THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 9101 - 9150 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Heritage Report for the R34 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SANRAL R34 PROJECT BETWEEN SCHWEIZER-RENEKE AND VRYBURG, NORTHWEST PROVINCE | HIA Phase 1 | 31/12/2015 | Anton van Vollenhoven | Archaetnos CC | WSP | 19/05/2016 - 11:49 | |
Heritage Report for the R34 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SANRAL R34 PROJECT BETWEEN SCHWEIZER-RENEKE AND VRYBURG, NORTHWEST PROVINCE | HIA Phase 1 | 31/12/2015 | Anton van Vollenhoven | Archaetnos CC | WSP | 19/05/2016 - 11:49 | |
HIA Report | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WIDENING OF THE CONRAD DRIVE BRIDGE AND EROSION PROTECTION MEASURES, BRAAMFONTEIN SPRUIT, BLAIRGOWRIE JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 05/06/2015 | Johnny Van Schalkwyk | 18/05/2016 - 16:43 | |||
AIA FOR THE PROPOSED KOMATIPOORT FUEL AND RETAIL DEVELOPMENT, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON PORTION 49 OF THE FARM KOMATIPOORT TOWNLANDS 182JU FOR THE PROPOSED KOMATIPOORT FUEL AND RETAIL DEVELOPMENT, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | AIA Phase 1 | 01/02/2016 | Neels Kruger | Exigo Sustainability | Ganeloman (PTY) LTD | 18/05/2016 - 15:39 | |
Mamatwan DTS | DESKTOP HERITAGE SURVEY OF THE PROPOSED MAMATWAN MANGANESE MINE SLIMES DAM | Heritage Scoping | 08/04/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 18/05/2016 - 14:24 | |
Alverstone HIA | HERITAGE IMPACT ASSESSMENT OF PROPOSED INSTALLATION OF ASSAGAY TRUNK WATER MAIN, ETHEKWINI METROPOLITAN MUNICIPALITY, KWAZULU-NATAL, SOUTH AFRICA | HIA Phase 1 | 01/04/2016 | Jean Beater | 1World Consultants (Pty) Ltd | 1World Consultants (Pty) Ltd | 18/05/2016 - 12:14 | |
Heritage Assessment - langa CSP 4 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga CSP 4 Project, near Upington, Northern Cape Province | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 12:08 | |||
Heritage Assessment - langa CSP 5 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga CSP 5 Project, near Upington, Northern Cape Province | Archaeological Specialist Reports | 11/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 12:02 | |
Heritage Assessment - langa CSP3 | Archaeological Impact Assessment Report for the Ilanga CSP 3 Project, near Upington, Northern Cape Province | Archaeological Specialist Reports | 12/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 11:49 | |
Walkerville Village Mews HIA | Letter of Exemption for Full HIA & Short Report: Proposed Walkerville Estate/ Walkerville Mews on Part of the Remainder of Portion 174 (of Portion 29) of the Farm Faraosfontein 372IQ, near Walkerville, GAUTENG | HIA Phase 1 | 11/03/2016 | Anton Pelser | Walkerville Village Mews | EnviroSynergy Consulting (Pty) Ltd | 18/05/2016 - 11:47 | |
Magogo Road PIA | PROPOSED ROAD UPGRADE PROJECT NEAR MAGOGO, KWAZULU/NATAL DESKTOP STUDY - PALAEONTOLOGY | PIA Desktop | 04/02/2016 | JF Durand | G & A Heritage | GBS Environmental Consulting | 18/05/2016 - 11:05 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 18/05/2016 - 10:40 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 18/05/2016 - 10:40 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 17/05/2016 - 13:46 | |
Jachtvlakte Historical Structures Impact Assessment | Proposed Jachtvlakte Precinct SHSP Historical Structures Impact Assessment | Objects | 01/06/2013 | Margaret Harradine | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 17/05/2016 - 12:54 | ||
Jachtvlakte AIA | A Phase 1 Archaeological Impact Assessment (AIA) for the proposed Jachtvlakte Precinct Sustainable Human Settlement Plan, Nelson Mandela Bay Municipality, Eastern Cape Province | AIA Phase 1 | 01/01/2012 | Celeste Booth | Albany Museum - Archaeology | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 17/05/2016 - 12:47 | |
Effluent evaporation ponds, Louterwater | Heritage Screener for the proposed effluent evaporation ponds, Louterwater, Eastern Cape | Heritage Scoping | 16/05/2016 | Mariagrazia Galimberti | CTS Heritage | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 17/05/2016 - 11:30 | |
Chatty Bulk Stormwater Heritage Scrrener | Bulk Stormwater Infrastructure, Upper Chatty, Eastern Cape | Heritage Scoping | 05/05/2016 | Mariagrazia Galimberti | CTS Heritage | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 17/05/2016 - 10:36 | |
Phase 1 Heritage Resources Scoping Report | Phase 1 Heritage Resources Scoping Report: New Citrus Orchards, Burgersfort, Limpopo Province | HIA Phase 1 | 26/01/2016 | Liesl Stegmann, Frans Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 16/05/2016 - 12:37 | |
Phase 1 Heritage Resources Scoping Report | Phase 1 Heritage Resources Scoping Report: New Citrus Orchards, Burgersfort, Limpopo Province | HIA Phase 1 | 26/01/2016 | Liesl Stegmann, Frans Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 16/05/2016 - 12:37 | |
Phase 1 Heritage Resources Scoping Report | Phase 1 Heritage Resources Scoping Report: New Citrus Orchards, Burgersfort, Limpopo Province | HIA Phase 1 | 26/01/2016 | Liesl Stegmann, Frans Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 16/05/2016 - 12:37 | |
Lekkerwijn Section 34 application | Lekkerwijn Section 34 application | Heritage Statement | 13/05/2016 | Sarah Winter | Sarah Winter Heritage Practitioner | Lekkerwijn TRUST & Sons | 14/05/2016 - 10:15 | |
Hammaskraal BPO Paleaontological Report | Palaeontological Impact Assessment for the Proposed development of the Hammanskraal Business Process Outsourcing and Technology Park, Gauteng | PIA Desktop | 11/09/2014 | Marion Bamford | University of the Witwatersrand - Evolutionary Studies Institute | 12/05/2016 - 13:28 | ||
NAM3428_IPP_HIA | Heritage Impact Assessment: Namane Generation Independent Power Producer and Transmission Line Project, Lephalale, Limpopo Province | Heritage Impact Assessment Specialist Reports | 29/02/2016 | Justin du Piesanie, Johan Nel | Digby Wells Environmental | Namane Generation (Pty) Ltd | 12/05/2016 - 11:44 | |
Augrabies filling station_Heritage Screener | Fuel filling station & convenience store, Augrabies, Northern Cape - Heritage Screener | 10/05/2016 | Kyla Bluff, Nicholas Wiltshire | CTS Heritage | Enviroafrica CC | 12/05/2016 - 09:21 | ||
HERITAGE IMPACT ASSESSMENT | FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED QHWAYI ROAD UPGRADE NEAR LADYSMITH, KWAZULU-NATAL. | HIA Phase 1 | 08/05/2016 | Frans Prins | Active Heritage CC | Active Heritage CC | 12/05/2016 - 09:13 | |
QHWAYI ROAD,HERITAGE IMPACT ASSESSMENT | FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED QHWAYI ROAD UPGRADE NEAR LADYSMITH, KWAZULU-NATAL. | HIA Phase 1 | 08/05/2016 | Frans Prins | Active Heritage CC | Active Heritage CC | 12/05/2016 - 09:13 | |
HIA Scoping: Proposed 132Kva Villiers via Frankfort to Heilbron Power Distribution Line | Heritage Impact Scoping Report for the Proposed 132Kva Villiers via Frankfort to Heilbron Power Distribution Line | Heritage Scoping | 14/03/2013 | Stephan Gaigher | G&A Heritage Management Consultants | Sivest - Gauteng | 11/05/2016 - 10:27 | |
Palaeontological & Archaeological Assessment | Palaeontological & Archaeological Assessment: Eenzaamheid 135 portion 39 (a portion of portion 3) 3218CA&CC Velddrif | Archaeological Specialist Reports | 01/08/2009 | Graham Avery, DM Avery | Iziko: South African Museum | 11/05/2016 - 08:25 | ||
Lambda - PIA | Environmental Management Plan for the Proposed Lambda 400 kV / 765 kV Substation and Associated Transmission Lines, Mpumalanga - Palaeontological Impact Assessment | PIA Desktop | 11/05/2016 | Marion Bamford | Digby Wells Environmental | Eskom Holdings SOC Limited | 11/05/2016 - 06:18 | |
HIU Site Report-Waterval Boven Monument | Site Visit for Waterval Boven Monument | Site Inspection Report | 10/05/2016 - 11:58 | |||||
HIU Site Report- Bergendal Monument | Site Visit for Bergendal Monument | Site Inspection Report | 10/05/2016 - 11:52 | |||||
HIU Site Report- Bergendal Monument | Site Visit for Bergendal Monument | Site Inspection Report | 10/05/2016 - 11:52 | |||||
HIU Site Report-Samora Machel | Samora Machel Plane Crash Site Monument and Public Participation Report | Site Inspection Report | 10/05/2016 - 11:48 | |||||
HIU Report-Shaepeville Massacre Memorial Site | Site Inspection Report-Sharpeville Massacre Memorial Site | 07/03/2016 | 10/05/2016 - 11:23 | |||||
Bhazamani Road HIA and PIA | FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED BHAZAMANI ROAD UPGRADE, NEAR LADYSMITH KWAZULU-NATAL. | HIA Phase 1 | 05/05/2016 | Frans Prins | 10/05/2016 - 09:22 | |||
HIA: BORROW PITS FOR THE PROPOSED UPGRADING OF THE ROAD FROM THE MISSION GATE TO RIEMVASMAAK, NORTHERN CAPE | FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE BORROW PITS FOR THE PROPOSED UPGRADING OF THE ROAD FROM THE MISSION GATE TO RIEMVASMAAK, NORTHERN CAPE | HIA Phase 1 | 21/07/2010 | Cobus Dreyer | Spatial Solutions Environmental Consultants | CTS_362421 | 10/05/2016 - 09:17 | |
Cape Stores Structural repairs & waterproofing | PARLIAMENTARY PRECINCT: OLD ASSEMBLY BUILDING: CAPE STORES: STRUCTURAL REPAIR WORK | Site Inspection Report | 09/05/2016 | Johan de Lange | BVi Consulting Engineers | DEPARTMENT OF TRANSPORT, ROADS AND PUBLIC WORKS. | 09/05/2016 - 16:56 | |
HIA for MAhlathini Road | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF MAHLATHINI ROAD | Heritage Impact Assessment Specialist Reports | 06/05/2016 | Frans Prins | 09/05/2016 - 12:37 | |||
HIA for MAhlathini Road | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF MAHLATHINI ROAD | Heritage Impact Assessment Specialist Reports | 06/05/2016 | Frans Prins | 09/05/2016 - 12:37 | |||
ARCHAEOLOGICAL IMPACT ASSESSMENT | ARCHAEOLOGICAL IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 30/10/2015 | Ndivhuwo Eric Mathoho | Millennium Heritage Group | Millennium Heritage Group | 09/05/2016 - 11:58 | |
Heritage report oThongathi Toll Plaza to Ballito Interchange | Cultural heritage impact assessment for THE UPGRADE OF THE NATIONAL ROUTE N2, SECTION 26 AND 27, FROM THE OTHONGATHI TOLL PLAZA (N2/26 KM 21.0) TO THE BALLITO INTERCHANGE (N2/27 KM 7.4), KWAZULU-NATAL | HIA Phase 1 | 09/02/2016 | Johnny Van Schalkwyk | Chameleon Environmental | 09/05/2016 - 11:37 | ||
PROPOSED NEW ESKOM POWER LINE ON THE FARM LEEUWFONTEIN 750 KS NEAR MARBLE HALL, LIMPOPO | PROPOSED NEW ESKOM POWER LINE ON THE FARM LEEUWFONTEIN 750 KS NEAR MARBLE HALL, LIMPOPO | Heritage Scoping | 29/04/2016 | Liesl Stegmann | 06/05/2016 - 13:33 | |||
The Whisken K56 | The Whisken K56 - Linking of a section of Whisken Avenue and Ethyl Avenue with the future K56 Road, including the upgrade and widening for a section of Whisken Avenue and a section of Ethyl Avenue. | HIA Phase 1 | 19/02/2018 | Johnny Van Schalkwyk, Johnny Van Schalkwyk | 06/05/2016 - 09:47 | |||
Letter of Exemption for Upgrade of Nampo Agricultural Secondary School | A LETTER OF RECOMMENDATION FOR EXEMPTION : THE PROPOSED UPGRADE OF THE NAMPO AGRICULTURAL SECONDARY SCHOOL IN THE NALA LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT, FREE STATE PROVINCE | HIA Letter of Exemption | 31/05/2013 | Munyadziwa Magoma | BoPhelo Environmental Consultant and GIS Specialist | Crane Registered Quantity Surveyors | CTS_362332 | 06/05/2016 - 09:00 |
HIA:UPGRADING OF DISTRICT ROAD DR08012 FROM MALUTI TO QACHAS NEK, MATATIELE, EASTERN CAPE PROVINCE, SOUTH AFRICA | HERITAGE IMPACT ASSESSMENT OF UPGRADING OF DISTRICT ROAD DR08012 FROM MALUTI TO QACHAS NEK, MATATIELE, EASTERN CAPE PROVINCE, SOUTH AFRICA | HIA Phase 1 | 01/09/2009 | Len van Schalkwyk | eThembeni Cultural Heritage | Terratest (Pty) Ltd | CTS_362329 | 05/05/2016 - 16:47 |
Integrated HIA: Humansrus Solar PV Facility 4 | PROPOSED DEVELOPMENT OF HUMANSRUS SOLAR PV FACILITY 4 ON THE FARM HUMANSRUS 147, PRIESKA DISTRICT AND PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 22/04/2016 | Stefan de Kock, Lita Webley, John Almond, Stephen Stead | Perception Heritage Planning | Perception Heritage Planning | 05/05/2016 - 15:32 | |
Integrated HIA: Humansrus Solar PV Facility 3 | PROPOSED DEVELOPMENT OF HUMANSRUS SOLAR PV FACILITY 3 ON THE FARM HUMANSRUS 147, PRIESKA DISTRICT AND PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 22/04/2016 | Stefan de Kock | Perception Heritage Planning | Perception Heritage Planning | 05/05/2016 - 15:20 | |
Integrated HIA: Humansrus Solar PV Facility 3 | PROPOSED DEVELOPMENT OF HUMANSRUS SOLAR PV FACILITY 3 ON THE FARM HUMANSRUS 147, PRIESKA DISTRICT AND PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 22/04/2016 | Stefan de Kock, Lita Webley, John Almond | Perception Heritage Planning | Perception Heritage Planning | 05/05/2016 - 15:20 | |
Mahlashana HIA | Phase 1 Heritage Impact Assessment report - Mahlashana Road Upgrade Project, near Pomeroy, KwaZulu-Natal Province | HIA Phase 1 | Stephan Gaigher | G&A Heritage Management Consultants | GBS Environmental Consulting | 04/05/2016 - 11:27 |