Commissioning Company Reports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 29 of 29
HeritageReport
HIA Tau Gas Plant and its associated Infrastructure in Komatipoort
TLOU GAS POWER PLANT HIA
Tau Gas Plant AIA
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT
Archaeological and Heritage Impact Assessment Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT REPORT
EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT
The proposed construction of the Eskom Shongweni 2x500MVA 400/132kV substation, approximately 15km Hector – Shongweni 2x400kv powerline and associated infrastructures within the jurisdiction of EThekwini Metropolitan Municipality In Kwazulu-Natal Province
DRAFT ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ETNA-TRADE ROUTE 88KV POWERLINE AND SWITCHING STATION, LENASIA, GAUTENG PROVINCE
Archaeological and Heritage Impact Assessment Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure within the jurisdiction of Dipaleseng Local Municipality in the Mpumalanga Province.
Archaeological and HIA Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure within the jurisdiction of Dipaleseng Local Municipality in the Mpumalanga Province
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE
Offset Kudu Integration Project Heritage Rationale
Heritage Report for the proposed exansion of Transnet railway loops in Thabazimbi, Ferrogate and Northam
proposed expansion of the Transnet railway loops in Thabazimbi, Ferrogate and Northam
PHASE 1ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED 5, 5 KILOMETERS TWEEDRACHT 88kV POWER LINE
AIA proposed deviation of Eskom Juno Gromis 400kV transmission line
COEMPr ESKOM JUNO GROMIS 400kV TRANSMISSION LINE
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF VRYHEID NETWORK STRENGTHENING PROJECT WITHIN SWELLENDAM LOCAL MUNICIPALITY
Vryheid Network Strenthenning Project
Westgate Randfontein 10km Deviation
Rand Water T5 Pipe Line AIA
Rand Water A13 AIA Report
Eskom Calcined AIA Report
AIA FOR TUBATSE STRENGTHENING PHASE I – SENAKANGWEDI B INTEGRATION
NOTICE OF BASIC ASSESSMENT PROCESS FOR THE PROPOSED DEMOLISHING OF THE EKANGALA OLD OXIDATION PONDS
 
 