PermitID:
PermitHolder:
PermitTo:
PermitDate:
NHRA:
KZNHA:
Activities:
SiteReference:
Conditions:
Grade: IIIC
Drawing no.: N22-12WD01, N22-12WD02
Date: 15 September 2022
Drawn By: ....(Design & Drawing Technology)
Conditions: This permit is issued subject to the following conditions:-
1.1 That the work is carried out strictly in accordance with the application submitted on the 05 August 2022
1.2 That in the event of any contemplated deviation, the prior written approval of the KwaZulu-Natal Amafa and Research Institute must be obtained;
1.3 In such event, a written motivation in support of such deviation must be submitted to KwaZulu-Natal Amafa and Research Institute for consideration and;
1.4 The KwaZulu-Natal Amafa and Research Institute has the right to inspect the site at any time;
1.5 Where necessary monthly reports are to be submitted to the KwaZulu-Natal Amafa and Research Institute on the work being conducted and the findings;
1.6 A final report on the work conducted and the findings must be submitted to the KwaZulu-Natal Amafa and Research Institute not later than thirty (30) days from the date of expiration of this permit, extensions are negotiable;
1.7 All salvageable material not required for re-use on the site must be offered to the KwaZulu-Natal Amafa and Research Institute and selected material must be delivered to the repository at Midmar at the applicant’s cost;
1.8 The KwaZulu-Natal Amafa and Research Institute must be contacted immediately upon discovery of any archaeological material, including human remains.
1.9 All archaeological and paleontological material becomes the property of the Province of KwaZulu-Natal and must be lodged at the repository the Institute.
1.10 That a copy of this permit is kept on the premises at all times during construction work;
1.11 FAILURE TO COMPLY WITH THESE CONDITIONS WILL RENDER ANY ACTIVITY CONDUCTED UNLAWFUL, AND THE KWAZULU-NATAL AMAFA AND RESEARCH INSTITUTE RESERVES THE RIGHT TO CANCEL THIS PERMIT AND TO INSTITUTE CRIMINAL AND/OR CIVIL ACTION AGAINST THE PERSON/S RESPONSIBLE.
1.12 The issuing of this permit does not exempt the Applicant from compliance with any other law, where applicable.