This permit is issued to Mr Birkholtz for disturbance of site P3-10 during the construction of the R5 pipeline between Mamelodi and Vlakfontein. SAHRA understands that at least four stone features and a section of the stone wall located within the pipeline servitude will be affected by the development.
Conditions:
- If Mr Birkholtz is not to be present on the site at all times, SAHRA must be provided with the names and qualifications of the authorised representatives.
- Monitoring of the site by Mr Birkholtz, or a representative approved by SAHRA, is compulsory for the entire duration of the work undertaken in proximity of site P3-10.
- Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed. The position of all stones removed must be marked on a plan of site.
- An annual progress report on the results of the excavations and analyses must be submitted to SAHRA by the end of April 2016. A final report is due on or before the end of April 2017.
- Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with SAHRA.
- If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.
- SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
- SAHRA reserves the right to cancel this permit by notice to the permit holder.