Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Provincial Road Deviation (P4380)

HeritageAuthority: 

PermitID: 

239

PermitHolder: 

PermitDate: 

Monday, April 22, 2013 to Tuesday, April 22, 2014

NHRA: 

SiteReference: 

Conditions: 

Conditions:

If the permit holder is not to be present on the site at all times then the heritage authority must be provided with the names and qualifications of the authorised representatives.Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed.  Note that the position of all excavations and objects collected must be marked on a plan of site. 

A standard site record form must be lodged with the local Museum. Human remains must at all times be handled with respect and graves should not be disturbed except where unavoidable.

The consultation procedures as indicated in the Regulations and the National Heritage Resources Act must be observed as appropriate. The recommendations for removal of graves and exhumations and for re-burial stipulated in SAHRA's Policy. All remains recovered will be relocated/reburied to Ga- Masenya cemetery.

A report on the specimens recovered and their origin must be submitted to the heritage authority annually on or before 30 May 2014 for the duration of the permit. 

Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with the relevant provincial heritage authority and SAHRA. If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.

It is the responsibility of the permit holder to obtain permission from the landowner for each visit, and conditions of access imposed by the landowner must be observed. 
It is the responsibility of the permit holder to fill in excavations and protect sites during and after excavation to the satisfaction of the heritage authority and the landowner.

The heritage authority shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.The heritage authority reserves the right to cancel this permit by notice to the permit holder.

PermitFeePaidDate: 

22/04/2013
 
 