Hlomendlini Existing Road Upgrade AIA Desktop 29/02/2016 Frans Prins Active Heritage CC Active Heritage CC 29/02/2016 - 13:58
Heritage Scoping Report Greytown Housing Development Heritage Scoping Report Greytown Housing Development Umvoti Local Municipality, uMzinyathi DM KwaZulu Natal Heritage Scoping 14/11/2021 Len van Schalkwyk eThembeni Cultural Heritage uMshwati Local Municipality 25/11/2021 - 11:53
Drimolen annual report 2014 Drimolen Hominin Site – Annual Report to SAHRA (July 2014) Archaeological Permit Report 16/06/2014 Colin Menter, Stephanie Baker, Thea de Wet 16/06/2014 - 15:45
HIA for proposed Richtersveld Sunspot Solar Energy Power Plant Heritage Impact Assessment for proposed Richtersveld Sunspot Solar Energy Power Plant, at Portion 10 (Arris) of Farm 2 Korridor Wes, Namakwaland, Northern Cape. HIA Phase 1 02/02/2015 Stephen Townsend Richtersveld Sunspot (Pty) Ltd. 17/03/2015 - 11:18
HIA: Fountain PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the Fountain Solar PV1 Facility near De Aar, Northern Cape Province HIA Phase 1 01/08/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 15/08/2022 - 09:34
AIA[P1]-Galatyeni Substation, Mbizana, Eastern Cape Phase 1 Archaeological Impact Assessment - Proposed Construction of the Galatyeni Substation, 132kV Loop In / Out Lines and Overhead Lines, near Flagstaff, Mbizana Local Municipality, Eastern Cape, South Africa AIA Phase 1 24/05/2015 Karen Van Ryneveld 24/05/2015 - 03:05
Springhaas Line 5 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 6 To Collector Substation B Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:44
Britstown MTN Tower Project PIA & HIA 08/01/2019 - 14:49
DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED ELECTRISURV CC BENEFICIATION PLANT DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED ELECTRISURV CC BENEFICIATION PLANT 15/10/2020 Obakeng Malete Kwadiwa Africa (Pty) Ltd 15/10/2020 - 10:01
PIA Farm Wolfberg 187 PALAEONTOLOGICAL IMPACT ASSESSMENT MINING RIGHT APPLICATION FOR THE FARM WOLFBERG 187 BY KASIMIRA TRADING 82 (PTY) LTD NAMA KHOI MUNICIPALITY, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE PIA Phase 1 03/12/2019 John Pether ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 13/10/2021 - 16:59
Paarde Valley PV2 OHPL Palaeontological Impact Assessment PALAEONTOLOGICAL IMPACT ASSESSMENT PAARDE VALLEY PV2 GRID CONNECTION TO VETLAAGTE MAIN TRANSMISSION SUBSTATION (MTS) Palaeontological Specialist Reports 30/06/2022 Elize Butler Banzai Environmental (Pty) Ltd Holland & Associates Environmental Consultants 12/07/2022 - 15:17
Desktop PIA ALTINA 120 MW SOLAR PHOTOVOLTAIC PROJECT NEAR ORKNEY IN THE FREE STATE Desktop PIA: ALTINA 120 MW SOLAR PHOTOVOLTAIC PROJECT NEAR ORKNEY IN THE FREE STATE PIA Desktop 25/10/2022 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 11/11/2022 - 09:48

Pages

CSV
 
 

Search form