MyProjects

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 22 of 22
CaseID CaseReference ApplicationDate Status
13574 Prospecting Right Application: Boschpoort 284JQ Portion 12, 26 and 33 08/03/2019 DRAFT
12346 Mafube Coal Mining (Pty) Ltd: Proposed Road Realignment EIA/EMP - Draft Scoping Report 19/03/2018 Closed (Approved)
12254 Davel project 21/02/2018 Studies Pending
9599 Environmental Impact Assessment process for the proposed Matla-Glockner loop-in and loop-out 400 kV transmission lines to connect the KiPower IPP power plant to the national grid 19/05/2016 Closed (Approved)
6819 Phase 1 Heritage Impact Assessment (HIA) study for the Proposed construction of a clean water pipeline from The Middelburg water reclamation plant 24/11/2014 Closed (Approved)
6797 Proposed construction of a clean water pipeline from the Middelburg water reclamation plant to the Middelburg Colliery 19/11/2014 DRAFT
6492 Middelburg Mine Klipfontein Section Proposed Extension of Opencast Operations and Associated Relocation of Road D253 29/09/2014 For Noting
5817 KiPower pipeline HIA 09/06/2014 Studies Submitted
5532 Construction of a 22 kV Eskom powerline 06/05/2014 Studies Pending
4266 Shanduka Coal (Pty) Ltd: R575 Road Deviation 28/11/2013 Studies Pending
4063 Exxaro Arnot Mooifontein Portions 1,7 & REM 11/11/2013 Returned to Applicant
3840 Pilanesberg Platinum Housing Development Basic Assessment 11/10/2013 Studies Submitted
3817 Kuka Aerial Ropeway Project 09/10/2013 For Noting
2968 HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED PROJECT 16/07/2013 Closed (Approved)
2042 Lusthof Colliery Project Carolina, Mpumalanga 18/04/2013 Decision Passed
1796 Eskom Spencer NDP Project 14/03/2013 For Noting
1788 Sasol Mining Borrow Pits Project Secunda 13/03/2013 Closed (Approved)
1539 Eskom's proposed Mmamathsekeli project in the Limpopo Province 12/02/2013 Closed (Approved)
1487 Wonderfontein Colliery Project 04/02/2013 Studies Pending
1095 Sasol Secunda Graves Exhumation 06/12/2012 Closed (Approved)
1268 HOOGLAND EXTENSION PROJECT AT EVEREST PLATINUM MINE 01/06/2011 For Noting
971 Everest Platinum Mine, Mpumalanga 03/05/2011 Closed (Approved)
 
 