Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred onĀ Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

80/04/08/032/51B

HeritageAuthority: 

PermitID: 

1789

PermitHolder: 

PermitDate: 

Friday, September 17, 2004 to Saturday, October 1, 2005

NHRA: 

Activities: 

SiteReference: 

Conditions: 

1. If the permit holder is not to be present on the site at all times then SAHRA must be provided with the names and qualifications of the authorised representatives.
2. Monitoring of earthmoving activities in sensitive areas should be strictly observed by the archaeologist and this should not be delegated even where disturbance appears to be superficial.
3. All sites identified in the report should be sampled and smaller sites excavated in their entirety. Sites 13 and 21 would require an adequate conservation management plan to allow for the long-term protection and management of the sites.
4. Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be used. Note that the position of all excavations must be marked on a plan of each site.
5. A standard site record form must be lodged with the Albany Museum.
6. All material collected and excavated, as well as field notes and records, will be curated by the IZIKO: South African Museum.
7. A progress report must be submitted to SAHRA on or before 1 October 2005 and 1 October 2006 and a final report is due on or before 1 October 2007. SAHRA reserves the right to withhold further permits if progress is not deemed satisfactory.
8. Reprints of all published papers, or copies of theses or reports resulting from this work must be lodged with SAHRA.
9. If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.
10. It is the responsibility of the permit holder to obtain permission from the landowner for each visit, and conditions of access imposed by the landowner must be observed.
11. It is the responsibility of the permit holder to fill in excavations and protect sites during and after excavation to the satisfaction of SAHRA and the landowner.
12. SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
13. SAHRA reserves the right to cancel this permit upon notice to the permit holder.

PDF of Permit: 