MyReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 151 - 200 of 368
ReportRef ReportDate ReportFile
4.2. Appendix D - PIA report Kokosi Outfall 2 05Sept2020 05/09/2020 PDF icon Paleontology Impact Assessment
Exemption Letter Palaeontology Malalane 389 JU and N4 11/09/2020 PDF icon Letter Req exemption SAHRA Malalane N4 upgrade 11Sept2020.pdf
Palaeontological Impact Assessment for the proposed Richards Bay Nseleni Independent Floating Power Plant, KwaZulu Natal Province 08/05/2020 PDF icon PIA report Richards Bay NIFPP_Final.pdf
Delmore Park Ex 8 Bulk Services HIA 01/12/2020 PDF icon HIA for Delmore Park Ex8 Bulk Services, PDF icon PIA for Delmore Park Ex8 Bulk Services
Paleontological Impact Assessment for the proposed Farm Marsh Hydroponics Systems Project 24/01/2021 PDF icon 2 PIA report Marsh Farm 467 24Jan2021.pdf
Gugwini Palaeontological 26/02/2021 PDF icon Gugwini PIA
PIA for Construction of Culvert on L2013 in Bergville 20/03/2021 PDF icon Palaeontological Impact Assessment for the proposed Culvert on Road L2013, Bergville, Okhahlamba Local Municipality, KwaZulu Nat
PIA for construction of Culvert on L1511 20/03/2021 PDF icon PIA report Culverts L1511 Bergville (Okhahlamba) 20Mar2021.pdf
Palaeontological Impact Assessment for the proposed Nquthu Pipeline, east of Dundee, KwaZulu Natal Province 14/03/2021 PDF icon PIA report Nquthu pipeline 14Apr2021.pdf
PIA report Witbank Siyanqoba PL 08May2021 rev 1 08/05/2021 PDF icon PIA report Witbank Siyanqoba PL 08May2021 rev 1.pdf
PIA report for the proposed Rhenosterfontein Mast, North West Province 09/05/2021 PDF icon PIA report Rhenosterfontein mast 09May2021.pdf
Upgrade of R101 Section 8 - HIA Report 21/05/2021 PDF icon Draft HIA for the Proposed Upgrade of SANRAL R101 Section 8 , PDF icon Draft PIA for the Proposed Upgrade of SANRAL R101 Section 8
PIA report for the proposed Olifantsnek Mast, North West Province 09/05/2021 PDF icon PIA report Olifantsnek mast on Commissiesdrift 09May2021.pdf
COP6679 Draft EIA Appendix L (PIA) 08/07/2021 PDF icon COP6679 Draft EIA Appendix L (PIA)
Palaeontological Impact Assessment for the proposed Magalies River Lodge, Magaliesberg, Northwest Province 09/10/2020 PDF icon PIA report Magalies River Lodge 09Oct2020 (1).pdf
UCD6097 - Draft EIA Appendix J (Palaeontology) 30/04/2021 PDF icon UCD6097 - Draft EIA Appendix J (Palaeontology)
Desktop PIA: Sonvanger Powerline 29/07/2021 PDF icon PIA report Sonvanger OHL 29Jul2021.pdf
Desktop PIA: Grootpoort OHL 29/07/2021 PDF icon PIA report Grootpoort OHL 29Jul2021.pdf
PIA for proposed Dalpark Retail Development 30/06/2021 PDF icon Palaeontological Impact Assessment for the proposed Dalpark Retail Development near Carnival City, Boksburg, Gauteng Province
PIA for proposed Dalpark Retail Development 30/06/2021 PDF icon Palaeontological Impact Assessment for the proposed Dalpark Retail Development near Carnival City, Boksburg, Gauteng Province
PIA Dreamworks Solar PV Facility 31/07/2021 PDF icon PIA site report Dreamworks PV 31Jul2021 Final.pdf
PIA Field survey for Khutsong south ext. 8 21/08/2021 PDF icon PIA KHUTSONG SOUTH EXT. 8
PIA: Beeshoek Iron Ore Mine TRF and railway siding 24/07/2019 PDF icon PIA report Beeshoek TFR & Siding Jul2021 Rev .pdf
Palaeontological Impact Assessment 09/08/2021 PDF icon 1c PIA report Erfs 687 1526 PR Barkly West 11Aug2021.pdf
Palaeontological Impact Assessment 09/08/2021 PDF icon 1c PIA report Erfs 687 1526 PR Barkly West 11Aug2021.pdf
Palaeontological Impact Assessment for the proposed lattice mast on Varkenskraal, Ventersdorp, North West Province 29/08/2021 PDF icon PIA report Varkenskraal mast Ventersdorp 29Aug2021 (1).pdf
PIA for the proposed Tawana Hotazel Mine, Northern Cape Province 22/04/2021 PDF icon PIA Proposed Tawana Hotazel Mine
PIA for Park Rynie Asphalt Plant 25/07/2021 PDF icon PIA report Park Rynie Asphalt Plant 25Jul2021.pdf
Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 11/09/2021 PDF icon Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 Pluto Substation to Westgate S
Palaeontological Impact Assessment for the proposed clearing for agriculture on farm River 141 MS, west of Musina, Vhembe District, Limpopo Province 19/09/2021 PDF icon PIA report Farm River 141 Agric 19Sep2021.pdf
Palaeontological Impact Assessment for the Section 24G application for Branscombe (Pty) Ltd, Portion 1071 (a portion of Portion 158, Farm Zwavelpoort 373 JR, Tshwane, Gauteng Province 04/09/2021 PDF icon PIA report Branscombe S24G appln 04Sep2021.pdf
PIA: Wessels Mine Railway Extension 14/10/2021 PDF icon PIA report Hotazel rail 14Oct2021.docx_.pdf
PIA - Ogies South 15/10/2021 PDF icon PIA 15878.pdf
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline 31/08/2021 PDF icon PIA Report Ararat-Bafokeng 88kV - PP Review.pdf
Palaeontological Impact Assessment 17/10/2021 PDF icon PIA site report Nooitgedacht EIA Ogies 17Oct2021.pdf
Desktop Study Phase 1 22/08/2021 PDF icon PIA report Wembezi retail Klipplaatdrift 22Aug2021 rev.pdf
Palaeontological Impact Assessment for the proposed residential development on Griffiths Road, Equestria Ext 283, Gauteng Province 09/08/2021 PDF icon PIA report Equestria Ext 283 Griffiths Rd resid devpmt 09Aug2021.pdf
Palaeontological Impact Assessment for the proposed residential development on Furrow Road, Equestria Ext 283, Gauteng Province 09/08/2021 PDF icon PIA report Equestria Ext 284 Furrow Rd Aug2021.pdf
PIA 57A North Beach Road 09/06/2021
PIA 57A North BEach Road, Westbrook 09/06/2021 PDF icon 4. PIA.pdf
PIA for Expansion of Infrastructure at 99 Colwyn Drive, Sheffield. 06/07/2021 PDF icon 4. PIA Report 99 Colwyn Drive.pdf
PIA - 12852PR 13/11/2021 PDF icon PIA 12852PR.pdf
Tshikota PIA Desktop Study (Phase 1) 25/11/2020 PDF icon PIA report Tshikota housing 25Nov2020.pdf
Doli-Doli PIA Desktop Study (Phase 1) 29/05/2021 PDF icon PIA report Keerweder 169MT Dolidoli 29May2021.pdf
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline 31/08/2021 PDF icon PIA Report Ararat-Bafokeng 88kV - PP Review.pdf
PIA phase 2 11/09/2021 PDF icon PIA site visit report Westrand Strengthening Phase 2 12Sept2021.pdf
Paleontological Impact Assessment 15/09/2021 PDF icon PIA site report_ Hennops Wedding and Conference_15Sept2021.pdf
Thuthukani PIA 08/08/2021 PDF icon PIA report Thuthukani Lekwa Cemetery 08Aug2021.pdf
PIA Exemption Letter 02/12/2021 PDF icon PIA Exemption Letter
PIA report Beatrix DF-SMF 11kV powerline 11/10/2021 PDF icon PIA report Theunissen OH PL connector_Beatrix.pdf

Pages

 
 

Search form