FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Phase 1 Cultural Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: SECTION 24G PROCESS: UNLAWFUL CONSTRUCTION AND INFILLING OF A WATERCOURSE ON THE REMAINDER OF PORTION 274 OF THE FARM TIEGERPOORT 371JR, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 20/04/2023 J A van Schalkwyk J A van Schalkwyk 24/04/2023 - 08:19
Triple 777 Energy (Pty) Ltd- FS 10671 PR BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMM REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING SITUATED ON PORTION 2&3 OF THE FARM ZANDFONTEIN 132, THE FARM DRAAIBANK 467 AND THE REMAINING EXENT OF THE FARM BRAKFONTEIN 147, IN THE MAGISTERIAL DISTRICT OF ZASTRON, FREE STATE 21/04/2023 - 10:57
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Okavango 17449 Prospecting Right Application near Balfour, Mpumalanga AIA Desktop 21/03/2023 Tobias Coetzee 21/04/2023 - 09:53
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Okavango Rietfontein Prospecting Right Application near Balfour, Mpumalanga AIA Desktop 22/03/2023 Tobias Coetzee 21/04/2023 - 09:32
OR Tambo (Ixopo) PHASE 1 HIA REPORT FOR PROPOSED INFORMAL SETTLEMENT UPGRADING AT O.R.TAMBO (IXOPO), UBUHLEBEZWE LOCAL MUNICIPALITY, IXOPO, KWAZULU-NATAL - APAC020/46 01/06/2020 Anton Pelser APELSER ARCHAELOGICAL CONSULTING Maxim Planning Solutions, AB Enviro Consult CC 21/04/2023 - 09:27
Volta EGI VIA VISUAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT OF A 132 KV POWER LINE AND ASSOICUATED ELECTRICAL INFRASTRUCTURE NEAR DEALESVILLE, FREE STATE PROVINCE Visual Impact Assessment 27/03/2023 Lourens du Plessis 20/04/2023 - 17:15
Volta PV VIA VISUAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF THE 290MW VOLTA SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED BATTERY ENERGY STORAGE SYSTEM (BESS) NEAR DEALESVILLE, FREE STATE PROVINCE Visual Impact Assessment 27/03/2023 Lourens du Plessis 20/04/2023 - 17:13
Volta EGI PIA Palaeontological Impact Assessment: Basic Assessment or Electricity Grid Infrastructure standard, if applicable, for the proposed development of a 132 kV overhead and underground Power lines and associated EGI (i.e., Volta EGI) from the Volta PV Facility to the planned Artemis Main Transmission Substation (MTS) near Dealesville, Free State Palaeontological Specialist Reports 25/03/2023 Marion Bamford 20/04/2023 - 17:10
Volta PV PIA Palaeontological Impact Assessment - Basic Assessment for the proposed development of the 290 MW Volta Solar Photovoltaic (PV) Facility (i.e., Volta PV Facility) and Battery Energy Storage System (BESS) near Dealesville, Free State. Palaeontological Specialist Reports 25/03/2023 Marion Bamford 20/04/2023 - 17:08
Volta EGI HIA Heritage Impact Assessment for the for the proposed development of 132 KV powerlines and associated Electrical Grid Infrastructure (EGI) (i.e., Volta EGI) from the Volta PV Facility to the planned Artemis Main Transmission Substation (MTS) Near Dealesville, Free State Province. Heritage Impact Assessment Specialist Reports 01/03/2023 Jaco van der Walt Beyond Heritage 20/04/2023 - 17:02
Volta PV HIA Heritage Impact Assessment for the for the proposed 290 MW Volta Solar Photovoltaic (PV) Facility, (i.e., Volta PV Facility) and Battery Energy Storage Systems (BESS), near Dealesville, Free State. Heritage Impact Assessment Specialist Reports 01/03/2023 Jaco van der Walt Beyond Heritage 20/04/2023 - 16:58
Palaeontological Impact Assessment for the proposed Marula Platinum Mines Solar Plant Request for Exemption of any Palaeontological Impact Assessment for the proposed Marula Platinum Mines Solar Plant PIA Desktop 19/04/2023 20/04/2023 - 12:48
To be uploaded 20/04/2023 - 12:44
Soyuz 6 SEF Heritage Scoping Report Heritage Scoping Report: Proposed Soyuz 6 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 20/04/2023 - 11:21
Soyuz 5 SEF Heritage Scoping Report Heritage Scoping Report: Proposed Soyuz 5 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 20/04/2023 - 11:03
Palaeontological Impact Assessment for the proposed Receiving Station for the Durban South Sasol pigging project, Umbogintwini, KwaZulu Natal Province Palaeontological Impact Assessment for the proposed Receiving Station for the Durban South Sasol pigging project, Umbogintwini, KwaZulu Natal Province PIA Desktop 28/11/2022 Marion Bamford Prof Marion Bamford WSP Environmental Pty Ltd - Durban 20/04/2023 - 10:58
Heritage Impact Assessment for the proposed Sasol Receiver Pigging Station KZN. Heritage Impact Assessment for the proposed Sasol Receiver Pigging Station KZN. HIA Phase 1 30/11/2022 Jaco van der Walt Beyond Heritage WSP Environmental Pty Ltd - Durban 20/04/2023 - 10:56
Soyuz 4 SEF Heritage Scoping Report Heritage Scoping Report: Proposed Soyuz 4 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 20/04/2023 - 10:51
Soyuz 3 SEF Heritage Scoping Report Heritage Scoping Report: Proposed Soyuz 3 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 20/04/2023 - 10:34
Soyuz 2 SEF Heritage Scoping Report Heritage Scoping Report: Proposed Soyuz 2 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 20/04/2023 - 10:16
Mahikeng Bus and Taxi holding Area Mahikeng Bus and Taxi holding Area HIA Phase 1 15/06/2021 Lloyd Rossouw Paleo Field Service Paleo Field Services 20/04/2023 - 09:27
Heritage Scoping Report for Soyuz 1 SEF Heritage Scoping Report: Proposed Soyuz 1 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 19/04/2023 - 15:02
Soyuz 1 SEF Heritage Scoping Report Heritage Scoping Report: Proposed Soyuz 1 Solar Energy Facility, outside Britstown, Northern Cape Province Heritage Scoping 03/02/2023 John Gribble ACO Associates CC Terramanzi Group (Pty) Ltd 19/04/2023 - 11:41
Palaeontological Impact Assessment: Phase 1 Field Study: Notre Coal- MR PIA Phase 1 18/05/2023 18/04/2023 - 22:10
PALAEONTOLOGICAL PART 2 AMENDMENT EXISTING GAMMA SUBSTATION AND ASSOCIATED POWERLINES PALAEONTOLOGICAL PART 2 AMENDMENT EXISTING GAMMA SUBSTATION AND ASSOCIATED POWERLINES, NORTHERN & WESTERN CAPE PROVINCES Palaeontological Specialist Reports 23/03/2023 Elize Butler Banzai Environmental (Pty) Ltd Banzai Environmental (Pty) Ltd 18/04/2023 - 12:15
Heritage Comparative Assessment for the Existing 765kV Gamma Substation and Associated Powerline Turn-in Infrastructure, located on Farms Uit Vlugt Fontein No.265 and Schietkuil No.3 Part 2 Amendment Application for the Existing 765kV Gamma Substation and Associated Powerline Turn-in Infrastructure, located on Farms Uit Vlugt Fontein No.265 and Schietkuil No.3, Western and Northern Cape Provinces. Heritage Impact Assessment Specialist Reports 27/03/2023 Nikki Mann PGS Heritage (Pty) Ltd PGS Heritage (Pty) Ltd 18/04/2023 - 12:10
Site Management Plan for Noka Shelter, Lapalala Wilderness Management Plan: Noka rock art site, Noka Camp, Lapalala Wilderness, Lephalale Lcal Municipality, Waterberg District Municipality, Limpopo Province, South Africa Archaeological Specialist Reports 18/04/2023 Jeremy Hollmann 18/04/2023 - 12:03
Heritage Impact Assessment for Project 1 - Proposed Upgrade To The North Mine Storm Water Channel; Project 2 - Proposed Ventilation Shaft, Electricity Generation And Distribution Infrastructure, As Well As A Underground Fuel Distribution Facility At The Heritage Impact Assessment for Project 1 - Proposed Upgrade To The North Mine Storm Water Channel; Project 2 - Proposed Ventilation Shaft, Electricity Generation And Distribution Infrastructure, As Well As A Underground Fuel Distribution Facility At The Dwarsrivier Chrome Mine, Near Steelpoort, Limpopo Province HIA Phase 1 23/03/2023 Jaco van der Walt Beyond Heritage Envirogistics (Pty) Ltd 18/04/2023 - 11:20
Heritage Impact Assessment for Project 1 - Proposed Upgrade To The North Mine Storm Water Channel; Project 2 - Proposed Ventilation Shaft, Electricity Generation And Distribution Infrastructure, As Well As A Underground Fuel Distribution Facility At The Heritage Impact Assessment for Project 1 - Proposed Upgrade To The North Mine Storm Water Channel; Project 2 - Proposed Ventilation Shaft, Electricity Generation And Distribution Infrastructure, As Well As A Underground Fuel Distribution Facility At The Dwarsrivier Chrome Mine, Near Steelpoort, Limpopo Province 23/03/2023 Jaco van der Walt Beyond Heritage Envirogistics (Pty) Ltd 18/04/2023 - 10:59
Mdoni Shelter Site Management Plan Management Plan: Mdoni rock art site, Lapalala Wilderness, Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province, South Africa Archaeological Specialist Reports 18/04/2023 Jeremy Hollmann 18/04/2023 - 09:51
HIA Project 9: Swift PV Heritage Impact Assessment Project 9: Swift PV, Stilfontein North West Province HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 18/04/2023 - 08:38
HIA Project 3: Swallow PV Heritage Impact Assessment Project 3: Swallow PV, Stilfontein North West Province HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 18/04/2023 - 08:23
HIA Project 1: Spoonbill PV Heritage Impact Assessment Project 1: Spoonbill PV, Stilfontein North West Province HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 19:02
Prospecting for Manganese Ore on Portion 1 of the Farm Lizbeth 325, situated In the Magisterial District of John Taolo Gaetsewe (Kuruman) in Northern Cape Province. PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR MANGANESE ORE ON PORTION 1 OF THE FARM LIZBETH 325 SITUATED IN THE MAGISTERIAL DISTRICT OF JOHN TAOLO GAETSEWE (KURUMAN) IN NORTHERN CAPE PROVINCE. HIA Phase 1 30/03/2023 Trust Mlilo 17/04/2023 - 16:50
Phase 1 Archaeological Impact Assessment for the Prospecting Right Application in Northern Cape Province PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION FOR THE PURPOSE OF PROSPECTING MANGANESE ORE ON PORTION 2 OF THE FARM EAST 270 SITUATED IN THE MAGISTERIAL DISTRICT OF JOHN TAOLO GAETSEWE (KURUMAN) IN NORTHERN CAPE PROVINCE. HIA Phase 1 30/03/2023 Trust Mlilo 17/04/2023 - 16:37
Heritage Impact Assessment (Archaeology) for the proposed mining on farm Dunncan Erf 769 Heritage Impact Assessment (Archaeology) for the proposed mining on farm Dunncan Erf 769, Jan Kempdorp, Phokwane Local Municipality, Northern Cape. Archaeological Specialist Reports 17/04/2023 Abenicia Henderson SAHRA HOU McGregor Museum 17/04/2023 - 14:33
Kemo Phase 2 Phase 2 Archaeological Investigation of the so called ‘Kemo Dump’ (National Site Number 2824DB039) on Remainder of Erf 5024, Erf 6376 and Erf 5058, Vooruitzigt-81, Kimberley Northern Cape. Archaeological Permit Report 17/04/2023 Abenicia Henderson SAHRA HOU McGregor Museum 17/04/2023 - 13:53
HIA Project 8: Starling PV Heritage Impact Assessment for Project 8: Starling PV HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 12:39
HIA Project 2 Sunbird PV Heritage Impact Assessment HIA – Project 2 Sunbird PV, Stilfontein North West Province. HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 12:12
HIA Project 7: Sparrow PV Heritage Impact Assessment Project 7: Sparrow PV Stilfontein North West Province Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 11:28
HIA Project 6: Stilfontein PV Heritage Impact Assessment Project 6: Stilfontein PV Stilfontein North West Province HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 10:57
HIA Project 4: Snipe PV Heritage Impact Assessments Project 4 Snipe PV Stilfontein North West Province HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 10:46
Existing Borrow Pit Stella Stella Borrow Pit HIA Phase 1 01/12/2022 Lloyd Rossouw Paleo Field Service 17/04/2023 - 10:28
HIA Project 5: Shrike PV Heritage Impact Assessment Project 5: Shrike PV Stilfontein, North West Province 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 17/04/2023 - 10:26
Palaeo Report Greenbushes Solar PV Facility PALAEONTOLOGICAL DESKTOP REPORT for Proposed development of a Solar PV Facility at Greenbushes, Eastern Cape PIA Desktop 08/10/2022 Francois Durand Francois Durand CEN Integrated Environmental Management Unit 14/04/2023 - 20:07
Archaeological Report Greenbushes Solar PV Facility A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF THE GREENBUSHES FARM SOLAR PV FACILITY ON PORTION 8 (PORTION OF PORTION 3) OF THE FARM KUYGA NO. 8, AS WELL AS ELECTRICAL TRANSMISSION LINES IN WARD 40 IN GREENBUSHES, GQEBERHA (PORT ELIZABETH), NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE HIA Letter of Exemption 02/11/2022 Kobus Reichert Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit 14/04/2023 - 20:02
Walkthrough Report MTHS Grid Infrastructure Heritage Walkthrough Report Site Inspection Report 21/10/2021 ACO Associates CC 14/04/2023 - 14:37
Walkthrough Report MTHS Grid Infrastructure Walkthrough Report Site Inspection Report 21/10/2021 ACO Associates CC 14/04/2023 - 14:23
Tshaba Nelo (Pty) Ltd_FS 10367 MP BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON A PORTION OF PORTION 2 OF THE FARM VAALBANK 135, IN THE MAGISTERIAL DISTRICT OF WELKOM 14/04/2023 - 13:24
APAC023/33 PHASE 1 HIA REPORT FOR THE SWARTRUGGENS MINING & PROSPECTING RIGHTS APPLICATION ON PORTION 38 OF THE FARM RUSTVOORBY 383JP NEAR SWARTRUGGENS IN THE NORTHWEST PROVINCE HIA Phase 1 13/04/2023 Anton Apelser 14/04/2023 - 13:11