THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 5701 - 5750 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA for the Proposed Refurbishment Actions at MacBeef Abattoir and Feedlot | Heritage Impact Assessment for the Proposed Refurbishment Actions at Mac Beef Abattoir and Feedlot located on the Farm Leeukuil 691- LS Portions 70, 85, 86, 87, 114, 122 & 123 in the Polokwane Local Municipality, Capricorn District of the Limpopo Province. | HIA Phase 1 | 27/02/2019 | Stephan Gaigher | G&A Heritage Management Consultants | Tekplan Environmental | 05/03/2019 - 12:24 |
Phase 1 Heritage Impact Assessment of an existing feedlot on the farm Wanga Nella 994 near Aliwal North, FS Province. | Phase 1 Heritage Impact Assessment of an existing feedlot on the farm Wanga Nella 994 near Aliwal North, FS Province. | HIA Phase 1 | 24/01/2019 | Lloyd Rossouw | SAHRA Council | Paleo Field Services | 05/03/2019 - 11:23 |
NOM5486 - NDA | Need and Desirability Application Form - Nomalanga Estates Expansion Project | Heritage Impact Assessment Specialist Reports | 04/03/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Nomalanga Property Holdings (Pty) Ltd | 04/03/2019 - 16:07 |
umdloti sands | HERITAGE SURVEY OF THE UMDLOTI SANDS DEVELOPMENT, UMDLOTI, KWAZULU-NATAL | HIA Phase 1 | 22/02/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 04/03/2019 - 15:18 |
METISS Terrestrial Fibre Optic Cable System | Application for Heritage Impact Assessment Letter of Exemption for the METISS Terrestrial Fibre Optic Cable System, Amanzimtoti, Ethekwini Municipality, Kwazulu-Natal | HIA Letter of Exemption | 04/03/2019 | John Gribble | ACO Associates CC | Environmental Resources Management | 04/03/2019 - 13:48 |
Mopye HIA | PROPOSED UPGRADING OF AN EXISTING GRAVEL ROAD ON THE REM PORTION OF THE FARM MODJADJIS 424-LT, BOLUBEDU AREA, LIMPOPO PROVINCE | HIA Phase 1 | 11/02/2019 | Frans Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 04/03/2019 - 12:44 |
Heritage Impact Assessment for Henley Booysen | Phase 1 Heritage Impact Assessment report on the farm Eureka 200 near Kimberley, Frances Baard District Municipality, Northern Cape Province. | HIA Phase 1 | 04/04/2019 | Peter Beaumont | EnviroServ | 04/03/2019 - 12:36 | |
HERITAGE IMPACT ASSESSMENT | HERITAGE IMPACT ASSESSMENT: Proposed Grid Connection Infrastructure (GCI) on Konkoonsies 91/2/rem, 91/5, 91/6 and Scuit Klip 92/1 near Pofadder, in the Khaî-Ma Local Municipality | HIA Phase 1 | 28/02/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | GAEA ENVIRO PTY LTD | 04/03/2019 - 11:09 |
Waterloo mitigation final permit report | FINAL ARCHAEOLOGICAL MITIGATION REPORT, WATERLOO 992-IN: VRYBURG, NORTHWEST PROVINCE | Archaeological Permit Report | 27/02/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | 04/03/2019 - 10:53 | |
Spatialisation of Makahane | FINAL REPORT ON THE SPATIAL DOCUMENTATION OF THE MAKAHANE ARCHAEOLOGICAL SITE IN THE KRUGERNATIONAL PARK, 2231AC MABYENI | Archaeological Permit Report | 01/01/2018 | Annie van de Venter Radford | African Conservation Trust | SANParks | 04/03/2019 - 10:37 |
HERITAGE IMPACT ASSESSMENT | Proposed Grid Connection Infrastructure (GCI) on Konkoonsies 91/2/rem, 91/5, 91/6 and Scuit Klip 92/1 near Pofadder, in the Khaî-Ma Local Municipality.SAHRA Case No: 12583. Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 28/02/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | GAEA ENVIRO PTY LTD | 04/03/2019 - 10:15 |
Klaarwater HIA | Heritage Impact Assessment of Klaarwater Station Housing Project, eThekwini, KwaZulu-Natal, South Africa | HIA Phase 1 | 16/01/2009 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | Balanced Environment | 01/03/2019 - 15:46 |
Palaeontological Desktop Assessment - Kriel PS Lime Plant 22.02.19 | Palaeontological Desktop Assessment of the Proposed Kriel Power Statiopn Lime Plant Upgrade, Mpumalanga Province | Elize Butler | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 28/02/2019 - 15:20 | ||
Heritage Exemption - Kriel PS Lime Plant 22.02.19 | Exemption from a Heritage Impact Study: Kriel Power Station Lime PLan Upgrade Project, Kriel, Emalahleni Local Municipality, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 22/02/2019 | Andrew Salomon | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 28/02/2019 - 15:13 |
Comment for PIA - Lichtenburg PVs 25.02.19 | Final Comment PIA for three proposed PV projects near Lichtenburg, Northwest Province | 25/02/2019 | Marion Bamford | Prof Marion Bamford | 28/02/2019 - 14:13 | ||
PIA - Lichtenburg PVs 25.02.19 | Palaeontological Impact Assessment for Three Proposed PV Projects near Lichtenburg, North West Province | Palaeontological Specialist Reports | 25/02/2019 | Marion Bamford | Prof Marion Bamford | CTS Heritage | 28/02/2019 - 14:11 |
Palaeontological Impact Assessment for Kimswa Mining (Pty) Ltd | Palaeontological Impact Assessment for the proposed Mining Right on a piece of State Land at Delportshoop on the Northern Bank of the Vaal River (5ha), Barkly West Northern Cape Province. | PIA Phase 1 | 28/03/2019 | Marion Bamford | AHSA | 28/02/2019 - 13:20 | |
Heritage Impact Assessment for Wepex Trading (Pty) Ltd | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE | HIA Phase 1 | 28/03/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 28/02/2019 - 12:02 | |
Kathu Extensions 6 to 10 Desktop PIA | DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT Kathu Extensions 6-10 Township development in Gamagara Local Municipality | PIA Desktop | 16/02/2019 | Bruce Rubidge | University of the Witwatersrand - Evolutionary Studies Institute | Maxim Planning Solutions | 27/02/2019 - 19:37 |
AN AMENDED PHASE 1 HIA REPORT REPORT FOR THE LEEUWPAN COLLIERY | AN AMENDED PHASE 1 HIA REPORT FOR THE LEEUWPAN COLLIERY NEAR DELMAS AND THE RECORDING AND DOCUMENTATION OF GRAVES AND GRAVE SITES THAT WILL BE IMPACTED BY EXPANDING MINING OPERATIONS AT LEEUWPAN - APAC018/77 | Heritage Impact Assessment Specialist Reports | 01/11/2018 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Synergistics Environmental Services | 27/02/2019 - 17:52 |
Heritage Impact Assessment for Wepex Trading (Pty) Ltd | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE | HIA Phase 1 | 27/03/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 27/02/2019 - 13:50 | |
PHASE 1 HIA REPORT FOR A PROPOSED FILLING STATION (RIETVLEI EXTENSION 6) | PHASE 1 HIA REPORT FOR A PROPOSED FILLING STATION (RIETVLEI EXTENSION 6) ON THE REMAININNG PORTION OF PORTION 1 OF THE FARM WITKOPPIES 393JR EAST OF THE RIETVLEIDAM NATURE RESERVE, CITY OF TSHWANE, GAUTENG - APAC019/17 | HIA Phase 1 | 23/02/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Bokamoso Environmental Consultants | 27/02/2019 - 13:05 |
Heritage Impact Assessment for Wepex Trading (Pty) Ltd | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 19/01/2018 | Prof. Anton van Vollenhoven | Archaetnos CC | Archaetnos Culture & Cultural Resource Consultants | 27/02/2019 - 12:56 |
Heritage Impact Assessment for Kimswa Mining (Pty) Ltd | Phase 1 Heritage Impact Assessment (Including Palaeontological Assessment) Requested in terms of Sectoin 38 of the National Heritage Resources Act (No 25/1999) for a mining permit on a piece of state land at Gong Gong on the Northern Bank of the Vaal River in the magisterial district of barkly west, northern cape province. | HIA Phase 1 | 27/03/2019 | Edward Matenga | AHSA | 27/02/2019 - 12:48 | |
Palaeontological Impact Assessment for Kimswa Mining (Pty) Ltd | Palaeontological Impact Assessment for the proposed mining right on a Portion of the Pniel 281 and the Vaal Riverside, Barkly West, Northern Cape Province | PIA Phase 1 | 27/03/2019 | Marion Bamford | AHSA | 27/02/2019 - 12:32 | |
Heritage Impact Assessment for Kimswa Mining (Pty) Ltd | Phase 1 Heritage Impact Assessment (Including Palaeontological Assessment) requested in terms of section 38 of the National Heritage Resources act (No 25/1999) for a mining permit on A Portion of the remainder of Pniel 218 and A portion of the Vaal river at Gong Gong on the Southern bank of the Vaal river in Barkly west District, Northern Cape Province. | HIA Phase 1 | 27/03/2019 | Edward Matenga | AHSA | 27/02/2019 - 12:24 | |
HIA - Allepad PV Three (Feb'19) | Heritage Impact Assessment for the Proposed Development of Allepad PV Three, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 26/02/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 27/02/2019 - 11:18 |
HIA - Allepad PV One (Feb'19) | Heritage Impact Assessment for the Proposed Development of Allepad PV One, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 26/02/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 27/02/2019 - 11:17 |
HIA - Allepad PV Two (Feb'19) | Heritage Impact Assessment for the Proposed Development of Allepad PV Two, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 26/02/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 27/02/2019 - 11:17 |
HIA - Allepad PV Four (Feb'19) | Heritage Impact Assessment for the Proposed Development of Allepad PV Four, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 26/02/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 27/02/2019 - 11:17 |
Phase I HIA study for the proposed VDDC mining infrastructure development | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED VANDYKSDRIFT CENTRAL (VDDC) MINING INFRASTRUCTURAL DEVELOPMENT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 11/08/2018 | Julius CC Pistorius | 26/02/2019 - 14:41 | ||
Jagersfontein Prospecting Right Phase 1 HIA | Phase 1 Heritage Impact Assessment Report - Desktop and field based Heritage Impact Assessment for the prospecting right application for the Remainder, Portion 1 and 16 of the farm Jagersfontein 14, Xhariep District, Free State. | HIA Phase 1 | 21/02/2019 | Stephan Gaigher | G&A Heritage Management Consultants | G&A Heritage Management Consultants | 26/02/2019 - 13:06 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 Archaeological Impact Assessment for the proposed Gulf service station on ERF 10742, Umhlathuze Village, Empangeni, KwaZulu-Natal | AIA Phase 1 | 13/01/2019 | Tobias Coetzee | Tobias Coetzee | 26/02/2019 - 09:39 | |
Zuikerbosfontein 151 IQ Application 2 | Phase 1 Archaeological Impact Assessment for Proposed Prospecting with bulk sampling on Portion 4,6&10 of the Farm Zuikerbosfontein 151 IQ , Portion 6 & 7 of the Farm Golden Valley 621 IQ and Portion 2,27-29,33,34,36,40-44 of the Farm Koesterfontein 45 IQ, Portion 2&3 of the Farm Migalsood 152 IQ, and Portion 2 of the Farm Vaalbank 512 IQ (Application 2) located in the Magisterial District of Krugersdorp in Gauteng Province | AIA Phase 1 | 28/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 15:09 |
AIA Zuikerbosfontein 151 Q Application 2 | Phase 1 Archaeological Impact Assessment report for Proposed Prospecting with bulk sampling on Portion 4,6&10 of the Farm Zuikerbosfontein 151 IQ , Portion 6 & 7 of the Farm Golden Valley 621 IQ and Portion 2,27-29,33,34,36,40-44 of the Farm Koesterfontein 45 IQ, Portion 2&3 of the Farm Migalsood 152 IQ, and Portion 2 of the Farm Vaalbank 512 IQ (Application 2) located in the Magisterial District of Krugersdorp in Gauteng Province | AIA Phase 1 | 28/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 14:59 |
Kaalfontein 44 IQ Application 3 | Phase AIA for proposed prospecting right application with bulk sampling on Ptn 2,9,12,14,27,29,30,37,38,39 of the farm Kaalfontein 44IQ and Ptn 1, 3-6,9,13,19,20,25,30-32, ,35,37-39,45of the farm Koesterfontein 45 IQ situated in the Magisterial District of Krugersdorp in Gauteng Province. | AIA Phase 1 | 23/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 14:13 |
Portion 4, Farm Zuurwater No 62 Archaeological Specialist Study | Proposed development of a new haul road at Black Mountain Mine, near Aggeneys in the Northern Cape Province | Archaeological Specialist Reports | 18/02/2019 | Cedar Tower Services | Cedar Tower Services | 22/02/2019 - 13:21 | |
AIA for Prospecting Right Application on Ptn 11 and 22 of the Farm Koesterfontein 45 IQ | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR PROPOSED PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON PORTION 11 AND 22 OF THE FARM KOESTERFONTEIN 45 IQ IN THE MOGALE CITY LOCAL MUNICIPALITY OF GAUTENG PROVINCE | AIA Phase 1 | 18/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 11:59 |
AIA for Prospecting Right Application on Ptn 11 and 22 of the Farm Koesterfontein 45 IQ | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR PROPOSED PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON PORTION 11 AND 22 OF THE FARM KOESTERFONTEIN 45 IQ IN THE MOGALE CITY LOCAL MUNICIPALITY OF GAUTENG PROVINCE | AIA Phase 1 | 18/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 11:53 |
AIA for Prospecting Right Application on Ptn 11 and 22 of the Farm Koesterfontein 45 IQ | AIA Report for proposed prospecting right application with bulk sampling on Portion 11 and 22 of the Farm Koesterfontein 45 IQ in Mogale City Local Municipality, Gauteng Province | AIA Phase 1 | 18/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 11:41 |
AIA for Prospecting Right Application on Ptn 11 and 22 of the Farm Koesterfontein 45 IQ | Phase 1 AIA Report for proposed Prospecting Right Application with bulk sampling on Portion 11 and 22 of the Farm Koesterfontein 45 IQ in the Mogale City Local Municipality, Gauteng Province | AIA Phase 1 | 18/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 11:02 |
The Duel HIA | The Duel Coal Mine Heritage Impact Assessment | HIA Phase 1 | 04/01/2016 | Frans Roodt | Jacana Environmental cc | 21/02/2019 - 15:28 | |
Amended_19 report | Heritage Scoping | 21/02/2019 - 15:25 | |||||
Hesters Rust Cultural Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Amendment of an Existing Environmental Authorisation for an Existing Mining Right of Corobrik (Pty) Ltd (Odendaalsrus Factory) on the Farm Hesters Rust 29, near Welkom, Matjhabeng Local Municipality and Lejweleputswa District Municipality, Free State Province | HIA Phase 1 | 16/01/2019 | Francois Coetzee | 21/02/2019 - 12:48 | ||
Paulputs HIA | HERITAGE IMPACT ASSESSMENT: PROPOSED PAULPUTS WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION NEAR POFADDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE PALAEONTOLOGICAL HERITAGE ASSESSMENT: DESKTOP STUDY PROPOSED PAULPUTS WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION NEAR POFADDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 09/07/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Arcus Consulting | 21/02/2019 - 09:55 |
HIA Scoping | HERITAGE IMPACT ASSESSMENT: PROPOSED PAULPUTS WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION NEAR POFADDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE SCOPING PHASE | Heritage Scoping | 28/01/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Arcus Consulting | 21/02/2019 - 09:30 |
HIA Report_Alan Manor Water Pipeline | Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT AND UPGRADE OF WATER RETICULATION PIPELINES ALONG A NUMBER OF STREETS IN ALAN MANOR, JOHANNESBURG SOUTH, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 20/01/2019 | Johan van Schalkwyk | 21/02/2019 - 09:01 | ||
RBM 2018 | The Archaeological Surveys and Excavations of the Zulti North Mining Lease 2018 | Archaeological Permit Report | 06/02/2019 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | 20/02/2019 - 19:01 |
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED 300 MW PHOTOVOLTAIC ELECTRICITY GENERATION FACILITY & ASSOCIATED 132 kV POWER LINE ON PORTIONS 6 AND 3 OF FARM 187 OLYVENKOLK, KENHARDT DISTRICT, NORTHERN CAPE John E. Almond PhD (Cantab.) Natura Viva cc, PO Box 12410 Mill Street, Cape Town 8010, RSA naturaviva@universe.co.za September 2018 | PIA Desktop | 01/09/2018 | John E. Almond | Natura Viva CC | Solar Energy Land (Pty) Ltd | 19/02/2019 - 16:21 |
HERITAGE IMPACT ASSESSMENT: PROPOSED 300 MW PHOTOVOLTAIC FACILITY AND POWER LINE ON OLYVEN KOLK 187/3, 187/6 & 187/7, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | HERITAGE IMPACT ASSESSMENT: PROPOSED 300 MW PHOTOVOLTAIC FACILITY AND POWER LINE ON OLYVEN KOLK 187/3, 187/6 & 187/7, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999). SAHRA Case No.: 11247 Dr Jayson Orton ASHA Consulting (Pty) Ltd 40 Brassie Street, Lakeside, 7945 Tel: (021) 789 0327 | 083 272 3225 Email: jayson@asha-consulting.co.za 1st draft: 28 September 2018 | HIA Phase 1 | 28/09/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Solar Energy Land (Pty) Ltd | 19/02/2019 - 16:17 |