MyPermits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 50 of 107
PermitID Title Activities PermitDate PDF of Permit
59 80/12/05/008/51
05/06/2012 to 01/07/2015
61 80/12/05/009/51
06/06/2012 to 01/07/2015
90 Fairview Mine Tailing Dam - stone walling and terracing Excavation
05/09/2012 to 01/10/2013
PDF icon Permit Excavation.pdf
91 Fairview Mine Tailings Dam - test excavation for possible burials Excavation
05/09/2012 to 01/10/2013
PDF icon Permit Test Excavation.pdf
144 Lafarge Mine, Polokwane, Limpopo Province Excavation, Collection
25/10/2012 to 30/11/2013
PDF icon Permit_Lafarge.pdf
168 Fort West Iron Age site excavation, Tswhane Municipality, Gauteng Province Excavation
14/01/2013 to 31/01/2014
PDF icon Fort West Permit.pdf
187 Sasol Secunda Grave Exhumations BGG: 12/11/001/87
25/01/2013 to 31/03/2014
PDF icon Zandfontein permit.pdf
217 Ash Dump on Modderfontein 35 IR Excavation
11/03/2013 to 31/03/2014
PDF icon Westlake_Dump_Permit.pdf
388 KABUSIE ANGLO-BOER WAR (1899-1902) GRAVES EXHUMATION
01/07/2013 to 01/07/2014
PDF icon KABUSIE PERMIT.pdf
392 Destruction of the Modderfontein ash dump, Gauteng Destruction
19/07/2013 to 31/07/2014
PDF icon Permit_destruction.pdf
606 Mitigation of LIA stone walling impacted by Tubatse Switching Station Excavation
20/08/2013 to 31/08/2014
PDF icon Permit Tubatse.pdf
979 80/07/06/008/51 Excavation
13/07/2007 to 01/08/2008
PDF icon 008June07 Pelser Doornrug Colliery.pdf
984 80/07/07/004/51 Excavation, Filming
27/08/2007 to 01/09/2008
PDF icon 004July07 Pelser Ptn 30 Zwartkops 356 JR.pdf
985 80/07/07/006/51 Excavation, Collection
27/08/2007 to 01/09/2008
PDF icon 006July07 Pelser The Rest Nelspruit graves.pdf
1005 80/07/09/014/51 Collection, Excavation
14/11/2007 to 01/12/2007
PDF icon 014Sep07 Pelser Goedehoop BuReloc.pdf
1071 80/08/05/012/51 Excavation
26/06/2008 to 01/07/2009
PDF icon 012May08 Pelser A ZEE001 EIA Phase 2 excv.pdf
1101 Wonderfontein Graves Remove from its original position
29/11/2013 to 28/11/2014
1147 80/08/08/022/51 Excavation
04/12/2008 to 01/01/2010
PDF icon 022Aug08 Pelser Siyabuswa Ext D.pdf
1161 Mitigation of archaeological material uncovered during the establishment of the BRT system along Paul Kruger Street, Pretoria Excavation
10/12/2013 to 31/12/2014
PDF icon Permit_PKS.pdf
1274 Mitigation of LIA site at T15 and T17 along the Steelpoort-Tubatse-Marble Hall Powerline Upgrade Excavation
17/01/2014 to 31/01/2015
PDF icon Permit_Tubatse_T15_T17.pdf
1275 Mitigation of RDR1, 2, 4, 7 and 9 on Rooidraai 34JT, Mpumalnaga province. Excavation
24/01/2014 to 31/01/2015
PDF icon Permit_Morning_Tide.pdf
1422 80/10/03/008/51 Excavation
07/06/2010 to 01/07/2011
PDF icon 008March2010 Pelser & Lombard Sylvannia Lannex.pdf
1442 80/10/06/011/51 Destruction
20/07/2010 to 01/08/2011
PDF icon 011June2010 Pelser for Skychrome Mining destruction LIAsite.pdf
1546 80/11/03/008/51 Excavation
14/04/2011 to 01/05/2012
PDF icon 008March2011 Pelser Crown Mines historical midden Langlaagte 224IQ.pdf
1607 Vaalkop Dam Exhumation Remove from its original position
01/04/2014 to 01/04/2015
1630 80/11/09/028/51 Excavation
27/10/2011 to 01/11/2012
PDF icon 028Sep2011 Pelser Gloria Mine Bridge.pdf
1633 80/11/09/029/51 Excavation
07/10/2011 to 01/12/2012
PDF icon 029Sep2011 Pelser Hatherley 311JR Phase 2.pdf
1664 80/11/11/006/51 Excavation
20/12/2011 to 01/01/2012
PDF icon 006Nov2011 Pelser KleinZwart Bast 188 Phase 2.pdf
1673 80/11/03/008/51 Excavation
14/04/2011 to 01/05/2012
PDF icon 008March2011 Crown Mines Langlaagte Historical Midden.pdf
1682 80/11/09/028/51 Excavation
27/10/2011 to 01/11/2012
PDF icon 028Sep2011 Pelser Gloria Mine Bridge.pdf
1683 80/11/09/029/51 Excavation
07/10/2011 to 01/11/2012
PDF icon 029Sep2011 Pelser Hatherley 311JR Phase 2.pdf
1709 Erasmus Relocation Remove from its original position
24/04/2014 to 24/04/2015
1726 80/03/06/004/ 51 Excavation, Remove from its original position
13/06/2003 to 01/07/2004
PDF icon PO16June19APelserSilverLakesBurial.pdf
1840 Excavation of a Late Iron Age stone wall of Farm Leeuwvallei 297 KT Excavation
09/06/2014 to 30/06/2015
PDF icon Permit_stone_wall.pdf
1852 Excavation of an archaeological human skeleton from the Thorny Bush Lifestyle Estate Excavation
14/07/2014 to 31/07/2015
PDF icon Permit.pdf
1925 Excavation of historical midden on WIlkoppies Ext 108 holding 48, Klerksdorp, North West Excavation
17/10/2014 to 31/10/2015
PDF icon Permit Wilkoppies.pdf
1932 Marthinus Jacobus Oosthuyse & Aletta Bernhardina Oosthuyse
15/10/2014 to 15/10/2015
1933 Excavation of a LIA site affected by the expansion of Wonderkop Quarry, North West province Excavation
27/10/2014 to 31/10/2015
PDF icon Permit_Wonderkop.pdf
1942 Grave relocation Chloorkop South, Gauteng Remove from its original position
12/11/2014 to 12/11/2015
1967 Masiza Townhsip (CE7) Development Graves Exhumation Remove from its original position
23/01/2015 to 25/01/2016
1990 Moabsvelden 248IR Leeuwpan Colliery Grave Relocations Remove from its original position
23/02/2015 to 25/02/2016
1994 Beeshoek Mine Village Graves Remove from its original position
04/03/2015 to 04/03/2016
1996 Extension permit: Wonderfontein Graves Remove from its original position
06/03/2015 to 07/03/2016
PDF icon Wonderfontein permit sahra.pdf
2016 Samy's Wholesalers Extension Test Excavation
10/04/2015 to 29/04/2016
2062 Phase 2 Archaeological Mitigation for the Proposed Topigs SA Merino Piggery Project on Excavation
29/07/2015 to 31/07/2016
PDF icon Permit 2026.pdf
2072 Olifantsfontein Black Concentration Camp grave yard Test Excavation
11/08/2015 to 11/08/2016
2226 Permit Extension 2: Wonderfontein Graves Remove from its original position
12/04/2016 to 12/04/2017
2263 Vaalbult Exhumations Remove from its original position
09/06/2016 to 09/06/2017
2288 Grasspan Colliery Exhumation Remove from its original position
22/06/2016 to 22/06/2017
2293 Edenville Grave Exhumation and Relocation Remove from its original position
22/06/2016 to 22/06/2017

Pages

 
 

Search form