THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 6551 - 6600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Winchmore Dam heritage Assessment | Winchmore Dam heritage Assessment (phase 1) | HIA Phase 1 | 01/03/2018 | Frans Prins | Active Heritage CC | Enviroedge | 25/05/2018 - 12:53 | |
AIA; Proposed Housing Development, Stillbaai | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED HOUSING DEVELOPMENT ON PORTION 30 OF THE FARM PLATTEBOSCH 485 STILLBAAI | AIA Phase 1 | 01/02/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | Pieter Badenhorst Professional Services | 25/05/2018 - 08:15 | |
Exemption from Phase 1 HIA Lacey Road housing development | Exemption for Exemption from undertaking a Phase 1 HIA, Lacey Road housing development, Overport, eThekwini Municipality | HIA Letter of Exemption | 21/05/2018 | Jean Beater | JLB Consulting | ECA CONSULTING | 24/05/2018 - 19:23 | |
Phase 1 Cultural Heritage Impact Assessment-Firham Platrand | Phase 1 Cultural Heritage Impact Assessment for the Proposed Firham-Platrand 88kV Powerline Deviation, Standerton Region. | HIA Phase 1 | 01/11/2017 | JA van Schalkwyk Heritage Consultant | 24/05/2018 - 16:32 | |||
HIA for Content 1167, Bloemfontein | Heritage Impact Assessment for a portion of the Remaining Extent of the farm Content 1167, Magisterial District of Bloemfontein, Free State Province. | HIA Phase 1 | 17/04/2018 | Lloyd Rossouw | National Museum Bloemfontein - Archaeology and Anthropology | Hatari Big Game Safari's CC | 24/05/2018 - 16:05 | |
PIA; Proposed Wind Farm, Still Bay | PALAEONTOLOGICAL SPECIALIST STUDY: DESKTOP ASSESSMENT Proposed Lunsklip Wind Farm on farms Melkoutefontein 480 (Portion 135), Holvlei 630 (Remainders 2 and 3), Luinsklip 472 (Remainder portions 7, 2, 25) and Luinsklip 626, Still Bay, Western Cape | PIA Desktop | 01/08/2012 | John Almond | Natura Viva CC | Bergwind Energy | 24/05/2018 - 14:08 | |
GWALA FARM | PROPOSED GWALA FARM SEWERAGE INFRASTRUCTURE PROJECT, TONGAAT, KWAZULU-NATAL | HIA Phase 1 | 30/06/2017 | Jean Beater | JLB Consulting | ECA CONSULTING | 24/05/2018 - 09:38 | |
HIA; Proposed Low Water Crossing, Herbertsdale, Riversdale and Mossel Bay | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED LOW WATER CROSSING OVER THE GOURITZ RIVER NEAR HERBERTSDALE, RIVERSDALE AND MOSSEL BAY MAGISTERIAL DISTRICTS, WESTERN CAPE | HIA Phase 1 | 14/03/2012 | Jayson Orton | ACO Associates CC | CCA ENVIRONMENTAL (Pty) Ltd | 24/05/2018 - 07:47 | |
GCS5027 Heritage Impact Assessment | Heritage Impact Assessment: Environmental Impact Assessment for the Newcastle Landfill Project | HIA Phase 1 | 21/05/2018 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Newcastle Municipality | 21/05/2018 - 18:40 | |
HIA: Eshowe Cemetery | Heritage Impact Assessment for the Proposed Expansion of the Eshowe Cemetery in the uMlalazi Local and uThungulu District Municipalities, KwaZulu Natal. | 02/02/2018 | Stephan Gaigher | G&A Heritage Management Consultants | Ecosphere | 21/05/2018 - 17:30 | ||
Desktop PIA, Wind Energy Facility, Oliphant's River Farm, near Koekenaap | PALAEONTOLOGICAL IMPACT ASSESSMENT (Desktop Study): PROPOSED PLAN 8 INFINITE ENERGY (PTY) LTD WIND ENERGY FACILITY ON THE OLIPHANT’S RIVER FARM (REMAINDER OF FARM 629), NEAR KOEKENAAP, WESTERN CAPE | PIA Desktop | 16/09/2011 | John Pether | Aurecon South Africa (Pty) Ltd | Plan 8 Infinite Energy (Pty) Ltd | CTS_504137 | 21/05/2018 - 14:41 |
AIA; Proposed Development, Cape Infantia | AN ARCHAEOLOGICAL IMPACT ASSESSMENT OF PROPOSED DEVELOPMENT ON ERF 134, CAPE INFANTA | HIA Phase 1 | 01/08/2010 | David Halkett | ACO Associates CC | Nicolas Baumann Urban Conservation and Planning | 21/05/2018 - 11:06 | |
HIA; Borrow Pit - DR01599, George | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR 01599 Near George in the Eden District Municipality, Western Cape. | HIA Phase 1 | 29/10/2012 | Quahnita Samie, Madelon Tusenius | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 10:47 | |
HIA; Borrow Pit - MR0401, Uniondale | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along MR 0401 Near Uniondale, Eden District Municipality. | HIA Phase 1 | 27/08/2014 | Quahnita Samie, John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 10:27 | |
HIA; Borrow Pit - MR356, Vanwyksdorp | Heritage Impact Assessment for an Existing Borrow Pit Located Along MR 356 Approximately km 4.4 Southeast of Vanwyksdorp in Eden District Municipality, Western Cape. | HIA Phase 1 | 28/05/2014 | Quahnita Samie, John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 10:12 | |
HIA; Borrow Pit - MR355, North of Swartvlei and Rondevlei | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along MR 355, North of Swartvlei and Rondevlei, Eden District Municipality, Western Cape | HIA Phase 1 | 27/11/2013 | Quahnita Samie, Madelon Tusenius | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 09:57 | |
HIA; Borrow Pit - OP4963, Albertinia | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along OP 4963 Near Albertinia in the Eden District Municipality, Western Cape. | HIA Phase 1 | 29/10/2012 | Madelon Tusenius | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 09:41 | |
HIA; Borrow Pit - MR00356, Ladismith | Heritage Impact Assessment for a Proposed Borrow Pit Located Along MR 00356 Approximately 12.2 km South of Ladismith in the Eden District Municipality, Western Cape. | HIA Phase 1 | 27/02/2013 | John Almond, Madelon Tusenius | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 09:28 | |
HIA; Borrow Pit - DR01664, Vanwyksdorp | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR01664 Approximately 12.75 West of Vanwyksdorp in Eden District Municipality, Western Cape. | HIA Phase 1 | 27/02/2013 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 09:11 | |
HIA; Borrow Pit - TR00102 | Heritage Impact Assessment for a Expansion of an Existing Borrow Pit Located Along Trunk Road 00102 Approximately 30 km Southeast of Oudtshoorn in Eden District Municipality, Western Cape. | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:58 | |
HIA; Borrow Pit - DR1650, Uniondale | Heritage Impact Assessment for a Expansion of an Existing Borrow Pit Located Along Divisional Road 1650 Approximately 40 km Southwest of Uniondale in Eden District Municipality, Western Cape | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:47 | |
HIA; Borrow Pit - DR1837, Uniondale | Heritage Impact Assessment for a Expansion of an Existing Borrow Pit Located Along Divisional Road 1837 Approximately 6.45 km Northeast of Uniondale in Eden District Municipality, Western Cape. | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:40 | |
HIA; Borrow Pit - DR1843, Willowmore | Heritage Impact Assessment for a Expansion of an Existing Borrow Pit Located Along Divisional Road 1843 Approximately 20 km south of Willowmore in Eden District Municipality, Western Cape | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:33 | |
HIA; Borrow Pit - DR5901, Uniondale | Heritage Impact Assessment for a Proposed Borrow Pit Located Along Divisional Road 5901 17.5 km South of Uniondale in the Eden District Municipality, Western Cape. | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:25 | |
HIA; Borrow Pit - DR1660, Uniondale | Heritage Impact Assessment for a Expansion of an Existing Borrow Pit Located Along Divisional Road 1660 15km Southwest of Uniondale in the Eden District Municipality, Western Cape. | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:16 | |
HIA; Borrow Pit - DR01797 Bitou, Western Cape | Heritage Impact Assessment for a Proposed Borrow Pit Located Along Divisional Road 01797 in Bitou Approximately 8.5km northeast of Plettenberg Bay in the Eden District Municipality, Western Cape | HIA Phase 1 | 12/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 07:45 | |
RBCT HIA Exemption | Application for Exemption HIA Proposed RBCT Repeater Tower | HIA Letter of Exemption | 21/04/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Durban | 18/05/2018 - 15:08 | |
ILI3864 Heritage Screening Assessment Report | Heritage Screening Assessment: Environmental Impact Assessment for Eskom's Northern KwaZulu-Natal Strengthening Project | Heritage Impact Assessment Specialist Reports | 05/06/2018 | Justin du Piesanie | Digby Wells Environmental | Eskom Holdings SOC Limited | 18/05/2018 - 13:10 | |
HIA - IRPTN Corridor 3 | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ETHEKWENI INTEGRATED RAPID PUBLIC TRANSPORT NETWORK, CORRIDOR 3 | HIA Phase 1 | 09/09/2012 | Frans Prins | Active Heritage CC | SiVEST SA (Pty) Ltd | 18/05/2018 - 12:54 | |
AIA FOR THE PROPOSED TRANSNET HEYSTERKRAND RAILWAY LOOP PROJECT IN THE BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF RHENOSTERFONTEIN 86JQ FOR THE PROPOSED TRANSNET HEYSTERKRAND RAILWAY LOOP PROJECT IN THE BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 10/05/2018 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 18/05/2018 - 11:19 | |
Heritage Scoping Report - Dwarsrivier | HERITAGE SCOPING REPORT - FOR THE PROPOSED PROJECT 1 AND 2 AT THE DWARSRIVIER MINE, LIMPOPO PROVINCE. | Heritage Scoping | 26/04/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Envirogistics (Pty) Ltd | 18/05/2018 - 10:50 | |
Proposed Umsimbithi eMakhazeni Mining Project | Heritage Impact assessment Report for the proposed Umsimbithi eMakhazeni Mining Project near Belfast, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 04/12/2017 | Jessica Angel | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 18/05/2018 - 10:15 | |
Humansrus Solar Thermal Energy Power Plant Postmasburg Heritage Impact Report | SolarReserve SA (Pty) Ltd, Humansrus Solar Thermal Energy Power Plant, Postmasburg Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 01/09/2011 | Wouter Fourie | 18/05/2018 - 07:42 | |||
Exemption request: Holding 56, Bredell AH | LETTER FOR HIA EXEMPTION REQUEST: RE-ESTABLISHING OF THE FLOODLINE ON HOLDING 56, BREDELL AGRICULTURAL HOLDINGS, GAUTENG province | HIA Letter of Exemption | 03/04/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Texture Environmental Consultants | 17/05/2018 - 20:58 | |
Communications Tower within the Richards Bay Coal Terminal | Application for Exemption RBCT Repeater Mast Port of Richards Bay, Umhlathuze LM, King Cetshwayo DM, KwaZulu-Natal | HIA Letter of Exemption | 21/04/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Durban | 17/05/2018 - 16:59 | |
CTS18_059_Rooikoppies Housing | Desktop Heritage Screening Assessment for the Proposed Housing Development on portions of Farm Rooikoppies, Marikana, North West Province | Heritage Scoping | 26/03/2018 | Jenna Lavin | Cedar Tower Services | Environet Consulting and Engineering | 17/05/2018 - 16:06 | |
Palaeontology Report | 17/05/2018 - 15:06 | |||||||
PDA For Erf 364 | PDA For Erf 364 | PIA Desktop | 15/04/2018 | 17/05/2018 - 14:00 | ||||
Application for rescue permit for two burials exposed during road construction in Limpopo Province | Application for rescue permit for two human burials accidentally exposed during construction of Road D4182, Serafa Village, Farm Surbiton 115/0 Sekhukhune District, Limpopo Province | BGG Phase 2 | 10/05/2018 | Trust Mlilo | Integrated Specialist Services | Integrated Specialist Services | 17/05/2018 - 13:58 | |
AIA FOR THE PROPOSED TRANSNET BOSHOEK RAILWAY LOOP PROJECT IN THE BOJANALA PLATINUM DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF BOSCHHOEK 103JQ FOR THE PROPOSED TRANSNET BOSHOEK RAILWAY LOOP PROJECT IN THE BOJANALA PLATINUM DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 09/05/2018 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 17/05/2018 - 11:26 | |
South 32 Graves-Hartebeenlagte | STATUS QUO AND PRE-MITIGATION HERITAGE IMPACT ASSESSMENT REPORT INCORPORATING SOCIAL CONSULTATION FOR BURIALS IDENTIFIED DURING PHASE 1 IMPACT ASSESSMENT STUDY FOR S32 (KPSX: SOUTH) MINING DEVELOPMENT IN HARTEBEENLAAGTE 325 JS-ORGIES, EMALAHLENI LOCAL MUNICIPALITY, IN MPUMALANGA PROVINCE | BGG Phase 1 | 16/05/2018 | MULAIFA DEVELOPMENT PROJECTS | 16/05/2018 - 18:50 | |||
AIA Proposed construction of agricultural development on Kakamas South Settlement no 2185 and 2193, Augrabies | Proposed citrus development, Renosterkop Extension (Kakamas South Settlement No. 2185 & 2193) Augrabies, Northern Cape | AIA Phase 1 | 15/12/2017 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/05/2018 - 18:03 | ||
Tabali Pipeline | THE PROPOSED CONSTRUCTION OF A WATER PIPELINE FROM THE TABALI RESEVOIR TO THE OK RESERVOIR, THABA NCHU, FREE STATE | HIA Phase 1 | 17/04/2018 | 16/05/2018 - 14:16 | ||||
AIA | Phase 1 Archaeological Impact Assessment for I-CAT (Pty) Ltd | AIA Phase 1 | 01/09/2016 | Tobias Coetzee | 16/05/2018 - 13:37 | |||
DCA_Pre-Application_BAR_App_D4_HIA_Palaeontology | EXPANSION OF DIAMOND COAST AQUACULTURE FARM PORTION 1 OF FARM KLEINZEE 654, KLEINZEE, NORTHERN CAPE, Nama Khoi Municipality, Namakwaland Magisterial District | Archaeological Specialist Reports | 31/05/2018 | John Pether | Geological and Palaeontological Consultant | Agency for Cultural Resources Management | 16/05/2018 - 13:07 | |
DCA_Pre-Application_BAR_App_D3_HIA_MaritimeArcheology | Maritime Heritage Impact Assessment: Expansion of Diamond Coast Aquaculture Farm on Farm 654, Portion 1, Kleinzee, Northern Cape | Archaeological Specialist Reports | 31/05/2018 | John Gribble | ACO Associates CC | Agency for Cultural Resources Management | 16/05/2018 - 13:04 | |
DCA_Pre-Application_BAR_App_D2_HIA_Archaeology | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED EXPANSION OF DIAMOND COAST AQUACULTURE FARM ON PORTION 1 OF FARM KLEINZEE 654 KLEINZEE NORTHERN CAPE | Archaeological Specialist Reports | 28/02/2018 | Agency for Cultural Resources Management | Anchor Environmental Consultants (Pty) Ltd | 16/05/2018 - 13:00 | ||
HIA Portion 4 of Farm Waterval 34 | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for a Proposed egg-layer facility on Portion 4 of Farm Waterval 34 JS, Mpumalanga | HIA Phase 1 | 24/04/2018 | Jenna Lavin, Nkosinathi Godfrey Tomose | Cedar Tower Services | CSIR | 16/05/2018 - 12:27 | |
Gamsberg Heritage Impact Assessment Report | Phase 1 Heritage Impact Assessment Report for the Prospecting Rights Application: Gamsberg near Aggeneys in the Northern Cape Province | HIA Phase 1 | 24/04/2018 | Stephan Gaigher | Black Mountain Mining (PTY) LTD | Black Mountain Mining (PTY) LTD | 16/05/2018 - 11:52 | |
Gamsberg Heritage Impact Assessment Report | Phase 1 Heritage Impact Assessment Report for the Prospecting Rights Application: Gamsberg near Aggeneys in the Northern Cape Province | HIA Phase 1 | 24/04/2018 | Stephan Gaigher | Black Mountain Mining (PTY) LTD | Black Mountain Mining (PTY) LTD | 16/05/2018 - 11:34 |