MyReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 50 of 18975
ReportRefsort descending ReportDate ReportFile
SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE 19/10/2022 PDF icon Archaetnos BH - Nchwaning 3 HIA exemption .pdf
A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE 05/11/2019 PDF icon REPORT 01954V BMRO Railway Bridge II.pdf
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) 15/11/2015 PDF icon HIA and PIA for Komsberg EAST and WEST WEFs and GRID CONNECTIONS.pdf
Phase 1 Cultural Heritage Impact Assessment: 01/06/2020 PDF icon 2019JvS068Rietvlei.pdf
Phase 2 Study PIA 27/08/2019 PDF icon IDS6002_PIA_190828.pdf
(HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP 07/07/2021 PDF icon Weltevreden HIA ZEERUST.pdf
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION 06/06/2009 PDF icon Pilanesberg Platinum RWD extension.pdf
281 Retief Street Pietermaritzburg 26/09/2023
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT 10/03/2020 PDF icon APPENDIX C5-HIA Dorstfontein 2020 -Final.pdf
ARCHAEOLOGICAL SURVEY 10/07/2019 PDF icon APPENDIX F Heritage Report.pdf
Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. 19/06/2017 PDF icon Substation and 132kV Powerline - Heilbron (via Frankfort) to Villiers .pdf, PDF icon PIA: Proposed Frankfort-Windfield 88kV Powerline, Free State
Croydon/Germiston River Crossings HIA 15/12/2017 PDF icon HIA Croydon Rivers Crossings.pdf
EIA FOR CSP IN BOKPOORT, NORTHERN CAPE 06/03/2018 PDF icon Heritage Statement Report, PDF icon Heritage Report
Erf 924, Bo-Kaap 03/10/2013
ERG6028 - Project Status and Close-out Memo 29/05/2023 PDF icon ERG6028 - Project Status and Close-out Memo
Golden Mole Mall - PTA east - Phase 1 AIA_v1 12/11/2021 PDF icon Golden Mole Mall - PTA east - Phase 1 AIA.pdf
Heritage Impact Assessment & Palaeontological Desktop Assessment 27/05/2021 PDF icon 15. AppE - Heritage Impact Assessment and Palaeontological Desktop Assessment.pdf
Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province 09/11/2022 PDF icon HIA SW8X1 Draft (3).pdf
Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality 18/11/2022 PDF icon Heritage Impact Assessment Palm Ridge (1).pdf
Heritage Impact Assessment for the Proposed Residential Township Establishment to be known as Erand Gardens Ext 125, Gauteng Province 21/02/2022 PDF icon Heritage Impact Assessment Erand Gardens Ext 125 Draft report.pdf
Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province 06/04/2022 PDF icon 10 Appendix E5 Heritage Impact Assessment Roan 1.pdf
HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA 28/01/2015 PDF icon Application for HIA Exemption mVutshini Pipeline 28 January 2015.pdf
Heritage input optimised layout 28/04/2022 PDF icon SE2602 Wind Garden App S6 - Heritage input optimised layout.pdf
Heritage input optimised layout 28/04/2022 PDF icon SE2602 Fronteer App S6 - Heritage input optimised layout.pdf
Heritage Report For Popo Molefe 25/08/2020 PDF icon Heritage studies.pdf
HIA 01/05/2018 PDF icon PHASE 1 HIA FOR MINING RIGHT APPLICATION PTN 1 KLEINZUIKERBOSCHPLAAT 5IS APAC01829.pdf, PDF icon MANAGEMENT PLAN FOR ORGIES GRAVES.pdf
HIA Borrow Pit 12 02/09/2019 PDF icon GBOX Dithakong BP12 HIA 1.0.pdf
HIA Caledon Wind Farm 01/10/2011 PDF icon CASE 1731 HIA Caledon Wind Farm Heritage_Final.pdf
HIA De Kleine Oliphantskop 1481 01/03/2009 PDF icon CASE 355 De kleine Olifantskop 1481.pdf
HIA Exemption for Sugar Cane Agricultural Development by Senekal Boerdery near Mkuze 28/01/2015 PDF icon Application for HIA Exemption Senekal Cane 28 Jan 2015_2.pdf
HIA for In-situ Rural Subsidised Housing Project , Qadi Ward 8, Maphumulo 08/08/2014 PDF icon Qadi Housing Project HIA
HIA Gonubie Filling Station 20/02/2022 PDF icon Gonubie_Filling_Station- HIA - KanteyTempler.pdf
INGLESBY 580 OLIFANTSHOEK, 10/05/2014 PDF icon REPORT OLIFANTSHOEK INGLESBY 580 PROSPECTING RE A KGONA 2014 1.pdf
IXOPO RENEWAL ENERGY PLANT 23/06/2016 PDF icon REPORT 01637V Ixopo HIA.pdf
Kudu Solar Facility 5 Heritage Scoping Report 18/08/2022 PDF icon Heritage Scoping_Kudu Solar 5
Lebone Solar Farm - HIA 17/10/2013 PDF icon Phase 1 AIA for the proposed Lebone Solar Farm Development, Welkom, Free State Province., PDF icon Palaeontological Assessment for the proposed Lebone Solar Farm Development, Welkom, Free State Province.
Lougot Logistics Industrial Park, Cato Ridge 14/10/2014 PDF icon Lougot Industrial Park Phase 1 HIA report 14 October 2014.pdf
M1562 Oribi Gorge Dams Heritage Screener 28/07/2015 PDF icon M1562 Oribi Gorge Dam Heritage Screener
Moletjie Grave Rescue Project 20/07/2015 PDF icon Report - Rescue Exhumation of a Human Skeleton (Moletjie).pdf
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. 16/03/2022 PDF icon Heritage Impact Assessment Report_ Murunwa Telemast.pdf
Nzalo DBAR Heritage Report 21/02/2014 PDF icon Nzalo+Heritage.pdf
Olievenhoutpoort 01/04/2017 PDF icon evaluation of structure, PDF icon photographic record as part of phase 2, PDF icon View1, PDF icon View
Palmietfontein_Ventersdorp_AIA_Revised+desktop 22/02/2020 PDF icon Jomela Consulting - Palmietfontein_Ventersdorp_AIA_Revised+desktop.pdf
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT 09/12/2021 PDF icon PHASE 1 HIA RIETVLEI EXTENSION 24 APAC02166 - Dec21.pdf
PROPOSED KHULU TSF PROJECT ARCHAEOLOGICAL SITE SELECTION REPORT 01/06/2021 PDF icon Dwarsrivier Site Selection Report.pdf
PROPOSED KHULU TSF PROJECT HERITAGE SCOPING REPORT 18/06/2021 PDF icon Dwarsrivier TSF and additional infrastructure Heritage Scoping Draft Report.pdf
Proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid 12/05/2016 PDF icon C.7_HIA.pdf
REMAINING EXTENT OF FARM FAIRFIELD 520, HAY DISTRICT 12/02/2013 PDF icon De Beers Block C Fairfield AIA Feb 2013_Combined.pdf
ROODEPOORT COLLIERY ARCHAEOLOGICAL IMPACT ASSESSMENT 27/01/2021 PDF icon Report 02103V Roodepoort AIA.pdf
Rustfontein Dam WTW facility HIA 21/03/2015 PDF icon Rustfontein Dam WTW

Pages

 
 

Search form