THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 8301 - 8350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities | Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces | HIA Letter of Exemption | 12/12/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2016 - 11:29 | |
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities | Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces | HIA Letter of Exemption | 12/12/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2016 - 11:26 | |
HIA LETTER OF EXEMPTION: KLOOF NEK WATER TREATMENT PLANT NEW PIPELINE | HIA LETTER OF EXEMPTION: KLOOF NEK WATER TREATMENT PLANT NEW PIPELINE | HIA Letter of Exemption | 15/12/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Sillito Environmental Consulting | 15/12/2016 - 11:23 | |
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities | Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces. | HIA Letter of Exemption | 12/12/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2016 - 11:14 | |
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities | Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces. | HIA Letter of Exemption | 12/12/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2016 - 11:01 | |
GBDBWSS - Desktop PIA | DESKTOP PALAEONTOLOGICAL ASSESSMENT FOR THE PROPOSED GREATER BULWER-DONNYBROOK BULK WATER SUPPLY SCHEME (GBDBWSS): HARRY GWALA DISTRICT MUNICIPALITY, KWAZULU-NATAL | PIA Desktop | 14/12/2016 | Gideon Groenewald | Dr. Gideon Groenewald | Dr. Gideon Groenewald | 14/12/2016 - 10:26 | |
Elders Colliery Scoping report | Heritage Scoping | 13/12/2016 - 15:50 | ||||||
Ventersburg Bulk Water Supply- Heritage Report (Lloyd 2016) | Phase 1 Archaeological Impact Assessment of a proposed new water pipeline and associated infrastructure between Ventersburg and the Koppie Alleen pump station, FS Province | AIA Phase 1 | 30/09/2016 | Lloyd Rossouw | 13/12/2016 - 12:17 | |||
AIA FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 18/07/2016 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 13/12/2016 - 11:49 | |
AIA FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 18/07/2016 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 13/12/2016 - 11:48 | |
Cultural Heritage Impact Assessment | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF TWO BORROW PITS NEAR BABANANA VILLAGE, MOPANI DISTRICT, LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 13/12/2016 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | 13/12/2016 - 11:09 | ||
Rethabiseng-Cultural Heritage Impact Assessment | Cultural heritage impact assessment for THE CONSTRUCTION OF THE PROPOSED RETHABISENG SUBSTATION AND LOOP-IN AND LOOP-OUT LINES, EKANGALA, GAUTENG PROVINCE | HIA Phase 1 | 31/03/2016 | J van Schalkwyk | J van Schalkwyk | 13/12/2016 - 07:31 | ||
AIA, Sabie Sand Nature Reserve Kirkman's Kamp | Phase 1 Archaeological Survey on the farm Toulon 383 KU located in Sabie Sand Nature Reserve, Mpumalanga Province. | AIA Phase 1 | 30/09/2016 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 12/12/2016 - 15:41 | |
AIA, Sabie Sand Nature Reserve Kirkman's Kamp | Phase 1 Archaeological Survey on the farm Toulon 383 KU located in Sabie Sand Nature Reserve, Mpumalanga Province. | AIA Phase 1 | 30/09/2016 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 12/12/2016 - 15:41 | |
Hermanus kraal quarry mitigation | MITIGATION AT HERMANUS KRAAL, LADYSMITH, KWAZULU-NATAL | Archaeological Permit Report | 22/06/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Ladysmith Crushed Stonel | 09/12/2016 - 14:11 | |
HIA Eskom Rampheri | HERITAGE IMPACT ASSESSMENT (HIA) AND PALEONTOLOGICAL SURVEY FOR THE PROPOSED 132 KV LINE FROM RAMPHERI TO THE SYFERKUIL SUBSTATION, CONSTRUCTION OF SUBSTATIONS AND CUSTOMER NETWORK CENTRES AT RAMPHERI AND SYFERKUIL, AND UPGRADE A 33KV CHICKADEE THABAMOOPO - SYFERKUIL LINE TO A 132 KV KINGBIRD LINE | HIA Phase 1 | 22/08/2016 | Edward Matenga | 08/12/2016 - 17:51 | |||
SA FLUORITE (PTY) LTD & SOUTHERN PALACE 398 (PTY) LTD: PROPOSED DOORNHOEK FLUORSPAR MINE PROJECT, NGAKA MODIRI MOLEMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE - Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON THE FARMS RHENOSTERFONTEIN 304JP AND FARM 306JP FOR THE PROPOSED DOORNHOEK FLUORSPAR MINE PROJECT, NGAKA MODIRI MOLEMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 15/06/2016 | Nelius Kruger | 08/12/2016 - 16:18 | |||
SA FLUORITE (PTY) LTD & SOUTHERN PALACE 398 (PTY) LTD: PROPOSED DOORNHOEK FLUORSPAR MINE PROJECT, NGAKA MODIRI MOLEMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE - Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON THE FARMS RHENOSTERFONTEIN 304JP AND FARM 306JP FOR THE PROPOSED DOORNHOEK FLUORSPAR MINE PROJECT, NGAKA MODIRI MOLEMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 15/06/2016 | Nelius Kruger | 08/12/2016 - 11:16 | |||
ESPERO PROPERTIES (PTY) LTD: PROPOSED LOTUS GARDENS X17 RETAIL CENTRE DEVELOPMENT, LOTUS GARDENS, CITY OF TSHWANE, GAUTENG PROVINCE - Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION 539 OF THE FARM PRETORIA TOWN AND TOWNLANDS 351 JR , GAUTENG PROVINCE FOR THE PROPOSED LOTUS GARDENS X17 RETAIL CENTRE DEVELOPMENT, CITY OF TSHWANE, GAUTENG PROVINCE | AIA Phase 1 | 15/09/2016 | Nelius Kruger | 08/12/2016 - 10:01 | |||
ESPERO PROPERTIES (PTY) LTD: PROPOSED LOTUS GARDENS X17 RETAIL CENTRE DEVELOPMENT, LOTUS GARDENS, CITY OF TSHWANE, GAUTENG PROVINCE - Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION 539 OF THE FARM PRETORIA TOWN AND TOWNLANDS 351 JR , GAUTENG PROVINCE FOR THE PROPOSED LOTUS GARDENS X17 RETAIL CENTRE DEVELOPMENT, CITY OF TSHWANE, GAUTENG PROVINCE | AIA Phase 1 | 15/09/2016 | Nelius Kruger | 08/12/2016 - 09:52 | |||
heritage report for the bulk water supply pipeline | Heritage Impact Assessment Study for the proposed bulk water supply and storage reservoir, Modimolle, Limpopo | HIA Phase 1 | 21/11/2016 | Nkosinathi Godfrey Tomose | 06/12/2016 - 21:26 | |||
HIA for Modimolle Bulk supply | Heritage impact assessment for the bulk supply pipeline and resrvoirs in Modimolle, limpopo | HIA Phase 1 | 21/11/2016 | Nkosinathi Godfrey Tomose | 06/12/2016 - 17:37 | |||
HIA for Modimolle Bulk supply | Heritage impact assessment for the bulk supply pipeline and resrvoirs in Modimolle, limpopo | HIA Phase 1 | 21/11/2016 | Nkosinathi Godfrey Tomose | 06/12/2016 - 17:37 | |||
PIA - Draft EIA | Elize Butler | National Museum Bloemfontein - Karoo Palaeontology Department | Savannah Environmental (Pty) Ltd | 06/12/2016 - 12:36 | ||||
AIA - Draft EIA | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 06/12/2016 - 12:30 | ||||
Chatty Bulk Stormwater Archaeological LoE | A letter of recommendation (with conditions) for the exemption of a full Phase 1 Archaeological Impact Assessment (AIA) for the proposed bulk stromwater infrastructure, Upper Chatty, Nelson Mandela Bay Municipality, Eastern Cape Province. | HIA Letter of Exemption | 01/08/2016 | Celeste Booth | Booth Heritage Consulting | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 06/12/2016 - 09:13 | |
PTN 26 Syferfontein | (a) PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT ON PORTION 26 OF THE FARM SYFERFONTEIN 438 IQ POTCHEFSTROOM NORTH WEST PROVINCE | AIA Phase 1 | 05/12/2016 | Udo Kusel | African Heritage Consultants CC | AB Enviro Consult CC | 05/12/2016 - 13:50 | |
HIA FOR THE PROPOSED BULK WATER SUPPLY LINE FROM PIET-SE-KOP RESERVOIR TO TSHAMAHANSI AND WITRIVIER/PHAFOLA TO BAKENBERG, AS PART OF THE MOGALAKWENA WATER MASTER PLAN, MOGALAKWENA MUNICIPALITY AREA, LIMPOPO PROVINCE | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) FOR THE PROPOSED BULK WATER SUPPLY LINE FROM PIET SE KOP RESERVOIR TO TSHAMAHANSI AND WITRIVIER/PHAFOLA TO BAKENBERG, LIMPOPO PROVINCE | HIA Phase 1 | 25/11/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 05/12/2016 - 12:59 | |
Frankfort Pipeline | Phase 1 Archaeological Impact Assessment of three proposed new water pipelines in Frankfort, Fezile Dabi District Municipality, FS Province | AIA Phase 1 | 01/12/2016 | Lloyd Rossouw | 05/12/2016 - 10:16 | |||
Frankfort Pipeline | Phase 1 Archaeological Impact Assessment of three proposed new water pipelines in Frankfort, Fezile Dabi District Municipality, FS Province | AIA Phase 1 | 01/12/2016 | Lloyd Rossouw | 05/12/2016 - 10:16 | |||
Heritage Screener Erf 1792 | Heritage Screener: Proposed Development on Erf 1792 Parsons Vlei, Port Elizabeth | AIA Desktop | 02/12/2016 | Jenna Lavin | CTS Heritage | 02/12/2016 - 13:34 | ||
Scoping HIA - proposed Copper Mine near Musina | A Scoping Heritage Study for the Proposed Musina Copper Project near Musina in the Limpopo Province | Heritage Scoping | 01/08/2016 | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates | 02/12/2016 - 11:07 | ||
Ixopo CRU Housing Project | Phase 1 Heritage Impact Assessment, Ixopo CRU Housing Project, Ubuhlebezwe Local Municipality, KwaZulu-Natal | HIA Phase 1 | 30/09/2016 | Jean Beater | Fuze Environmental Services | Fuze Environmental Services | 02/12/2016 - 06:20 | |
CTS16_056 ACRM WEF Access Road Copperton | Heritage Screener: CTS16_056 ACRM WEF Access Road Copperton | 29/11/2016 | Jenna Lavin, Kyla Bluff | CTS Heritage | Agency for Cultural Resources Management | 01/12/2016 - 16:16 | ||
HIA | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO MINING PERMIT APPLICATION ON FARM KANGKURU NEAR KURUMAN, | AIA Phase 1 | 31/10/2016 | Eric Ndivhuho Mathoho | Department of Mineral Resources | Department of Minerals and Energy | 01/12/2016 - 15:37 | |
PROPOSED 400KV POWER LINE FROM ARIADNE SUBSTATION TO VENUS SUBSTATION | ARCHAEOLOGICAL AND CULTURAL HERITAGE PHASE I EMP WALK DOWN SPECIALIST REPORT FOR THE PROPOSED 400KV POWER LINE FROM ARIADNE SUBSTATION TO VENUS SUBSTATION WITHIN UTHUKELA AND UMGUNGUNDLOVU DISTRICT MUNICIPALITY OF KWAZULU NATAL PROVINCE. | AIA Phase 1 | 01/10/2014 | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 01/12/2016 - 09:36 | ||
Phase 1 AIA for the proposed Erasmus Park township development | Phase 1 Archaeological Impact Assessment for the proposed Erasmus Park township development | AIA Phase 1 | 18/11/2016 | Neels Kruger | Exigo3 Sustainability | Interdesign Landscape Architects | 30/11/2016 - 17:19 | |
Hennenman HIA and PIA | PGS Report - Hennenman - HIA and PIA - Final Report- Combined | Heritage Impact Assessment Specialist Reports | 13/11/2016 | Polke Birkholtz | Professional Grave Solutions (Pty) Limited | Environmental Impact Management Services (Pty) Ltd | 30/11/2016 - 14:42 | |
Letter of Exemption - Nzalabantu North and Ndlabeyindula | Letter of Recommendation for Exemption for the Proposed Nzalabantu North and Ndlabeyindulu Housing Project | HIA Letter of Exemption | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 30/11/2016 - 09:57 | |||
Heritage Impact Assessment for Portion 123, Vlakfontein 523-JR | Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/11/2016 - 09:33 | |||||
Phase 1 HIA Matlosana Estates | Report on a Phase 1 HIA for the proposed Matlosana Estates & Uraniaville Ext 2 developments on various portions of Poriton 1 of the farm Town and Townlands of Klerksdorp 424-IP in Klerksdorp North West Province | HIA Phase 1 | 01/11/2013 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 29/11/2016 - 17:42 | |
AIA: PROPOSED SAND MINE ON THE FARM BRAKKE KUYL NO. 38 AND NO. 39 BLOUBERG WESTERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED SAND MINE ON THE FARM BRAKKE KUYL NO. 38 AND NO. 39 BLOUBERG WESTERN CAPE | AIA Phase 1 | 01/10/2016 | Jonathan Kaplan | Agency for Cultural Resources Management | Leap Sustainable Development | CTS_375970 | 29/11/2016 - 16:19 |
Heritage Walkthrough FOR THE PROPOSED CONSTRUCTION OF THE ESKOM INVUBU THETA 400KV AND UMFOLOZI MBEWU LOOP-INS, KZN | Heritage Walkthrough FOR THE PROPOSED CONSTRUCTION OF THE ESKOM INVUBU THETA 400KV AND UMFOLOZI MBEWU LOOP-INS, KZN | AIA Phase 1 | 11/01/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | AECOM SA - Head Office | 29/11/2016 - 15:22 | |
Invubu Mbewu Structures - Archival Research Report | Addendum to the Heritage Walkthrough Report To determine the significance of structures affected by the proposed construction of the Eskom Invubu Theta 400kv and Umfolozi Mbewu loop-ins, KZN | AIA Desktop | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | AECOM SA - Head Office | 29/11/2016 - 14:59 | |
Ophathe Game Reserve Heritage Survey and Report | HERITAGE MAPPING AND SURVEY OF THE OPHATHE GAME RESERVE EMAKHOSINI OPHATHE HERITAGE PARK ZULULAND DISTRICT COUNCIL, KWAZULU-NATAL. | Heritage Study | 28/11/2016 | Len van Schalkwyk | eThembeni Cultural Heritage | KwaZulu-Natal Amafa and Research Institute | 28/11/2016 - 16:39 | |
PIA - Draft | Paleontological Impact Assessment - Desktop Study | Palaeontological Specialist Reports | John Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 28/11/2016 - 12:51 | ||
HIA - Draft | Heritage Impact Assessment For Proposed Suurplaat Wind Energy Facility, Western Cape And Northern Cape | Heritage Impact Assessment Specialist Reports | Timothy Hart, Kyla Bluff, David Halkett, Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 28/11/2016 - 12:23 | ||
PHA - KT PV2 (Oct 14) | Palaeontological Heritage Assessment: Combined Desktop & Field-Based Study Proposed Solarreserve Kotulo Tsatsi Csp And PV Solar Energy Facilities Near Kenhardt, Northern Cape Province | Palaeontological Specialist Reports | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 28/11/2016 - 09:56 | ||
AIA - KT PV2 (Nov16) | Archaeological Impact Assessment for the proposed Kotulo Tsatsi PV 2 Facility, located close to Kenhardt in the Northern Cape. | Archaeological Specialist Reports | 21/11/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 28/11/2016 - 09:50 | |
Henela Solar Projects: Final Heritage Reports | Heritage Impact Assessment Specialist Reports | 31/07/2016 | Wouter Fourie | Department of Environmental Affairs | PGS Heritage and Grave Relocation Consultants | 28/11/2016 - 09:11 |