MyProjects

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 501 - 550 of 19859
CaseID CaseReference ApplicationDate Status
22232 EIA176PR - Morgenson Mining CC - Farm 102 25/08/2023 Closed (Approved)
22231 Proposed Alterations and Additions at 40 Eastbourne Road, Morningside 25/08/2023 On Agenda
22226 N’Komati Anthracite Mine - Integrated Environmental Authorisation for Open Cast Mining Areas and Expansion of the Madadeni Underground Area and EMPr Consolidation & Amendment 24/08/2023 Studies Pending
22225 Additions and alterations to 96 Nirvana Road, Brighton Beach 24/08/2023 SUBMITTED
22222 Klipplaatdrift 224 24/08/2023 Studies Pending
22221 PROPOSED POWERLINE IN DONDOTHA S1 AREA MFOLOZI LOCAL MUNICIPALITY UTHUNBULU DISTRICT MUNICIPALITY 24/08/2023 SUBMITTED
22220 643390710 - Mr MAKONI ROBERT 24/08/2023 DRAFT
22219 M Chrome Iron Steel (Pty) Ltd have applied for an Environmental Authorisation for Prospecting Right on portion of the remaining extent of the farm 125 and 131. 24/08/2023 Pending & Under Assessment
22217 The proposed Amersfoort Solar Power Plant near Amersfoort, Mpumalanga Province 24/08/2023 DRAFT
22215 The Proposed Welanga Solar Photovoltaic Solar Energy Facility and Grid Connection Infrastructure near Charl Cilliers, Mpumalanga Province 23/08/2023 Studies Pending
21723 Proposed Demolition of existing dwelling at 627 & 629 Marine Drive, Bluff, Durban 23/08/2023 SUBMITTED
22214 KANANA HIA 23/08/2023 Returned to Applicant
22213 2023 Export of Samples for Geological Analysis and Dating from Kathu Pan 22/08/2023 Returned to Applicant
22212 LUSHABA TO MALUNGA ACCESS ROAD 22/08/2023 Closed (Approved)
22211 Upgrade of the uMtamvuna Water Treatment Works Infrastructure 22/08/2023 DRAFT
22210 Unauthorised Additions and Alterations to 25/25A Paisley Road, Mobeni East, Durban, 4060 22/08/2023 Closed (Approved)
22209 THE PROPOSED REHABILITATION OF THE OLD TUG JETTY SHEET PILE WALL AT THE PORT OF PORT ELIZABETH, WITHIN NELSON MANDELA BAY METROPOLITAN MUNICIPALITY IN THE EASTERN CAPE PROVINCE 22/08/2023 Studies Pending
22208 Proposed Concrete Tower Manufacturing and Precast Facility (CTMPF) and associated infrastructure to service the authorised Sutherland Cluster Wind Energy Facilities in the Namakwa District Municipality, Northern Cape Province. 22/08/2023 DRAFT
22207 Proposes Alteration and Additions to existing house at 23 Dorrington Crescent, Durban North 22/08/2023 Closed (Approved)
22206 Alteration to Bloukrans Monument Site 22/08/2023 Closed (Approved)
22205 NW30/5/1/1/2/13707PR 22/08/2023 DRAFT
22204 Basic Assessment for the decommissioning of the historical Burnt Sludge Dams, Bag Filter Dust Stockpiles and General Waste Dump at Metalloys, Meyerton, Gauteng 22/08/2023 SUBMITTED
22201 24 Kenneth Kaunda 21/08/2023 Closed (Approved)
22200 Paledi Ext 2 21/08/2023 Closed (Approved)
22199 83 Jan Hofmeyr Road - alterations & additions 21/08/2023 Closed (Approved)
22198 45 INGCUCE STREET, 21/08/2023 Closed (Approved)
22197 NW30/5/1/3/2/11132 MP Taung 19/08/2023 Studies Pending
22196 Proposed Construction of a new 4060m gravel road between the villages of Amabengela and Matshenezimpisi 18/08/2023 Closed (Approved)
22194 Rural Housing Project within Mhlabashane 18/08/2023 SUBMITTED
22193 Tarlton Matshelapata Proposed 11kv Powerline Spanning Over Graves. 18/08/2023 SUBMITTED
22190 Qwabi S24G 18/08/2023 Studies Submitted
22189 PROPOSED POWERLINE IN NKWALENI 16921-GU 18/08/2023 SUBMITTED
22188 PROPOSED POWERLINE IN HLUHLUWE -OPHONDWENI 18/08/2023 SUBMITTED
22187 PROPOSED POWERLINE IN HLUHLUWE DUKUMBANE 18/08/2023 SUBMITTED
22186 Amended - Radiocarbon dating of faunal material from Spitzkloof D rockshelter 2023 17/08/2023 SUBMITTED
22185 Proposed Water Pipeline to the Bhobhoyi WTW 17/08/2023 On Agenda
22184 Unauthorized Alterations and Additions to 39 Grosvenor Crescent, Durban North 17/08/2023 Closed (Approved)
22180 Development of the Bultfontein MainTransmission Substation (up to 400kV) and Overhead Powerline (275kV or 400kV) to support the Bultfontein Cluster of Solar Photovoltaic (PV) facilities located near Bultfontein in the Free State 17/08/2023 DRAFT
22179 Jeff Dickinson 17/08/2023 SUBMITTED
22178 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 160MW Kganya Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT
22177 Camden II Wind Energy Facility (WEF) up to 132kV overhead powerline 17/08/2023 DRAFT
22176 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 100MW Kabelo Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT
22175 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 100MW Letsha Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT
22174 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 100MW Mohlolo Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT
22173 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 100MW Diboko Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT
22172 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 100MW Sungazer Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT
22171 Rhovan Iron Age Site 17/08/2023 DRAFT
22170 Development of the 132kV Overhead Powerline, 132 kV Eskom portion of the on-site substation and associated infrastructure to support the 100MW Kamva Photovoltaic (PV) Facility, near the town of Bultfontein in the Free State Province. 17/08/2023 DRAFT