THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1 - 50 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Bushbuckridge, Rolle | Phase 1 Archaeological Survey on the farm Rolle 235 KU in Bushbuckridge Municipal area, Mpumalanga Province. | AIA Phase 1 | 29/06/2015 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | 23/10/2015 - 12:14 |
D168 Heritage Report | First phase heritage impact assessment of the proposed upgrade of district road D168 near Highflats, Kwazulu-Natal. | HIA Phase 1 | 06/07/2016 | Frans Prins | Active Heritage CC | Brousse-James & Associates | 12/10/2016 - 16:53 |
Phase 1 AIA Report on Portion 148 of Portion 59 (Vrysoutpan) | Phase 1 AIA Report on Portion 148 of Portion 59 (Vrysoutpan) of the farm Kalahari Wes 251 near Askham, Siyanda District Municipality, Northern Cape Province | AIA Phase 1 | 02/08/2010 | Peter Beaumont | McGregor Museum | Suid Afrikaanse Soutwerke (Edms) Bpk | 21/11/2016 - 12:48 |
HIA | UPGRADE OF DISTRICT ROAD D1252 SITUATED IN WARDS 3 & 4 OF IMBAMBAZA LOCAL MUNICIPALITY, KWAZULU-NATAL- Phase 1 Heritage Impact Assessment | HIA Phase 1 | 29/07/2019 | Jean Beater | JLB Consulting | Afzelia Environmental Consultants Pty Ltd | 12/09/2019 - 12:26 |
Heritage Impact assessment | Mooi Mgeni transfer Scheme, Phase 2 KZN | Heritage Impact Assessment Specialist Reports | 25/07/2012 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - Grahamstown | 02/05/2013 - 10:07 |
Mpungose WSS HIA | A First Phase cultural heritage impact assessment of the proposed Mpungose WSS, Near Eshowe, KwaZulu-Natal | HIA Phase 1 | 15/10/2019 | Frans Prins | Active Heritage CC | EnviroPro | 12/12/2019 - 10:42 |
District Six (HIA) | District Six Heritage Impact Assessment (HIA) Draft Document | HIA Phase 1 | 01/03/2003 | Lucien le Grange, Architects & Urban Planner | 15/03/2021 - 11:43 | ||
De Aar PIA Report | PALAEONTOLOGICAL HERITAGE REPORT: COMBINED DESKTOP & FIELD-BASED ASSESSMENT | PIA Desktop | 01/02/2021 | John E Almond | 06/09/2022 - 09:33 | ||
Dermacation of Agricultural land near Odendalsrus Free State Province | INVESTIGATIONS FOR THE PROPOSED ESTABLISHMENT OF AGRICULTURAL CO-OPERATIVES ENTERPRISE (PIGGERY, POULTRY AND CROP PRODUCTION FARMING) ON FARM LANGKUIL 66, MATJHABENG LOCAL MUNICIPALITY,LUJWELEPUTSWA DISTRICT MUNICIPALITY,FREE STATE PROVINCE | AIA Phase 1 | 31/03/2013 | Eric Ndivhuho Mathoho | 15/07/2013 - 16:01 | ||
Paleo - IPP Thabametsi | Full Palaeontological Heritage Impact Assessment Report on the Site of the Proposed New Thabametsi Power Station and Three Associated Alternative Power Line Routes, Near Lephalale, Limpopo Province | Palaeontological Specialist Reports | 09/07/2014 | Barry Millsteed | BM Geological Services | Savannah Environmental (Pty) Ltd | 11/07/2014 - 14:10 |
Heritage Impact Assessment- Akanani Mining | A Phase I Heritage Impact Assessment (HIA) Study for the proposed Akanani Mining (Pty) Ltd project near Mokopane in the Limpopo Province | HIA Phase 1 | 01/03/2020 | Dr Julius CC Pistorius | 11/05/2021 - 15:40 | ||
Roodepoort Clay Quarry Heritage Impact Assessment | BECS - KwaMhlanga - Roodepoort Clay Quarry_Phase 1 AIA_v1 | AIA Phase 1 | 28/07/2023 | 31/07/2023 - 10:35 | |||
HIA 250 000m3 Loskop Dam, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF THE 250 00 mᵌ DAM, ON THE FARM DRANKENSBERG LOCATION NO. 9605, NEAR LOSKOP. FOR THE AUTHORISED BHEKUZULU-EMPANGENI WATER SUPPLY SCHEME, LOCATED NEAR WINTERTON, UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 21/04/2017 - 14:30 | |
Environmental Management Plan | Conservation Assessment | 11/10/2014 | 11/10/2014 - 07:53 | ||||
HIA: Mooikloof Filling Station | Heritage Impact Assessment for the Proposed Development of the Mooikloof Filling Station and Associated Infrastructure on Portion 1 on the Remainder of Portion 672 of the Farm Rietfontein 375-JR, within the City of Tshwane Metropolitan Municipality, Gauteng Province. | HIA Phase 1 | 15/03/2017 | Stephan Gaigher | G&A Heritage Management Consultants | LEAP - Lanscape Architect Environmental Planner | 19/06/2017 - 14:37 |
HIA; Expansion of Existing Borrow Pit, DR01380, Robertson | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR01380 Approximately 16.5 km west north west of Robertson in Cape Winelands District Municipality, Western Cape | HIA Phase 1 | 29/08/2012 | Quahnita Samie | Vidamemoria Heritage Consultants, Natura Viva CC | Nadeson Consulting Services | 25/06/2018 - 09:01 |
Heritage Statement: Robben Island Museum | Heritage Statement: Robben Island Museum A new visitors Experience | Heritage Statement | 01/04/2018 | Millennium Heritage Group | Zanenza Consulting | 27/08/2018 - 09:26 | |
Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 | Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 Pluto Substation to Westgate Substation, Gauteng Province | PIA Phase 2 | 11/09/2021 | Marion Bamford | AHSA | AHSA | 17/09/2021 - 11:56 |
PIA Report | Palaeontological Specialist Reports | 07/04/2020 | 07/04/2020 - 11:05 | ||||
HIA - PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE | HERITAGE IMPACT ASSESSMENT: PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE NEAR DEALESVILLE, BOSHOF MAGISTERIAL DISTRICT, FREE STATE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999) as part of a Heritage Impact Assessment. | Archaeological Specialist Reports | 09/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 23/11/2021 - 10:47 |
Phase 1 AIA Klei Minerale Prospecting | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Klei Minerale (Pty) Ltd Prospecting on Several Portions of the Farm Boekenhoutkloof 315 JR, Pretoria, Gauteng | AIA Phase 1 | 28/01/2022 | Tobias Coetzee | Tobias Coetzee | 27/10/2022 - 21:22 | |
AIA Styldrift 132kV Power Line | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT INVESTIGATIONS FOR THE PROPOSED ESTABLISHMENT OF 132KV POWER LINE TURN OFF TO STYLDRIFT SUBSTATION WITH IN THE JURISDICTION OF MOSES KOTANE LOCAL MUNICIPALITY, BOJANALA PLATINUM DISTRICT, NORTH WEST PROVINCE | AIA Phase 1 | 01/02/2012 | Eric Ndivhuho Mathoho | Vhufa Hashu Heritage Consultants | 11/06/2012 - 09:42 | |
HIA Orania plot A100 2013 | First phase archaeological and cultural heritage assessment of the proposed residential development on plot A100, Orania, Northern Cape | HIA Phase 1 | 01/08/2013 | H Opperman | C & C Eiendoms Trust | 17/09/2013 - 09:39 | |
Amended BOSA Palaeontological specialist assessment: desktop study | PROPOSED BOTSWANA-SOUTH AFRICA (BOSA) TRANSMISSION INTERCONNECTION PROJECT: SOUTH AFRICAN SECTOR, NORTH WEST PROVINCE | PIA Desktop | 10/08/2018 | John E. Almond | Natura Viva CC | Aurecon South Africa (Pty) Ltd | 17/08/2020 - 12:11 |
PIA EIA Phase | PALAEONTOLOGICAL FIELD ASSESSMENT FOR THE PROPOSED ENVIRONMENTAL AUTHORISATION AND AMENDMENT PROCESSES FOR ELANDSFONTEIN COLLIERY, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | Palaeontological Specialist Reports | 17/11/2020 | Elize Butler | PGS Heritage (Pty) Ltd, Banzai Environmental (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 06/07/2021 - 11:09 |
Glenwood South East Sector Housing Development HIA | Phase 1 Heritage Impact Assessment Report for the Glenwood South East Sector Housing Development | HIA Phase 1 | 30/03/2022 | Jean Beater | JLB Consulting | SPHE Consulting Services | 12/12/2022 - 13:31 |
Addendum: Heritage for Block 11B/12B | Addendum: Cultural Heritage Impact Assessment Baseline Report Block 11B/12B Baseline findings from Camps Bay to Oyster Bay, Western and Eastern Cape Province | HIA Phase 1 | 01/08/2023 | Prof MJR Boswell | Prof. MJR. Boswell | WSP Group Africa (Pty) Ltd | 24/09/2023 - 15:42 |
Integrated Heritage Impact Assessment for Humansrus PV Energy Facility 2 (RE Capital 14 Solar Development) | Integrated Heritage Impact in terms of Section 38(8) of the National Heritage Resources Act, 1999 (ACT 25 of 1999): Proposed Development of Humansrus Solar PV Energy Facility 2 (previously named RE Capital 14 Solar Development) on a portion of the Farm Humansrus 147/ Remainder, Prieska District, Northern Cape. | HIA Phase 1 | 30/11/2014 | Stefan de Kock | Perception Heritage Planning | Humansrus Solar PV Energy Facility 2 (Pty) Ltd. | 03/02/2015 - 15:43 |
HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS | HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS NO 14762, GREYTOWN ROAD, KWAZULU-NATAL, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 16/07/2018 | eThembeni Cultural Heritage | 26/08/2021 - 09:38 | ||
Boschendal Hydroelectric Facility and Dam Expansion | Boschendal Hydroelectric Facility and Dam Expansion | 12/01/2016 | Mariagrazia Galimberti, Kyla Bluff | CTS Heritage | EOH Coastal & Environmental Services (CES) - Cape Town | 03/03/2016 - 20:54 | |
P230 Culvert Replacement | Phase 1 HIA and Desktop PIA for P230 Road Rehab - Addendum to cBAR | HIA Phase 1 | 15/08/2017 | Frans Prins, Gideon Groenewald | Royal Haskoning DHV | 15/08/2017 - 12:11 | |
PIA Trompsburg, Free State | Palaeontological Desktop Evaluation of two borrow pits near Trompsburg, Kapanong Local Municipality, FS Province. | PIA Phase 1 | 20/02/2014 | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 03/04/2015 - 18:36 | ||
Walkerville Village Mews HIA | Letter of Exemption for Full HIA & Short Report: Proposed Walkerville Estate/ Walkerville Mews on Part of the Remainder of Portion 174 (of Portion 29) of the Farm Faraosfontein 372IQ, near Walkerville, GAUTENG | HIA Phase 1 | 11/03/2016 | Anton Pelser | Walkerville Village Mews | EnviroSynergy Consulting (Pty) Ltd | 18/05/2016 - 11:47 |
HIA for the Proposed Borrow Pit 4A associated with the N11-13X, Mokopane Ring Road, Mogalakwena Local Municipality, Limpopo Province | PHASE 1 HERITAGE RESOURCES SCOPING REPORT PROPOSED ESTABLISHMENT OF A BORROW PIT (4a), TO SURFACE NEW N11 ON THE FARM TWEEFONTEIN 238 KR PORTION 2, MOKOPANE, LIMPOPO | HIA Phase 1 | 31/03/2017 | Frans Roodt, Liesl Stegmann | Shasa Heritage Consultants CC | Royal Haskoning DHV | 07/11/2017 - 10:13 |
Ilanga Lethemba Heritage Impact Assessment Report | Ilanga Lethemba PV Solar Energy Facility | Heritage Impact Assessment Specialist Reports | 12/09/2011 | David Morris | Solar Capital | 16/11/2018 - 00:30 | |
Heritage Impact Assessment for Kimswa Mining (Pty) Ltd | Phase 1 Heritage Impact Assessment (Including Palaeontological Assessment) Requested in terms of Sectoin 38 of the National Heritage Resources Act (No 25/1999) for a mining permit on a piece of state land at Gong Gong on the Northern Bank of the Vaal River in the magisterial district of barkly west, northern cape province. | HIA Phase 1 | 27/03/2019 | Edward Matenga | AHSA | 27/02/2019 - 12:48 | |
1458_PIA Mokala | Palaeontological Impact Assessment for the proposed Amendment for Mokala Manganese Mine, Hotazel, Northern Cape Province | PIA Phase 1 | 25/05/2021 | Marion Bamford | HCAC Heritage Consultants | Mokala Mining PTY Ltd | 22/02/2022 - 13:29 |
BRT Paul Kruger Street | Cultural Heritage Resources Impact Assessment for Proposed Rapid Bus Service, Paul Kruger Street, Pretoria, Tshwane | AIA Phase 1 | 22/10/2013 | Udo Kusel | African Heritage Consultants CC | AM Consulting Engineers | 18/11/2013 - 16:45 |
PIA Desktop Study 2019 | Palaeontological Impact Assessment for the proposed extension of the low grade ore Khumani Mine, Sishen, Northern Province: Desktop Study | PIA Desktop | 14/04/2019 | Marion Bamford | Envirogistics (Pty) Ltd | 16/10/2020 - 08:27 | |
PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED TGME MINING PROJECT IN MPUMALANGA | PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED TGME MINING PROJECT IN MPUMALANGA | PIA Phase 1 | 01/03/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | OMI Solutions (Pty) Ltd | 26/04/2022 - 08:27 |
Lengana - HIA | 23/02/2023 - 11:18 | ||||||
HIA: EZIKHUMBENI CAUSEWAY | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EZIKHUMBENI CAUSEWAY IN ULUNDI MUNICIPAL AREA, NORTERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/02/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 17/02/2014 - 12:11 |
Volta EGI HIA | Heritage Impact Assessment for the for the proposed development of 132 KV powerlines and associated Electrical Grid Infrastructure (EGI) (i.e., Volta EGI) from the Volta PV Facility to the planned Artemis Main Transmission Substation (MTS) Near Dealesville, Free State Province. | Heritage Impact Assessment Specialist Reports | 01/03/2023 | Jaco van der Walt | Beyond Heritage | 20/04/2023 - 17:02 | |
HIA - Alzu Piggery, Middelburg | A Report on an Archaeological and Built Environment Heritage Impact Assessment for a Proposed Piggery on Portion 19 of the Farm Grootlaagte 449 JS, Close to Middelburg, Mpumalanga Province. | HIA Phase 1 | 30/04/2015 | Anton van Vollenhoven | Archaetnos CC | Clean Stream Environmental Services | 29/07/2015 - 10:40 |
Heritage Impact Assessment - COZA IRON ORE PROJECT | Remainder of the farm Driehoekspan 435 located north of Postmasburg in the Northern Cape Province - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/11/2015 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | 01/08/2016 - 09:16 | |
Ntuzuma C WWR | LETTER OF EXEMPTION FOR THE PROPOSED NTUZUMA C WATER RETICULATION PROJECT | HIA Letter of Exemption | 01/02/2018 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | JG AFRIKA | 07/02/2018 - 10:25 |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:23 | ||
REPORT 01915V GRAVE ASSESSMENT BRMO | A REPORT ON THE ASSESSMENT OF A POSSIBLE GRAVE AT THE BLACK ROCK MINING OPERATIONS, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/04/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Assmang Black Rock Mining Operations | 23/05/2019 - 09:13 |
HIA: Majuba Ash Disposal | HIA FOR THE PROPOSED CONTINUATION OF THE MAJUBA ASH DISPOSAL FACILITIES, MPUMALANGA PROVINCE | HIA Phase 1 | 01/09/2012 | Johnny Van Schalkwyk | National Cultural History Museum | Lidwala Consulting Engineers (SA) (Pty) Ltd | 25/01/2013 - 14:23 |
Kudumane Mining | PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT FOR A MANGANESE MINE Farms York 279, Devon 277 and Telele 312, near Hotazel Town in the John Toalo Gaetsewe District Municipality in the Northern Cape Province | PIA Phase 1 | 29/03/2011 | Gideon Groenewald, Tom Hugo | Metsi Metseng Geological Services CC | Metago Environmental Engineers (Pty) Ltd | 21/06/2012 - 10:10 |