THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 18751 - 18800 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Umsinde Emoyeni WEF Heritage Pre-Construction Walkthrough Report | Umsinde Emoyeni WEF Heritage Pre-Construction Walkthrough Report | Heritage Study | 15/11/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 15/11/2022 - 12:34 |
AIA_Dolerite_quarry_Cabasi_Village_Van_Ryneveld_K_Mar12 | UMSO CONSTRUCTION -MINING PERMIT APPLICATIIION: DEVELOPMENT OF A QUARRY NEAR CABASI VILLAGE, MOUNT FRERE, EASTERN CAPE, SOUTH AFRICA | AIA Phase 1 | 27/03/2012 | Karen Van Ryneveld | 16/06/2012 - 14:44 | ||
Umsobomvu 400kV HIA | Umsobomvu 400kV Overhead Line Heritage Impact Assessment | HIA Phase 1 | 30/09/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EDF Renewables (Pty) Ltd | 16/11/2022 - 14:47 |
Umsobomvu 400kV PIA | Umsobomvu 400kV Overhead Line Paleontological Impact Assessment | PIA Phase 1 | 30/09/2022 | John Almond | Natura Viva CC | EDF Renewables (Pty) Ltd | 16/11/2022 - 14:50 |
Umsobomvu October 2021 v2 | Umsobomvu October 2021 v2: NEW UMSOMBOMVU SUBSTATION | Heritage Impact Assessment Specialist Reports | 08/07/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal and Environmental Services | 17/05/2022 - 16:15 |
Umsobomvu WEF and Infrastructure Heritage Ground Truthing | Umsobomvu WEF and Infrastructure Heritage Ground Truthing | Heritage Study | 01/11/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal and Environmental Services | 13/02/2023 - 09:44 |
Umzimkhulu Cemeteries Heritage Impact Assessment | Umzimkhulu Cemeteries Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/07/2013 | Frans Prins | Active Heritage CC | Umzimkhulu Local Municipality | 10/04/2015 - 11:30 |
Unaville AH | Unaville Agricultural Holdings Development Framework and Township Establishment, City of Johannesburg Metropolitan Municipality, Gauteng Province | PIA Desktop | Dr. Heidi Fourie | 30/09/2016 - 14:24 | |||
Permit_Mearns_Weir_Anderson_G_Apr01 | Undertake mitigation for two sites that will be affected by the raising of the Mearns Weir. | Archaeological Permit Report | 10/04/2001 | Gavin Anderson | KwaZulu Natal Museum | 16/06/2012 - 14:53 | |
UHIA for the proposed Gas to Power Powership project, Saldanha | UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED GAS TO POWER POWERSHIP PROJECT AT THE PORT OF SALDANHA, WESTERN CAPE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 31/03/2021 | Vanessa Maitland | Triplo4 Sustainable Solutions (Pty) Ltd | 08/04/2021 - 10:32 | |
UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MARINE SERVITUDES | UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MARINE SERVITUDES FOR THE COEGA SEZ, PORT ELIZABETH | AIA Phase 1 | 20/10/2020 | Vanessa Maitland | Coastal & Environmental Services - Port Elizabeth | 23/11/2020 - 12:22 | |
HIA | Underwater Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 17/08/2017 | 09/03/2018 - 12:31 | |||
UHIA for PetroSA Mossel Bay | UNDERWATER HERITAGE IMPACT ASSESSMENT - PETROSA – PROPOSED BYPASS PIPELINES AND REPOSITIONING OF SINGLE-POINT MOORING (SPM) BUOY, MOSSEL BAY, SOUTH AFRICA, | Heritage Impact Assessment Specialist Reports | 26/10/2022 | Vanessa Maitland | Vanessa Maitland | SRK Consulting (Pty) Ltd - Western Cape | 27/10/2022 - 11:19 |
Heritage Report for SASA 4c-6c | Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa | Heritage Impact Assessment Specialist Reports | 12/12/2017 | Vanessa Maitland | De Beers Marine (Pty) Ltd | 21/12/2017 - 15:00 | |
Heritage Report for SASA 4c-6c | Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa | Heritage Impact Assessment Specialist Reports | 12/12/2017 | Vanessa Maitland | De Beers Marine (Pty) Ltd | 21/12/2017 - 15:05 | |
UHIA for Pier 1, Port of Durban | Underwater Heritage Impact Assessment for the Development of a Container Terminal at Pier 1, Phase 2 | HIA Phase 2 | 01/04/2013 | Vanessa Maitland | Jeffares & Green - Port Elizabeth | Transnet National Ports Authority - Saldanha | 25/07/2013 - 23:12 |
Saldanha ADZ HIA | Underwater Heritage Impact Assessment for the Development of an Aquaculture Development Zone (ADZ) at Saldanha Bay | Heritage Impact Assessment Specialist Reports | African Centre for Heritage Activities | Department of Agriculture, Forestry and Fisheries | 05/04/2017 - 11:19 | ||
Saldanha Aquaculture Development Zone HIA | Underwater Heritage Impact Assessment for the Development of an Aquaculture Development Zone (ADZ) at Saldanha Bay Western Cape | HIA Phase 1 | 20/10/2016 | Jonathan Sharfman | African Centre for Heritage Activities | SRK Consulting (Pty) Ltd - Western Cape | 31/08/2017 - 14:02 |
UHIA for Berths 203 - 5 Offshore Sand Winning Areas, Port of Durban | Underwater Heritage Impact Assessment for the proposed Deepening, Lengthening and Widening of Berths 203 to 205 Offshore Sand Winning Areas | HIA Phase 1 | 01/09/2012 | Vanessa Maitland | Nemai Consulting | Transnet National Ports Authority - Saldanha | 25/07/2013 - 23:07 |
UHIA for Berths 203 - 5, Port of Durban | Underwater Heritage Impact Assessment for the proposed PortDeepening, Lengthening and Widening of Berths 203 to 205 | HIA Phase 1 | 01/09/2012 | Nemai Consulting | Transnet National Ports Authority - Saldanha | 25/07/2013 - 23:02 | |
Underwater HIA 12B | UNDERWATER HERITAGE IMPACT ASSESSMENT, PROSPECTING APPLICATION FOR SEA CONCESSION 12B, WEST COAST, SOUTH AFRICA | AIA Desktop | 09/02/2023 | Vanessa Maitland | Vanessa Maitland | Vanessa Maitland | 24/02/2023 - 08:27 |
Underwater Heritage Impact Assessment | Underwater Heritage Impact Assessment, Prospecting Application for Sea Concession 12C, West Coast, South Africa | Heritage Impact Assessment Specialist Reports | 27/10/2022 | Vanessa Maitland | Vanessa Maitland | Vanessa Maitland | 31/10/2022 - 13:11 |
UNDERWATER HERITAGE IMPACT ASSESSMENT | UNDERWATER HERITAGE IMPACT ASSESSMENT, PROSPECTING APPLICATION FOR WC10429PR WITHIN CONCESSION 11A, WESTERN CAPE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 27/06/2023 | Vanessa Maitland | 12/07/2023 - 11:32 | ||
10429PR UNDERWATER HERITAGE IMPACT ASSESSMENT | UNDERWATER HERITAGE IMPACT ASSESSMENT, PROSPECTING APPLICATION FOR WC10429PR WITHIN CONCESSION 11A, WESTERN CAPE, SOUTH AFRICA | 27/06/2023 | Vanessa Maitland | 12/07/2023 - 11:43 | |||
10430PR UNDERWATER HERITAGE IMPACT ASSESSMENT | UNDERWATER HERITAGE IMPACT ASSESSMENT, PROSPECTING APPLICATION FOR WC10430PR WITHIN CONCESSION 10A, WESTERN CAPE, SOUTH AFRICA | 27/06/2023 | Vanessa Maitland | 12/07/2023 - 13:02 | |||
GPR Review - Nyeleti | UNIVEN Gate 3 - GPR Review Report | Archaeological Specialist Reports | 25/09/2023 | 26/09/2023 - 14:21 | |||
University of Cape Town : Avenue Precinct | University of Cape Town : Avenue Precinct : Heritage Impact Assessment : Volume 2 | HIA Phase 1 | 01/11/2000 | Conservation Development Consortium | 18/03/2021 - 11:22 | ||
HERITAGE IMPACT ASSESSMENT REPORT FOR THE DEVELOPMENT OF 3000 BEDS | UNIVERSITY OF MPUMALANGA HERITAGE IMPACT ASSESSMENT REPORT FOR THE DEVELOPMENT OF 3000 BEDS | Heritage Impact Assessment Specialist Reports | 11/01/2021 | Trust Mlilo | Sativa Travel and Environmental Consultants | Sativa Travel and Environmental Consultants | 07/04/2021 - 20:05 |
UniZulu NID Report | University of Zululand Notification of Intent to Develop Report | Heritage Scoping | 24/03/2022 | Claire Abrahamse | Claire Abrahamse | University of Zululand | 24/03/2022 - 15:00 |
S24G Korhaan farming | UNLAWFUL CLEARANCE OF VEGETATION FOR AGRICULTURAL PURPOSES ON PORTION 196 AND 197 OF THE FARM VASTFONTEIN 279 JR SITUATED IN THE MAGESTRIAL DISTRICT OF WONDERBOOM, GAUTENG PROVINCE | HIA Phase 1 | 15/06/2023 - 15:01 | ||||
Midrand Waste Tyre Deport HIA Report | UNLAWFULLY CONSTRUCTION OF A FACILITY FOR THE RECYCLING OF WASTE TYRES ON ERF 22, HOLDING 549, GLEN AUSTIN AGRICULTURAL HOLDING EXT 3, MIDRAND CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY | HIA Phase 1 | 21/02/2017 | Johnny Van Schalkwyk | 21/02/2017 - 10:48 | ||
Midrand Waste Tyre Deport HIA Report | UNLAWFULLY CONSTRUCTION OF A FACILITY FOR THE RECYCLING OF WASTE TYRES ON ERF 22, HOLDING 549, GLEN AUSTIN AGRICULTURAL HOLDING EXT 3, MIDRAND CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY | HIA Phase 1 | 21/02/2017 | Johnny Van Schalkwyk | 21/02/2017 - 10:48 | ||
HEUNINGKRANZ PROJECT - IAIA 14 NOVEMBER 2018 | UPDATED AIA FOR THE HEUNINGKRANZ PROJECT | AIA Phase 1 | 14/11/2018 | Siegwalt Udo Kusel | African Heritage Consultants CC | EXM Advisory Services (Pty) Ltd | 14/11/2018 - 13:25 |
UPDATED AIA FOR THE PROPOSED NOKENG FLUORSPAR MINE AND ASSOCIATED INFRASTRUCTURE PROJECT THE FARMS KROMDRAAI 209 JR AND NAAUWPOORT 208 JR, GAUTENG PROVINCE | UPDATED ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED NOKENG FLUORSPAR MINE AND ASSOCIATED INFRASTRUCTURE PROJECT ON PORTIONS 4 AND 11 AND THE REMAINING EXTENT OF PORTION 2 OF THE FARM KROMDRAAI 209 JR AND PORTION 1 OF THE FARM NAAUWPOORT 208 JR, GAUTENG PROVINCE | AIA Phase 1 | 31/10/2016 | Neels Kruger | Exigo Sustainability | Sepfluor | 26/06/2017 - 16:04 |
Updated Archaeological Impact Assessment Report for proposed expansion of Lephalale Railway Yard | Updated Archaeological Impact Assessment Report for proposed expansion of Lephalale Railway Yard at Steenbokpan, Waterberg District of LImpopo Province | AIA Phase 1 | 30/04/2019 | Eric Ndivhuho Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 15/05/2019 - 08:47 |
Eskom Ntshona HIA Report | Updated cultural heritage impact assessment for the DEVELOPMENT OF THE PROPOSED WESTGATE NTSHONA 132KV SUBSTATION AND OVERHEAD 132KV POWERLINE, MOGALE DISTRICT MUNICIPALITY, GAUTENG PROVINCE | 15/09/2015 | 13/01/2016 - 16:24 | ||||
Updated Heritage Screener: Dunbrody Citrus Expansion | Updated Heritage Screener Desktop Assessment for the proposed expansion of Dunbrody Citrus production on Portion 14 of farm Geelhoutboom 89 in Sundays River Valley, Eastern Cape | Heritage Scoping | 24/02/2017 | Jenna Lavin, Kyla Bluff | CTS Heritage | Public Process Consultants | 28/02/2017 - 09:33 |
Barberton Mines (Pty) Ltd HIA Updated | Updated HIA for the prospecting right by Barberton Mines | HIA Phase 1 | 08/08/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | EcoPartners | 14/08/2019 - 11:23 |
UPDATED PALAEONTOLOGICAL ASSESSMENT WITH REVISED FOSSIL FINDS PROCEDURE FOR THE EMP. | UPDATED PALAEONTOLOGICAL ASSESSMENT WITH REVISED FOSSIL FINDS PROCEDURE FOR THE EMP. PROPOSED PROSPECTING ON A PORTION OF PORTION 1 OF THE FARM VOORUITZIGT 81, SOL PLAATJE MUNICIPALITY, KIMBERLEY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE BYJohn Pether, M.Sc., Pr. Sci. Nat. (Earth Sci.) Geological and Palaeontological Consultant | PIA Desktop | 10/01/2018 | Geological and Palaeontological Consultant | Geological and Palaeontological Consultant | 17/01/2018 - 15:15 | |
UPDATED PALAEONTOLOGICAL ASSESSMENT WITH REVISED FOSSIL FINDS PROCEDURE | UPDATED PALAEONTOLOGICAL ASSESSMENT WITH REVISED FOSSIL FINDS PROCEDURE FOR THE EMP. PROPOSED PROSPECTING ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM ANNEX VIEGULANDS PUT 42, NEAR PRIESKA, SIYATHEMBA LOCAL MUNICIPALITY, PRIESKA MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE BY John Pether, M.Sc., Pr. Sci. Nat. (Earth Sci.) | PIA Desktop | 04/01/2018 | Geological and Palaeontological Consultant | Geological and Palaeontological Consultant | 17/01/2018 - 14:49 | |
Soyuz 5 Final EIR - updated PIA | Updated Palaeontological Impact Assessment for Soyuz 5 Wind Energy Facility | Palaeontological Specialist Reports | 31/03/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 25/04/2023 - 09:23 |
Updated Phase 1 AIA for Tweelaagte | Updated Phase 1 AIA for Tweelaagte | AIA Phase 1 | 05/09/2016 | Anton Pelser | A Pelser Archaeological Consulting | EcoPartners | 05/09/2016 - 12:23 |
Rietkloof Heritage Study | UPDATED PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED RIETKLOOF WIND ENERGY FACILITY (WEF) SITUATED IN THE WITZENBURG LOCAL MUNICIPALITY AND LAINGSBURG LOCAL MUNICIPALITY, AND THE CAPE WINELANDS AND CENTRAL KAROO DISTRICT MUNICIPALITIES RESPECTIVELY. | HIA Phase 1 | 31/10/2018 | Celeste Booth | Booth Heritage Consulting | WSP Environmental Pty Ltd - Johannesburg | 21/11/2018 - 09:42 |
UPDATED PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED RIETKLOOF WIND ENERGY FACILITY (WEF) | UPDATED PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED RIETKLOOF WIND ENERGY FACILITY (WEF) SITUATED IN THE WITZENBURG LOCAL MUNICIPALITY AND LAINGSBURG LOCAL MUNICIPALITY, CAPE WINELANDS AND CENTRAL KAROO DISTRICT MUNICIPALITIES. | Archaeological Specialist Reports | 29/07/2018 | Celeste Booth | Booth Heritage Consulting | WSP Environmental Pty Ltd - Cape Town | 21/08/2018 - 08:43 |
Updated Phase 1 HIA on Droogenfontein | UPDATED REPORT ON A PHASE 1 HIA FOR A PROPOSED COAL MINE ON PORTIONS 26, 46 & 47 OF THE FARM DROOGENFONTEIN 242IR, DELMAS DISTRICT, MPUMALANGA | HIA Phase 1 | 16/04/2014 | Anton Pelser | Shangoni Management Services | 16/04/2014 - 10:03 | |
Finsch Mine Updated Report | Updated report on the Cultural Heritage Impact Assessment for Petra Diamonds Finsch Mine | Archaeological Monitoring | 08/01/2014 | Lloyd Rossouw | National Museum Bloemfontein | Petra Diamonds (Pty) Ltd | 12/02/2014 - 11:43 |
Updated report on the Cultural Heritage Impact Assessment | Updated report on the Cultural Heritage Impact Assessment for Petra Diamonds Finsch Mine(Case ID 3613) | Archaeological Specialist Reports | L Rossouw | National Museum Bloemfontein | Finsch Diamond Mine (Pty) Ltd | 26/11/2018 - 14:08 | |
Updated_Palaeontology_Amandelbult_Report | Updated_Palaeontology_Amandelbult_Report | Palaeontological Specialist Reports | 09/05/2017 | JF Durand | Gaigher & Associates | Aurecon South Africa (Pty) Ltd | 11/05/2017 - 15:22 |
Updated_Palaeontology_Amandelbult_Report | Updated_Palaeontology_Amandelbult_Report | Palaeontological Specialist Reports | 09/05/2017 | JF Durand | Gaigher & Associates | Aurecon South Africa (Pty) Ltd | 11/05/2017 - 15:23 |
AIA_Upgrade_N2_Komkhulo_Sitebe_Van_Ryneveld_K_Mar10 | Upgrade and realignment of the N2, Sitebe Komkhulu to Viedgesville, near Mthatha, Eastern Cape, South Africa | AIA Phase 1 | 23/03/2010 | Karen Van Ryneveld | 16/06/2012 - 14:51 |