FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Namakwa Sands Mitigation May 2015 ARCHAEOLOGICAL MITIGATION AT NAMAKWA SANDS, BRAND-SE-BAAI, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE: LANGLAAGTE 3 & SOUTPAN 2 Archaeological Permit Report 25/05/2015 Jayson Orton ASHA Consulting(Pty) Ltd Tronox Namakwa Sands 28/05/2015 - 18:02
HIA of Ethekwini IRPTN corridor 1 Heritage Impact Assessment of the proposed Ethekwini Integrated Rapid Public Transport Network - Corridor 1 HIA Phase 1 09/09/2012 Frans Prins Active Heritage CC eThekwini Municipality - Transport Authority 28/05/2015 - 13:52
TEVREDENHEID / FARM 81, BARKLY WEST FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PROSPECTING AND MINING ACTIVITIES AT THE FARM TEVREDENHEID / FARM 81, BARKLY WEST, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 31/01/2015 Cobus Dreyer Milnex Milnex 27/05/2015 - 21:39
SANDDRAAI 391 GROBLERSHOOP FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED PV ENERGY DEVELOPMENTS AT THE FARM SANDDRAAI 391 NEAR GROBLERSHOOP, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 25/11/2014 Cobus Dreyer Eskom Distribution Division Eskom Distribution Division 27/05/2015 - 21:28
FERRUM – NIEUWEHOOP 400KV TRANSMISSION LINE FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED FERRUM (KATHU) – NIEUWEHOOP (KENHARDT) 400KV TRANSMISSION LINE, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 25/11/2014 Cobus Dreyer Eskom Distribution Division Eskom Distribution Division 27/05/2015 - 21:00
AMITOFO CARE CENTRE EDENPARK BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE AMITOFO CARE CENTRE AT EDENPARK / MANDELA VIEW ALONG THE N8, THABA NCHU-BLOEMFONTEIN Heritage Impact Assessment Specialist Reports 17/04/2015 Cobus Dreyer Iliso Consulting (Pty) Ltd Iliso Consulting (Pty) Ltd 27/05/2015 - 20:34
RIETFONTEIN 107 BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED 5HA ASPHALT PLANT AT PORTION 5, RIETFONTEIN 107, BLOEMSPRUIT, BLOEMFONTEIN Heritage Impact Assessment Specialist Reports 26/04/2015 Cobus Dreyer Nare Sereto Environment & Business Services Nare Sereto Environment & Business Services 27/05/2015 - 20:21
Westgate Randfontein 10km Deviation AIA FOR THE PROPOSED 1 KM DEVIATION OF THE WESTGATE RANDFONTEIN 132KV STRATEGIC SERVITUDE AIA Phase 1 04/05/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Nsovo Environmental Consulting 27/05/2015 - 12:16
EL IDZ PV HERITAGE SURVEY OF THE EAST LONDON IDZ PHOTOVOLTAIC FACILITY , EASTERN CAPE HIA Phase 1 26/03/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - East London 27/05/2015 - 10:12
PIA[D]-Mixed Use development, Jupiter Ext 9, Elandsfontein, EMM, Gauteng Recommended Exemption from further Palaeontological Studies: Proposed Mixed-Use Development (Jupiter Ext 9) on Farms Elandsfontein 90-IR and 108-IR, germiston, Ekurhuleni Metropolitan Municipality, Gauteng PIA Desktop 25/05/2015 John Almond Strategic Environmental Focus (Pty) Ltd - Pretoria 25/05/2015 - 13:48
P2AIA[Final Report]-Test Excavations, Samy's Wholesalers, Erf 44500, KBY, NC Final Report - Samy's Wholesalers Test Excavations AIA Phase 2 25/05/2015 Anton Pelser Samy's Wholesalers 25/05/2015 - 13:34
P2AIA[Interim Report]-Test Excavations, Samy's Wholesalers, Erf 44500, KBY, NC Interim Report - Samy's Wholesalers Extension (Samy's Wholesalers Extension Test Excavations). Test Excavations within the Western Portion of Erf 44500. AIA Phase 2 25/05/2015 Anton Pelser Samy's Wholesalers 25/05/2015 - 13:30
Cultural Heritage Mang Plan and Impact Assessment Cultural Heritage Mang Plan and Impact Assessment for the proposed Umsobomvu Coal Mine, near Dundee, KZN Heritage Impact Assessment Specialist Reports 01/08/2014 Anton van Vollenhoven KwaZulu-Natal Amafa and Research Institute Umsobomvu MIning Holdings (Pty) Ltd 25/05/2015 - 10:52
AIA[P1]-Mixed Use Development, Jupiter Ext 9, Elandsfontein, EMM, Gauteng Phase 1 Archaeological Impact Assessment - Proposed Mixed-use Development (Jupiter Ext 9) on farms Elandsfontein 90-IR and 108-IR, Germiston, Ekurhuleni Metropolitan Municipality, Gauteng AIA Phase 1 25/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 25/05/2015 - 09:00
AIA[P1]-Mixed Use Development, Jupiter Ext 8, Elandsfontein, EMM, Gauteng Phase 1 Archaeological Impact Assessment - Proposed Mixed-Use development (Jupiter Extension 8) on Portion 2 of farm Elandsfontein 90-IR, Ekurhuleni Metropolitan Municipality, Gauteng AIA Phase 1 25/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 25/05/2015 - 08:45
PIA[D]-Mixed Use Development, Jupiter Ext 8, Elandsfontein, EMM, Gauteng Recommended Exemption from further Palaeontological Studies: Proposed Mixed-Use Development (Jupiter Ext 8) on Portion 2 of Farm Elandsfontein 90-IR, Ekurhuleni Metropolitan Municipality, Gauteng PIA Desktop 25/05/2015 John Almond Strategic Environmental Focus (Pty) Ltd - Pretoria 25/05/2015 - 08:40
AIA[P1]-Mixed Use development, Jupiter Ext 8, Elandsfontein, EMM, Gauteng Phase 1 Archaeological Impact Assessment - Proposed Mixed-Use Development (Jupiter Ext 8) on Portion 2 of Farm Elandsfontein 90-IR, Ekurhuleni Metropolitan Municipality, Gauteng AIA Phase 1 25/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 25/05/2015 - 08:35
PIA[D]-Galatyeni Substation, Mbizana, Eastern Cape Palaeontological Desktop Assessment of the Proposed Construction of the Galatyeni Substation, 132kV Loop In / Out Lines and Overhead Lines, near Flagstaff, Mbizana Local Municipality, Eastern Cape PIA Desktop 24/05/2015 Lloyd Rossouw 24/05/2015 - 03:09
AIA[P1]-Galatyeni Substation, Mbizana, Eastern Cape Phase 1 Archaeological Impact Assessment - Proposed Construction of the Galatyeni Substation, 132kV Loop In / Out Lines and Overhead Lines, near Flagstaff, Mbizana Local Municipality, Eastern Cape, South Africa AIA Phase 1 24/05/2015 Karen Van Ryneveld 24/05/2015 - 03:05
Archaeological Survey_KalahariCSP_Apr2015 Archaeological Survey for the Proposed Kalahari Solar Project, Kuruman Magisterial District, NC Province Archaeological Specialist Reports 20/04/2015 Jayson Orton, Steven Walker ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 22/05/2015 - 12:43
HIA-Celebration Sewer Pipeline A, North Riding, Johannesburg, Gauteng HIA-Construction of the Celebration Sewer Pipeline A on Various Agricultural Holdings, North Riding, City of Johannesburg Metropolitan Municipality, Gauteng HIA Phase 1 22/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 22/05/2015 - 09:22
HIA-Celebration Sewer Pipeline B, North Riding, Johannesburg, Gauteng HIA-Construction of the Celebration Sewer Pipeline B on Various Agricultural Holdings, North Riding, City of Johannesburg Metropolitan Municipality, Gauteng HIA Phase 1 22/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 22/05/2015 - 09:03
VanRes Heritage Vanadium Resources Heritage Assessment Phase 1 HIA Phase 1 18/05/2015 21/05/2015 - 22:01
UAR2967_HIA HIA Phase 1 27/04/2015 Natasha Higgitt, Justin du Piesanie, Johan Nel Digby Wells Environmental De Groote Boom Minerals (Pty) Ltd 21/05/2015 - 15:13
Proposed Low Income Housing Project Noenieput, Groot Mier Municipality, Northern Cape Heritage Impact Assessment Report Proposed Low Income Housing Project Noenieput, Groot Mier Municipality, Northern Cape. Heritage Impact Assessment Specialist Reports 30/10/2013 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 21/05/2015 - 13:53
PROPOSED UPGRADING OF AN ACCESS ROAD TO THE D 1291 (NYENDE) CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADING OF AN ACCESS ROAD TO THE D 1291 (NYENDE) NEAR LADYSMITH, KWAZULU-NATAL Heritage Study 28/04/2015 Frans Prins KwaZulu-Natal Amafa and Research Institute Active Heritage CC 21/05/2015 - 09:56
PROPOSED UPGRADING OF DISTRICT ROAD 2353 (POSHINI) CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADING OF DISTRICT ROAD 2353 (POSHINI) NEAR BERGVILLE, KWAZULU-NATAL HIA Phase 1 27/04/2015 Frans Prins KwaZulu-Natal Amafa and Research Institute Active Heritage CC 21/05/2015 - 09:47
UPGRADING OF ROAD D 1376 (EMASWAZINI) CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADING OF ROAD D 1376 (EMASWAZINI) NEAR BERGVILLE, KWAZULU-NATAL. HIA Phase 1 27/04/2015 Frans Prins KwaZulu-Natal Amafa and Research Institute Active Heritage CC 21/05/2015 - 09:40
Proposed Moletjie Regional Water Scheme Proposed Moletjie Regional Water Scheme Polokwane Local Municipality, Limpopo Province Cultural Heritage Scoping Report Heritage Impact Assessment Specialist Reports 06/09/2006 Vhufa Hashu Heritage Consultants Dynamic Integrated Geo-Environmental Services cc 20/05/2015 - 16:37
FibreCo Repeater Sites_ Route 3_Heritage_2015 FibreCo Telecommunications Ltd (FibreCo) was given environmental authorisation (EA) by the Department of Environmental Affairs in 2011 to construct and operate a fibre optic data cable along the national road between Cape Town and Durban (divided into three routes for assessment and authorisation purposes – routes 3, 4 and 5). An agreement reached between FibreCo and other telecommunication companies regarding the construction of the Cape-Durban route has resulted in changes to Route 3 (this project). Routes 4 and 5 have been assessed and discussed in a separate report. Archaeological Specialist Reports 20/05/2015 Celeste Booth SRK Consulting (Pty) Ltd - Pretoria 20/05/2015 - 14:38
Paleo-Kotulo3-Mar15 Palaeontological Heritage Assessment: Combined Desktop & Field-Based Study Palaeontological Specialist Reports 15/03/2015 E Salmond Natura Viva CC Savannah Environmental (Pty) Ltd 20/05/2015 - 13:51
IFIDI Bridge HIA for ISolendalo Environmental Consulting PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF IFIDI VEHICULAR BRIDGE LOCATED IN THE AREA OF BERGVILLE WITHIN THE JURISDICTION OF OKHAHLAMBA LOCAL MUNICIPALITY, UTHUKELA DISTRICT. KWAZULU NATAL PROVINCE. AIA Phase 1 20/05/2015 Munyadziwa Magoma KwaZulu-Natal Amafa and Research Institute Vhubvo Archaeo-Heritage Consultants 20/05/2015 - 13:38
ISolendalo Environmental Consulting PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF IFIDI VEHICULAR BRIDGE LOCATED IN THE AREA OF BERGVILLE WITHIN THE JURISDICTION OF OKHAHLAMBA LOCAL MUNICIPALITY, UTHUKELA DISTRICT. KWAZULU NATAL PROVINCE. AIA Phase 1 20/05/2015 Munyadziwa Magoma KwaZulu-Natal Amafa and Research Institute Vhubvo Archaeo-Heritage Consultants 20/05/2015 - 13:38
HIA-MsengeEmoyeniWatercourse An Archaeological Walk through Survey if the proposed turbine footprint and infrastructure for the Msenge Emoyeni Wind Energy Facility, Bedford District, Blue Crane Route Municipality, Eastern Cape Province Archaeological Specialist Reports 24/03/2014 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 20/05/2015 - 08:54
Pinnacle Point Shell Middens Radiocarbon Dates Radiocarbon dates from the Pinnacle Point Shell Middens. Note that I have uploaded the entire report, as this explains the full context of the the radiocarbon dates. Archaeological Specialist Reports 19/05/2015 20/05/2015 - 01:48
Nooitgedacht 479 Heritage Statement 19/05/2015 - 21:29
Tugela Ferry desktop DESKTOP HERITAGE SURVEY OF THE PROPOSED TUGELA FERRY BRIDGE HIA Phase 1 10/04/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Afzelia Environmental Consultants Pty Ltd 19/05/2015 - 10:57
Tugela Ferry desktop DESKTOP HERITAGE SURVEY OF THE PROPOSED TUGELA FERRY BRIDGE HIA Phase 1 10/04/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Afzelia Environmental Consultants Pty Ltd 19/05/2015 - 10:57
Desktop PIA Lake Umuzi South Bank Extension Palaeontological Impact Assessment: Desktop study PIA Desktop 14/05/2015 Heidi Fourie Dr Heidi Fourie 19/05/2015 - 10:28
Phase 1 Heritage study A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LAKE UMUZI SOUTH BANK EXTENSION IN SECUNDA IN THE MPUMALANGA PROVINCE HIA Phase 1 12/05/2015 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant 19/05/2015 - 10:20
Phase 1 Heritage Impact Assessment - Topigs SA Merino Piggery HIA Phase 1 18/05/2015 Anton Pelser Topigs SA (Pty) Ltd 19/05/2015 - 06:41
HIA-RichardsBayBiomass Heritage Screener for the Proposed 60MW Biomass Plant within the Ricahrds Bay IDZ, Umhlautze Local Munucipality, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 24/04/2015 CTS Heritage Savannah Environmental (Pty) Ltd 14/05/2015 - 16:51
HIA FarmEttrick 182, Hopetown District Northern Cape The proposed localised mining development is situated on a cumulative 4.2 ha portion on the property known as Ettrick 182 in the Hopetown District of the Northern Cape, South Africa (1 :50,000 map reference: 2923BD Torquay HIA Phase 1 23/10/2005 Karen Van Ryneveld Basadi Ba Tlou Supply Chain Solutions CC 14/05/2015 - 14:32
AIA FarmEttrick 182, Hopetown District Northern Cape Cultural Resources Management Impact Assessment: (Portions of) Ettrick 182, Hopetown District, Northern Cape, South Africa AIA Phase 1 31/10/2005 Karen Van Ryneveld Basadi Ba Tlou Supply Chain Solutions CC 14/05/2015 - 12:33
AN UPDATED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBERG PLATINUM MINE (PPM) AN UPDATED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBERG PLATINUM MINE (PPM) NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA AIA Phase 1 01/08/2013 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant SLR Consulting (Africa) 14/05/2015 - 09:08
HIA Proposed Development of the G14 Pipeline PROPOSED DEVELOPMENT OF THE G14 PIPELINE BY RAND WATER: Heritage Impact Assessment for the proposed development of the G14 Pipeline between Forest Hill and Turffontein Nek, Southern Johannesburg, Johannesburg Metropolitan Municipality, Gauteng Province. HIA Phase 1 18/04/2015 Polke Birkholtz PGS Heritage and Grave Relocation Consultants Enkanyini Projects, Rand Water 12/05/2015 - 12:10
Ntsika Mining Advisory CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (ACT 28 OF 2002) IN RESPECT OF PROSPECTING OF STRONTIUM (SR), RUTILE (HEAVY MINERAL) (RT), MONAZITE (HEAVY MINERAL) (MZ), HEAVY MINERALS (GENERAL) (HM), LEUCOXENE (HEAVY MINERAL) (LX), URANIUM ORE (U), CHRYSOBERYL (GEMSTONE) (GCB), DIAMOND (DIA), COAL (C), STONE AGGREGATE; GRAVEL (ST), SULPHUR (IN PYRITE) (SPY), FLUORSPAR (F), PLATINUM GROUP METALS (PGM), GOLD ORE (AU), SILVER ORE (AG), CHROME ORE (CR), COPPER ORE (CU), COBALT (CO), NICKEL ORE (NI), VANADIUM ORE (V) AND IRON ORE (FE) ON THE FARM KLIPFONTEIN 268 JR (EXCLUDING PORTION 1), THE FARM HONINGNESTKRANS 269 JR, THE FARM HAAKDOORNBOOM 267 JR, PORTION 3, 5, 6 AND THE REMAINING EXTENT OF THE FARM WESTZELRUST 223 JR, THE FARM DE ONDERSTEPOORT 300 JR (EXCLUDING 10, 45, 73, 75, 76, 77, 78, 82, 83, 86, 87, 88, 100, 101, 102, 103, 104, 105, 138, 139, 140, 142 AND 100 OF THE FARM DE ONDERSTEPOORT 300 JR) SITUATED IN THE MAGISTERIAL DISTRICT OF PRETORIA, GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 11/05/2015 Plaatjie Khonziwe 12/05/2015 - 09:33
Ntsika Mining Advisory CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (ACT 28 OF 2002) IN RESPECT OF PROSPECTING OF STRONTIUM (SR), RUTILE (HEAVY MINERAL) (RT), MONAZITE (HEAVY MINERAL) (MZ), HEAVY MINERALS (GENERAL) (HM), LEUCOXENE (HEAVY MINERAL) (LX), URANIUM ORE (U), CHRYSOBERYL (GEMSTONE) (GCB), DIAMOND (DIA), COAL (C), STONE AGGREGATE; GRAVEL (ST), SULPHUR (IN PYRITE) (SPY), FLUORSPAR (F), PLATINUM GROUP METALS (PGM), GOLD ORE (AU), SILVER ORE (AG), CHROME ORE (CR), COPPER ORE (CU), COBALT (CO), NICKEL ORE (NI), VANADIUM ORE (V) AND IRON ORE (FE) ON THE FARM KLIPFONTEIN 268 JR (EXCLUDING PORTION 1), THE FARM HONINGNESTKRANS 269 JR, THE FARM HAAKDOORNBOOM 267 JR, PORTION 3, 5, 6 AND THE REMAINING EXTENT OF THE FARM WESTZELRUST 223 JR, THE FARM DE ONDERSTEPOORT 300 JR (EXCLUDING 10, 45, 73, 75, 76, 77, 78, 82, 83, 86, 87, 88, 100, 101, 102, 103, 104, 105, 138, 139, 140, 142 AND 100 OF THE FARM DE ONDERSTEPOORT 300 JR) SITUATED IN THE MAGISTERIAL DISTRICT OF PRETORIA, GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 11/05/2015 Plaatjie Khonziwe 12/05/2015 - 09:33
Mooikloof Ridge Bulk Pipeline- Heritage Report Heritage impact assessment for the PROPOSED INSTALLATION OF A BULK WATER PIPELINE IN THE MOOIKLOOF REGION OF PRETORIA EAST, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 10/02/2015 Johnny Van Schalkwyk Envirolution Consulting (Pty) Ltd Envirolution Consulting (Pty) Ltd 11/05/2015 - 11:54
HIA-Bende Bulk Water Supply Scheme, ADM, Eastern Cape HIA-Bende Bulk Water Supply Scheme, Amathole District Municipality, Eastern Cape HIA Phase 1 11/05/2015 Karen Van Ryneveld, John Almond Aurecon - Port Elizabeth 11/05/2015 - 08:13