FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort descending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
VR003: Excavation Report May 2021 Report on excavations at the archaeological rock shelter site Varsche Rivier 003 (VR003), 2014 - 2016, conducted under HWC permits #X120417JL07 & #16062111AS0622E Archaeological Permit Report 10/05/2021 Teresa Steele, Alex Mackay, Jayson Orton 17/05/2021 - 09:33
Vrede Phase 1 HIA Vrede Phase 1 HIA Lloyd Rossouw Paleo Field Services 23/07/2014 - 14:03
Vroe Werwe in die Franschoek Vallei Vroe Werwe in die Franschoek Vallei (Honours Thesis) Research Publication 01/12/1992 Jaline De Villiers CTS_369779 21/09/2016 - 16:47
Vryburg Extension 29, Huhudi Extension 1 & Huhudi Re-layouts HIA REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE PROPOSED VRYBURG EXT. 29 & HUHUDI EXT.1 TOWNSHIP DEVELOPMENTS ON VARIOUS ERVEN IN THE VRYBURG/HUHUDI AREA AS WELL AS A PORTION OF THE R/E OF PORTION 8 OF THE FARM ROSENDAL 673IN VRYBURG, NORTHWEST PROVINCE HIA Phase 1 01/08/2018 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 07/10/2019 - 17:33
Vryburg Solar 1 Heritage Report Gultural Heritage Impact Assessment for the Proposed Development of a 100 MW (115(MW DC) Solar Photovoltaic Facility (Vryburg Solar 1) and Associated 132kv Transmission Line near Vryburg, North West Province. Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk J van Schalkwyk 16/08/2018 - 14:55
Vryburg Solar 1 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province 24/07/2018 JF Durand 16/08/2018 - 15:05
Vryburg Solar 2 Heritage Report Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 2) and Associated 132kV Transmission Line near Vryburg, North West Province Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk 16/08/2018 - 15:51
Vryburg Solar 2 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province JF Durand 16/08/2018 - 15:58
Vryburg Solar 3 Heritage Report Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 3) and Associated 132kV Transmission Line near Vryburg, North West Province Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk 16/08/2018 - 16:18
Vryburg Solar 3 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province Palaeontological Specialist Reports JF Durand 16/08/2018 - 16:26
Vryburg Waste Water Treatment Works Heritage & Archaeological Specialist Report AIA Phase 1 24/01/2014 David Morris McGregor Museum EndemicVision Environmental Services 12/02/2014 - 14:39
Vryburg WWTW Heritage Specialist Report Appendix D3 Vryburg WWTW Heritage Specialist Report HIA Phase 1 01/04/2014 David Morris McGregor Museum 05/04/2016 - 16:51
Vryheid 2x 88 kV Turn-In Power Lines HIA Report Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE VRYHEID 2X 88KV TURN-IN POWER LINES IN THE ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE HIA Phase 1 31/03/2021 J.A. van Schalkwyk 19/05/2021 - 13:58
Vryheid DBAR Heritage Report Cultural Heritage Impact Assessment of the Proposed Coal Link Project, Vryheid Traction, KwaZulu-Natal. Heritage Impact Assessment Specialist Reports 21/02/2014 Frans Prins Active Heritage CC Sivest - Gauteng 14/04/2015 - 12:57
Vryheid Ext 16 Ph 2 Housing Project HIA HIA for the Proposed Township Establishment of Low income Housing on REM of ERF 10000, Vryheid 12/07/2023 Gavin Anderson Umlando Bizycon Pty Ltd 18/08/2023 - 12:06
VRYHEID MALL PHASE 1 HIA FOR THE PROPOSED VRYHEID MALL, KZN HIA Phase 1 27/02/2023 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management LEAP -Landscape Architectural and Environmental Planning 14/03/2023 - 16:05
Vryheid Network Strenthenning Project Archaeological and cultural heritage phase 1 specialist report for the proposed construction of the Vryheid Network Strengthenning Project within the jurisdiction of Swellendam Local Municipality of Overberg District Municipality, Western Cape AIA Phase 1 17/08/2015 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 16/02/2016 - 09:28
VTM Wagon Laager Wall Maintenance: Needs assessment and technical report Maintenance of the Voortrekker Monument Wagon Laager Wall. Needs assessment and technical report. Non Impact Assessment Related Reports 29/05/2019 Johan Nel, Cecilia Kruger Die Erfenisstigting 10/06/2019 - 13:39
VTM Wagon Laager Wall Maintenance: Needs assessment and technical report Maintenance of the Voortrekker Monument Wagon Laager Wall. Needs assessment and technical report. Built Environment and Cultural Landscapes 29/05/2019 Johan Nel, Cecilia Kruger Die Erfenisstigting 11/07/2019 - 13:09
Vulcania cemetery Cultural Heritage Study 20/02/2014 - 11:56
Vulcania cemetery Cultural Heritage Study 20/02/2014 - 12:18
Vulindlela Bulk Water CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. HIA Phase 1 21/11/2016 Frans Prins Active Heritage CC Kerry Seppings Environmental Management 03/01/2017 - 18:39
Vulindlela Pipelines CULTURAL HERITAGE IMPACT ASSESSMENT OF THE AMENDED PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. HIA Phase 1 01/09/2017 Frans Prins Kerry Seppings Environmental Management Active Heritage CC 09/01/2018 - 09:32
Vunene Mining ARCHAEOLOGICAL IMPACT ASSESSMENT: Vunene Mining AIA Phase 1 Tobias Coetzee Envass Envass 04/12/2012 - 14:45
VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA LOCAL MUNICIPALITY, NORTHERN KWAZULU-NATAL. HIA Letter of Exemption Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 24/02/2015 - 12:55
Vuyani Hloba The proposed forestry projects by D.T. Hloba (15ha) in respect of the same activity occurring in several locations in Stranger’s Rest farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province HIA Phase 1 08/08/2013 Gavin Whitelaw KwaZulu-Natal Amafa and Research Institute Shasa Heritage Consultants CC 14/04/2014 - 16:40
VW Mthatha A LETTER OF EXEMPTION FOR THE PROPOSED NEW NTT VW DEALERSHIP, MTHATHA, E. CAPE HIA Letter of Exemption 26/05/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Indwe Environmental Consulting 26/05/2020 - 15:45
Vyfhoek PHASE 1 HIA REPORT FOR A PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 51 OF THE FARM VYFHOEK 428IQ IN POTCHEFSTROOM, NORTHWEST PROVINCE AIA Phase 1 15/07/2020 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 26/10/2020 - 14:14
Vygenhoek HIA Heritage Impact Assessment Specialist Reports Jaco van der Walt Department of Mineral Resources - Mpumalanga 07/06/2021 - 12:29
Waaihoek HIA HERITAGE SURVEY OF THE PROPOSED WAAIHOEK WIND ENERGY FACILITY, UTRECHT, KWAZULU-NATAL AIA Phase 1 19/05/2014 Gavin Anderson, Louise Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - East London 27/06/2014 - 11:17
Waaihoek PR HIA Phase 1 Heritage Impact Assessment proposed prospecting right over the Remaining Extent of farm Waaihoek 392 near Douglas, Hay District, Northern Cape Province. HIA Phase 1 01/03/2021 Lloyd Rossouw 08/02/2022 - 10:25
Wadley Road Motivation for Additions & Alterations 09/08/2023 09/08/2023 - 08:55
Wagendrift Dam Management Plan Survey and Grading and Management Plan for Wagendrift Dam and Moorpark Protected Areas Conservation Management Plan 30/06/2022 Celeste Rossouw KwaZulu-Natal Amafa and Research Institute KwaZulu-Natal Amafa and Research Institute 07/10/2022 - 14:58
WAGENMAKERSDRIFT 24 JACOBSDAL FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT WAGENMAKERSDRIFT 24, JACOBSDAL, FREE STATE Heritage Impact Assessment Specialist Reports 19/09/2014 Cobus Dreyer De Beers Consolidated Mines (Pty) Ltd De Beers Consolidated Mines (Pty) Ltd 21/09/2014 - 16:49
Wagenpadsprtuit HIA A Report on Cultural Heritage Impact Assessment for the Proposed Drug Rehabilitation Centre on Portion 47 of the Farm Wagenpadspruit 354JQ, Close to Rustenburg, North-west Province HIA Phase 1 21/12/2016 Anton van Vollenhoven 16/07/2020 - 11:33
Wagon laager entrance at Voortrekker Monument 30/04/2021 - 11:45
Wakesleigh Road upgrade Proposed Wakesleigh upgrade, Bellair, eThekwini Municipality, KwaZulu-Natal HIA Phase 1 16/05/2022 Jean Beater JLB Consulting SAT Environmental Consultants (Pty) Ltd 19/05/2022 - 09:20
Wakkerstroom Wakkerstroom AIA Phase 1 16/06/2012 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management 16/06/2012 - 14:33
Walk Down Report Aries ARCHAEOLOGICAL WALK-DOWN SURVEY FOR THE PROPOSED ARIES 50KV POWER LINE NEAR KENHART, KAI! GARIB LOCAL MUNICIPALITY OF ZF MGCAWU DISTRICT, NORTHERN CAPE AIA Phase 1B 11/07/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting AECOM SA - Head Office 17/07/2017 - 08:21
Walk Down Report Helios ARCHAEOLOGICAL WALK-DOWN SURVEY FOR THE PROPOSED HELIOS 50KV POWER LINE NEAR LOERIESFONTEIN, HANTAM LOCAL MUNICIPALITY OF THE NAMAKWA DISTRICT, NORTHERN CAPE AIA Phase 1B 11/07/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting AECOM SA - Head Office 17/07/2017 - 08:10
Walk through for Prt 4 of Klipgats Pan 114 FINAL ARCHAEOLOGICAL ‘WALK THROUGH’ FOR THE APPROVED PV FACILITY ON THE REMAINDER OF PORTION 4 OF KLIPGATS PAN 117, PRIESKA MAGISTERIAL DISTRICT, NORTHERN CAPE AIA Phase 1B 21/02/2014 Jayson Orton ASHA Consulting(Pty) Ltd Aurecon - Cape Town 10/03/2014 - 12:27
Walkdown: Longyuan Mulilo De Aar 2 North WEF HERITAGE IMPACT ASSESSMENT: WALKDOWN OF FINAL LAYOUT OF THE LONGYUAN MULILO DE AAR 2 NORTH WIND ENERGY FACILITY, NORTHERN CAPE PROVINCE Archaeological Monitoring 17/03/2014 Lita Webley, Dave Halkett ACO Associates CC Mulilo Renewable Energy (Pty) Ltd 01/04/2014 - 09:06
Walkerville Village Mews HIA Letter of Exemption for Full HIA & Short Report: Proposed Walkerville Estate/ Walkerville Mews on Part of the Remainder of Portion 174 (of Portion 29) of the Farm Faraosfontein 372IQ, near Walkerville, GAUTENG HIA Phase 1 11/03/2016 Anton Pelser Walkerville Village Mews EnviroSynergy Consulting (Pty) Ltd 18/05/2016 - 11:47
Walkthrough Report MTHS Grid Infrastructure Walkthrough Report Site Inspection Report 21/10/2021 ACO Associates CC 14/04/2023 - 14:23
Walkthrough Report MTHS Grid Infrastructure Heritage Walkthrough Report Site Inspection Report 21/10/2021 ACO Associates CC 14/04/2023 - 14:37
Walkthrough Report: Ummbila Emoyeni ARCHAEOLOGICAL SPECIALIST STUDY Walkthrough In terms of Section 38(8) of the NHRA for a UMMBILA EMOYENI RENEWABLE ENERGY WIND AND SOLAR PV FACILITIES, MPUMALANGA PROVINCE AIA Phase 1B 24/04/2023 Jenna Lavin, Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 24/05/2023 - 13:23
Walkverville Palaeontological Impact Assessment: addendum Addendum to Paleontological Impact Assessment PIA Desktop 01/05/2017 Dr Heidi Fourie Dr Heidi Fourie Walkerville Village Mews 03/05/2017 - 11:23
Walkverville Palaeontological Impact Assessment: Desktop study Walkverville Palaeontological Impact Assessment: Desktop study PIA Desktop 15/11/2016 Dr Heidi Fourie, Dr Heidi Fourie Dr Heidi Fourie, Dr Heidi Fourie Walkerville Village Mews 24/02/2017 - 11:59
WALLMANNSTHAL FLUORSPAR MINE AIA FINAL, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT ON PORTION 4 OF THE FARM WALLMANNSTHAL 278 JR FOR THE WALLMANNSTHAL FLUORSPAR MINE, GAUTENG PROVINCE AIA Phase 1 24/11/2013 Neels Kruger AGES (PTY) Ltd - Pretoria Ulipac (Pty) Ltd. 09/09/2013 - 08:34
Walmer 11305 Palaeontological LoE Recommended Exemption from further Palaeontological Studies: Proposed Low-cost Housing Developemtn on ERf 11305, Walmer, Nelson Mandela Bay Municipality, Eastern Cape HIA Letter of Exemption 01/09/2014 John Almond Natura Viva CC SRK Consulting (South Africa) (Pty) Ltd - PLZ 10/10/2017 - 08:59

Pages

CSV
 
 

Search form