Authoring Company Reports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 50 of 61
HeritageReport
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE FOR TSHILAMBA 132KV POWERLINE
PIA report ReitzPetsana
Tahiti - Fontein PIA
Tahiti - Fontein PIA
Tahiti - Fontein PIA
PROPOSED NEW THEMBALETHU SECONDARY SCHOOL
Paleontological report-Sigma
Acaciaville Housing development HIA
Acaciaville Housing development HIA
Status quo Report for Westgate Substation
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines
Construction of the New Nzalo (Mqwabe) 400/88kV, 160MVA Substation with associated 88kV and 400kV turn in power lines East of Vryheid, KwaZulu-Natal Province
Phase I AHIA for Vryburg Agrihub
Archaeological and Cultural Heritage Impact Assessment Specialist Report
Archeological and Cultural Heritage Impact Assessment Specialist Report
PHASE I AHIA FOR THE HYPERAMA PIPELINE
Mathulini AIA
Archaeological and cultural heritage impact assessment report for the proposed upgrade and construction of Qhozo access road.
HIA for Matai Mining Right Application
Draft HIA for Hoxane Substation
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT REPORT
EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT
The proposed construction of the Eskom Shongweni 2x500MVA 400/132kV substation, approximately 15km Hector – Shongweni 2x400kv powerline and associated infrastructures within the jurisdiction of EThekwini Metropolitan Municipality In Kwazulu-Natal Province
M2 Precious and Base Metals HIA Report
M2 Precious and Base Metals HIA Report
ARCHAEOLOGICAL AND CULTURAL ASSESSMENT FOR LEC
PHASE 1 ARCHAEOLOGICAL AND CULTURAL REPORT FOR LIMPOPO EAST CORRIDOR STRENGTHENING
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE
Offset Kudu Integration Project Heritage Rationale
AIA for the proposed development of residential township on Fouriestrust 2525
AIA proposed deviation of Eskom Juno Gromis 400kV transmission line
COEMPr ESKOM JUNO GROMIS 400kV TRANSMISSION LINE
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF VRYHEID NETWORK STRENGTHENING PROJECT WITHIN SWELLENDAM LOCAL MUNICIPALITY
Vosloorus HIA
Archaeological and Cultural Heritage Impact Assessment
Vryheid Network Strenthenning Project
HERITAGE ASSESSMENT REPORT KHOMFINI VEH BRIDGE
KHOMFINI VEHICULAR BRIDGE
Rand Water T5 Pipe Line AIA
Rand Water A13 AIA Report
Eskom Calcined AIA Report
Transnet Juno TFS AIA
Transnet Garona TFS AIA
Transnet Helios TFS AIA
Transnet Aries TFS AIA
Marang B Substation and 400kV Powerline
AIA FOR TUBATSE STRENGTHENING PHASE I – SENAKANGWEDI B INTEGRATION
ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED TUBATSE STRENGTHENING PHASE I – SENAKANGWEDI B INTEGRATION

Pages

 
 

Search form