THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 18851 - 18900 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Desktop & Field Heritage Impact Assessment | Desktop & Field Heritage Impact Assessment for a Diamond Prospecting Right on the Farm Stofbakkies 30 in the administrative district of Prieska, Northern Cape Province, South Africa | HIA Phase 1 | 21/08/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 23/08/2023 - 10:32 | |
Desktop & Field Palaeontological Impact Assessment | Desktop & Field Palaeontological Impact Assessment for a Diamond Prospecting Right on the Farm Stofbakkies 30 in the administrative district of Prieska, Northern Cape Province, South Africa | PIA Phase 1 | 21/08/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 23/08/2023 - 10:35 | |
Desktop & Field Heritage Impact Assessment | Desktop & Field Heritage Impact Assessment for a Diamond Prospecting Right on the Farm Stofbakkies 30 in the administrative district of Prieska, Northern Cape Province, South Africa | HIA Phase 1 | 21/08/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 23/08/2023 - 10:38 | |
Palaeontological Desktop Assessment | Palaeontological Desktop Assessment: Section 102/Part 2 Amendment Application Combined with Waste License Application to amend the Existing Prospecting Right to include the Prospecting of Aluminium-, Zinc-, Silicon- and Copper Ore, Registration Division: Kuruman, Northern Cape Province. DMRE ref: NC30/5/1/1/2/11873PR | PIA Desktop | 22/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | 10/10/2023 - 13:03 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED PONGOLAPOORT TENTED SAFARI CAMP | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT PROPOSED PONGOLAPOORT TENTED SAFARI CAMP FOR PONGOLAPOORT SAFARI CAMP (PTY) LTD ON PORTION 5 OF THE FARM DOORNPLAATS 461-HU, UMKHANYAKUDE DISTRICT MUNICIPALITY, JOZINI LOCAL MUNICIPALITY, KWAZULU-NATAL. | HIA Phase 1 | 24/08/2023 | Len van Schalkwyk | eThembeni Cultural Heritage | Eco8 Environmental Planners | 26/09/2023 - 07:05 |
Amafa Motivation-Report | APPLICATION FOR AMAFA CONSENT IN ORDER TO OBTAIN THE APPROVAL For addition and Alteration for a House other that 60 years (Section 34 of the NHRA) AT 38 Mountain View Ave Morningside, R 38 of ERF230, Springfield. | Heritage Study | 24/08/2023 | Yanelsi Aurora Fonseca Nunez | Aurora Architectural Designs | 04/09/2023 - 15:00 | |
PHASE 1 HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project | PHASE 1 HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project Proposed South Block Mining Rights Area King Cetshwayo District Municipality, Mthonjaneni Local Municipality, KwaZulu-Natal | Heritage Scoping | 24/08/2023 | Len van Schalkwyk | eThembeni Cultural Heritage | SLR Consulting (South Africa) (Pty) Ltd | 21/09/2023 - 15:35 |
PHASE 1 HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project | PHASE 1 HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project Proposed South Block Mining Rights Area King Cetshwayo District Municipality, Mthonjaneni Local Municipality, KwaZulu-Natal. | Heritage Scoping | 24/08/2023 | Len van Schalkwyk | eThembeni Cultural Heritage | SLR Consulting (South Africa) (Pty) Ltd | 01/09/2023 - 16:15 |
HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project | HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project Proposed South Block Mining Rights Application King Cetshwayo District Municipality, Mthonjaneni Local Municipality, KwaZulu-Natal | Heritage Scoping | 24/08/2023 | Len van Schalkwyk | eThembeni Cultural Heritage | SLR Consulting (South Africa) (Pty) Ltd | 28/08/2023 - 17:42 |
PHASE 1 HERITAGE IMPACT ASSESSMENT Witwater Airstrip | PHASE 1 HERITAGE IMPACT ASSESSMENT for the Proposed NTT Witwater Airfield on the Farm 948 KR near Vaalwater, Limpopo Province | AIA Phase 1 | 26/08/2023 | Tobias Coetzee | 19/10/2023 - 14:24 | ||
Report on the assessment of potential graves by means of Ground Penetrating Radar (GPR) and archaeological test excavation at the Dwarsrivier Mine, Limpopo Province | Report on the assessment of potential graves by means of Ground Penetrating Radar (GPR) and archaeological test excavation at the Dwarsrivier Mine, Limpopo Province | Archaeological Permit Report | 27/08/2023 | Jaco van der Walt | Beyond Heritage | Envirogistics (Pty) Ltd | 09/08/2023 - 09:50 |
Zibulo North Shaft Project – 132KV Overhead Powerlines | Zibulo North Shaft Project – 132KV Overhead Powerlines | Heritage Impact Assessment Specialist Reports | 28/08/2023 | Jessica Angel | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 03/10/2023 - 13:21 |
230830 Witfontein 444 BP HIA | Phase 1 Heritage Impact Assessment for extension of an existing Borrow Pit on Remainder of farm Witfontein 444 near Viljoenskroon, FS Province. | HIA Phase 1 | 28/08/2023 | 04/10/2023 - 17:05 | |||
Preliminary skeletal report | Preliminary skeletal report for Esor Construction | Site Inspection Report | 28/08/2023 | Louisa Hutten | University of Cape Town - Archaeology | Esor Construction | 29/08/2023 - 14:33 |
AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA Phase 1 | 29/08/2023 | Karen Van Ryneveld | 29/08/2023 - 10:17 | ||
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR MINING RIGHT APPLICATION PORTION 7 & 20 (EXCLUDING PORTION 26) OF THE FARM LEEUWFONTEIN 48 | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR MINING RIGHT APPLICATION PORTION 7 & 20 (EXCLUDING PORTION 26) OF THE FARM LEEUWFONTEIN 48 IS LOCATED WITHIN THE STEVE TSHWETE LOCAL MUNICIPALITY UNDER THE MIDDLEBURG MAGISTERIAL DISTRICT IN MPUMALANGA PROVINCE | HIA Phase 1 | 29/08/2023 | 29/08/2023 - 12:13 | |||
Haesloop Agencies Non Impact Assessment | SURROUND THE PINETOWN RAILWAY STATION. ALL 3 BUILDINGS SHARE THE STREET TO THE PINETOWN RAILWAY STATION 2 OF THE BUILDINGS ARE PORTIONS OF THE EXISTING HAESLOOP AGENCIES OFFICES. THE 3RD BUILDING IS ALLONGSIDE THE HAESLOOP BUILDINGS & VACANT. THE SITE IS SITUATED ON RAILWAY STREET AND IMPERIAL LANE. THE SITE SHARES THE STREET WITH THE PINETOWN RAILWAY STATION | Non Impact Assessment Related Reports | 29/08/2023 | Tyrone Reardon | METROPOLE ARCHITECTS | HAESLOOP AGENCIES | 29/08/2023 - 19:36 |
PIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | PIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | PIA Desktop | 29/08/2023 | Elize Butler | 29/08/2023 - 09:51 | ||
AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA Phase 1 | 29/08/2023 | Karen Van Ryneveld | 29/08/2023 - 10:15 | ||
Zibulo Colliery 132 kV Powerline and Substation Project | Zibulo Colliery 132 kV Powerline and Substation Project | Palaeontological Specialist Reports | 30/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 03/10/2023 - 13:56 |
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR TORNOWIZE MINING RIGHT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR MINING RIGHT APPLICATION PORTION 7 & 20 (EXCLUDING PORTION 26) OF THE FARM LEEUWFONTEIN 48 IS LOCATED WITHIN THE STEVE TSHWETE LOCAL MUNICIPALITYUNDER THE MIDDLEBURG MAGISTERIAL DISTRICT IN MPUMALANGA PROVINCE | HIA Phase 1 | 30/08/2023 | 29/08/2023 - 12:09 | |||
Heritage Impact Assessment Report | Proposed Seelo Alpha 240MW Solar PV and BESS Project near the town of Carletonville, North West Province, South Africa - Heritage Impact Assessment Report | HIA Phase 1 | 31/08/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 13/09/2023 - 17:38 |
VIA for the Padloper Solar PV Facility 1, NC | VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUT FOR BASIC ASSESSMENTS FOR THE PROPOSEDDEVELOPMENT OF THE PADLOPER SOLAR PROJECTS 1 - 4, NEAR MURRAYSBURG IN THE NORTHERN AND WESTERN CAPE PROVINCES | Visual Impact Assessment | 31/08/2023 | Kerry Schwartz | SLR Consulting (South Africa) (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:14 |
Interim report - Phase II archaeological mitigation on sites TCHR6 and TCHR10 (TFHM5-1 to TFHM5-6) | Interim mitigation Report for the Phase 2 archaeological mitigation on sites TCHR6 and TCHR10 (TFHM5-1 to TFHM5-6) for the Samancor Tubatse Ferrochrome Smelter Plant, Fetakgomo Local Municipality, Sekhukhune District Municipality, Limpopo Province | Archaeological Permit Report | 31/08/2023 | Wouter Fourie | PGS Heritage (Pty) Ltd | Royal Haskoning DHV | 31/08/2023 - 16:41 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment: Seelo Alpha 240MW Solar PV and BESS Project near Carletonville, North West Province | PIA Phase 1 | 31/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | Nemai Consulting | 13/09/2023 - 17:41 |
Heritage Impact Assessment Report | Heritage Impact Assessment Report: Proposed Seelo Alpha 240MW Solar PV and BESS project near the town of Carletonville, North West Province, South Africa | HIA Phase 1 | 31/08/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 13/09/2023 - 17:46 |
VIA for the Padloper EGI 1, NC & WC | VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUTS FOR BASIC ASSESSMENTS FOR THE PROPOSED DEVELOPMENT OF PADLOPER ELECTRICAL GRID INFRASTRUCTURE PROJECTS 1 - 4 , NEAR MURRAYSBURG IN THE WESTERN AND NORTHERN CAPE PROVINCES | Visual Impact Assessment | 31/08/2023 | Kerry Schwartz | SLR Consulting (South Africa) (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:56 |
Seelo Beta PV Project_Heritage Impact Assessment Report | Heritage Impact Assessment_Proposed 240MW Seelo Beta PV and BESS project near the town of Carletonville, North West Province, South Africa | HIA Phase 1 | 31/08/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/09/2023 - 10:24 |
Mizmor Granite Quarry Heritage Report | GRAVE IDENTIFICATION & VERIFICATION REPORT ON THE EXISTING GRANITE QUARRY ON THE FARM ROODEKOPJES OF ZWARTKOPJES 427JQ, IN MATEBELENG, DISTRICT OF BRITS, NORTH WEST PROVINCE, SOUTH AFRICA | Heritage Statement | 31/08/2023 | Lesiba Phahladira | REACH ARCHAEOLOGY | Moloi Granite | 05/09/2023 - 16:23 |
Seelo Beta PV Project_Palaeontological Impact Assessment Report | Palaeontological Impact Assessment Report_Seelo Beta 240MW Solar PV and BESS Project near Carletonville, North West Province. | PIA Phase 1 | 31/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | Nemai Consulting | 14/09/2023 - 10:29 |
Seelo Beta PV Project_Heritage Impact Assessment Report | Heritage Impact Assessment Report_Proposed 240MW Seelo Beta Solar PV and BESS project near the town of Carletonville, North West Province, South Africa. | PIA Phase 1 | 31/08/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/09/2023 - 10:33 |
VIA for the Padloper EGI 4, NC & WC | VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUTS FOR BASIC ASSESSMENTS FOR THE PROPOSED DEVELOPMENT OF PADLOPER ELECTRICAL GRID INFRASTRUCTURE PROJECTS 1 - 4 , NEAR MURRAYSBURG IN THE WESTERN AND NORTHERN CAPE PROVINCES | Visual Impact Assessment | 31/08/2023 | Kerry Schwartz | SLR Consulting (South Africa) (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 15:19 |
Seelo Charlie Solar PV_Heritage Impact Assessment Report | Heritage Impact Assessment_Proposed Seelo Charlie 140MW Solar PV and BESS project near the town of Carletonville, North West Province, South Africa | HIA Phase 1 | 31/08/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/09/2023 - 11:37 |
Seelo Charlie Solar PV_Palaeontological Impact Assessment Report | Palaeontological Impact Assessment Report_Seelo Charlie 140MW Solar PV and BESS project near Carletonville, North West Province | HIA Phase 1 | 31/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | Nemai Consulting | 14/09/2023 - 11:42 |
Seelo Charlie Solar PV_Heritage Impact Assessment Report | Heritage Impact Assessment Report_Proposed Seelo Charlie 140MW Solar PV and BESS project neat the town of Carletonville, North West Province, South Africa | HIA Phase 1 | 31/08/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/09/2023 - 13:25 |
Seelo Charlie Solar PV_Palaeontological Impact Assessment Report | Palaeontological Impact Assessment Report_Seelo Charlie 140MW Solar PV and BESS project near Carletonville, North West Province | PIA Phase 1 | 31/08/2023 | Elize Butler | Nitai Consulting | Nemai Consulting | 14/09/2023 - 13:28 |
Maritime Heritage for Block 11B/12B | Maritime Heritage Impact Assessment for Offshore Production Right and Environmental Authorisation Applications for Block 11B/12B | HIA Phase 1 | 01/09/2023 | John Gribble | ACO Associates CC | WSP Group Africa (Pty) Ltd | 24/09/2023 - 15:47 |
Letter Requesting Exemption: Mount Ruth | DESKTOP HERITAGE STATEMENT - RECOMMENDATION FOR EXEMPTION Proposed Mount Ruth Mixed Use Development, Mdantsane, East London | HIA Letter of Exemption | 01/09/2023 | Jenna Lavin | CTS Heritage | Terreco Environmental | 01/09/2023 - 09:38 |
Limestone Mining Archaeological Desktop Study for PR | Archaeological Desktop Study for PR the application of a prospecting right on Farm Standard Salt Pan 1959 and Portions 1 & 3 of Farm Witkraal 878, Petrusburg, Free State | AIA Desktop | 01/09/2023 | Tobias Coetzee | Agri Civils Geo-Tech & Heritage | Eco Elementum (Pty) Ltd | 18/09/2023 - 12:37 |
Heritage_Phase 1AIA | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR A PROPOSED WAREHOUSE DEVELOPMENT ON ERF 35 IN GREENBUSHES, GQEBERHA (PORT ELIZABETH), NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE. | HIA Phase 1 | 01/09/2023 | Kobus Reichert | Eastern Cape Provincial Heritage Resources Authority | Digital Soils Africa (Pty) Ltd | 15/09/2023 - 12:43 |
Phase 2a Heritage Monitoring (Interim Report 1) - Impofu North Wind Farm, Impofu West Wind Farm, and Impofu East Wind Farm, near Oyster Bay, Kouga Local Municipality, Sarah Baartman District Municipality, Eastern Cape | Phase 2a Heritage Monitoring (Interim Report 1) - Impofu North Wind Farm, Impofu West Wind Farm, and Impofu East Wind Farm, near Oyster Bay, Kouga Local Municipality, Sarah Baartman District Municipality, Eastern Cape | Archaeological Monitoring | 02/09/2023 | Karen Van Ryneveld | 02/09/2023 - 07:22 | ||
Heritage Report - Zeekoebaart 306 | Heritage Scoping Study: The proposed Zeekoebaart 306 PRA Project, ZF Mgcawu district Municipality, Northern Cape Province | Heritage Scoping | 02/09/2023 | Neels Kruger | 20/09/2023 - 10:21 | ||
Klerefontein HIA | Heritage Resource Management Process for the Proposed Upgrades of the Klerefontein Engineering Operations Centre at the Karoo Support Base near Carnarvon, Northern Cape | Heritage Impact Assessment Specialist Reports | 04/09/2023 | Shannon Hardwick | Digby Wells Environmental | South African Radio Astronomy Observatory | 04/09/2023 - 13:10 |
Heritage Impact Assessment for the proposed Clearing of Indigenous Vegetation for the Construction of an Off-Stream Storage Dam and Related Infrastructure on the Farm: Klein Pos 420 MR within Blouberg Local Municipality, Capricorn District, Limpopo Provin | Heritage Impact Assessment for the proposed Clearing of Indigenous Vegetation for the Construction of an Off-Stream Storage Dam and Related Infrastructure on the Farm: Klein Pos 420 MR within Blouberg Local Municipality, Capricorn District, Limpopo Province | HIA Phase 1 | 07/09/2023 | Jaco van der Walt | Beyond Heritage | Tua Conserva Environmental | 15/09/2023 - 16:05 |
HIA for the Padloper EGI 1, NC & WC | HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A 132 KV OVERHEAD POWER LINE AND ASSOCIATED INFRASTRUCTURE BETWEEN THE PROPOSED PADLOPER SOLAR 1 AND THE PROPOSED AUTHORISED ISHWATI EMOYENI COLLECTOR SUBSTATION (i.e., PADLOPER EGI 1), NEAR MURRAYSBURG, MURRAYSBURG MAGISTERIAL DISTRICT, WESTERN CAPE, AND RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 08/09/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:41 |
PHASE 1 HIA SOLAR PHOTOVOLTAIC (PV) FACILITY DEVELOPMENT KOEDOESKOP | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF UP TO 480MW SOLAR PHOTOVOLTAIC (PV) FACILITY BY ALLIED GREEN ENERGY (PTY) LTD ON PORTION 1 OF THE FARM ZWARTWITPENSBOKFONTEIN 434-KQ, KOEDOESKOP, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT, LIMPOPO PROVINCE | HIA Phase 1 | 08/09/2023 | Heidi Fivaz, Sky-Lee Fairhurst, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Conserva Environmental Management Services | 18/09/2023 - 10:11 |
HIA for the Padloper EGI 4, NC & WC | HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A 132 KV OVERHEAD POWER LINE AND ASSOCIATED INFRASTRUCTURE BETWEEN THE PROPOSED PADLOPER SOLAR 4 AND THE PROPOSED AUTHORISED ISHWATI EMOYENI COLLECTOR SUBSTATION (i.e., PADLOPER EGI 4), NEAR MURRAYSBURG, MURRAYSBURG MAGISTERIAL DISTRICT, WESTERN CAPE AND RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 08/09/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 15:11 |
HIA for the Padloper Solar PV Facility 1, NC | HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED PADLOPER PHOTOVOLTAIC FACILITY 1 NEAR MURRAYSBURG, RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 08/09/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:02 |
Palaeontological Impact Assessment for the Proposed Die Berg Dam on Farm Klein Pos 420 MR (or Graaf Reinet 71 MR), Capricorn District, Limpopo Province | Palaeontological Impact Assessment for the Proposed Die Berg Dam on Farm Klein Pos 420 MR (or Graaf Reinet 71 MR), Capricorn District, Limpopo Province | PIA Desktop | 09/09/2023 | Marion Bamford | Prof Marion Bamford | Tua Conserva Environmental | 15/09/2023 - 16:10 |
HIA MAKHADO COLLIERY | PHASE 1: HERITAGE IMPACT ASSESMENT RELATING TO COAL CORE SAMPLE DRILLING AND RELATED MINING INFRUSTRUCTURE ON FARMS DARU 889MS, TANGA 648MS, LUKIN 643 MS, SALAITA 188MT MAKHADO COLLIERY MINE, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE. | HIA Phase 1 | 09/09/2023 | Millennium Heritage Group (PTY) LTD | 26/07/2023 - 12:39 |