FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post datesort ascending
100 10th Street, Linden, Heritage Recommendations 100, 10th Street, Linden, Portion 2 of Erf 173, Heritage Opinion Heritage Statement 09/06/2014 Stephan Gaigher 06/08/2014 - 11:48
Dodoma Housing Phase 1 Heritage Impact Assessment Report: Proposed Dodoma Avenue (Kennedy Road) Housing Project, eThekwini Metropolitan Municipality, KwaZulu-Natal HIA Phase 1 29/05/2014 Elizabeth Wahl eThembeni Cultural Heritage eThekwini Metropolitan Municipality 06/08/2014 - 10:34
St Faiths Substation Phase 1 Heritage Impact Assessment Report: Proposed St. Faiths 400/132 kV Sub-Station and Associated Power Lines, Port Shepstone, uMzumbe, Hibiscus Coast and Ezinqoleni Local Municipalities, Ugu District, KwaZulu-Natal HIA Phase 1 14/03/2014 Elizabeth Wahl eThembeni Cultural Heritage Eskom - SOU 06/08/2014 - 08:22
HIA 1GW Upington Solar Park Heritage Impact Assessment Report for the proposed 1GW Upington Solar Park within the // Khara Hais Municipality, Northern Cape Province Heritage Scoping 01/01/2014 Johnny Van Schalkwyk Lidwala Consulting Engineers (SA) (Pty) Ltd 05/08/2014 - 16:17
CLARENS WATER TREATMENT WORKS CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADING OF THE CLARENS WATER TREATMENT WORKS, FREE STATE PROVINCE HIA Phase 1 15/05/2014 Frans Prins Active Heritage CC E&D Consulting Services cc CTS_170473 05/08/2014 - 13:20
Senekal 2 - Paleo Desktop Palaeontological Heritage Impact Assessment Report on the Site of a Proposed Solar Power Production Facility known as the Senekal 2 Solar Energy Facility on the farm Harlingen 13433, Kwa-zulu Natal Province PIA Desktop 13/07/2014 Barry Millsteed BM Geological Services Savannah Environmental (Pty) Ltd 05/08/2014 - 12:51
Senekal 2 - AIA Archaeological Impact Assessment for the Proposed Senekal 2 Solar Energy Facility near Mkuze, Kwazulu Natal Archaeological Specialist Reports 14/07/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 05/08/2014 - 12:48
Senekal 1 - Paleo Desktop Palaeontological Heritage Impact Assessment Report on the Site of a Proposed Solar Power Production Facility known as the Senekal 1 Solar Energy Facility on the Remaining Extent of the Farm Iselworth 72 HU, Kwa-zulu Natal Province PIA Desktop 13/07/2014 Barry Millsteed BM Geological Services Savannah Environmental (Pty) Ltd 05/08/2014 - 12:45
Senekal 1 - AIA Archaeological Impact Assessment for the Proposed Senekal 1 5MW Solar Energy Facility near Mkuze, Kwazulu Natal Archaeological Specialist Reports 14/07/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 05/08/2014 - 12:42
CCS KeiGate EL Phase 1 PIA CCS KeiGate EL Phase 1 PIA PIA Phase 1 31/07/2014 Lloyd Rossouw Control Civil Services cc 05/08/2014 - 12:00
AIA FOR THE PROPOSED HIGH ENERGY FUEL PLANT AND RAILWAY SIDING, SISHEN IRON ORE MINE, NORTHERN CAPE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARCATED SURFACE PORTIONS ON THE FARMS SACHA 468 AND WOON 469 FOR THE PROPOSED HIGH ENERGY FUEL PLANT AND RAILWAY SIDING, SISHEN IRON ORE MINE, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 31/01/2014 Neels Kruger AGES (PTY) Ltd - Pretoria Kumba Iron Ore 05/08/2014 - 11:48
AIA FOP PROPOSED STORMWATER INFRASTRUCTURE AT THE SISHEN MINE, NORTHERN CAPE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARCATED SURFACE PORTIONS ON THE FARMS SACHA 468, SIMS 462 AND SEKGAME 461 FOR THE PROPOSED STORMWATER INFRASTRUCTURE (CLEAN WATER CUT-OFF BERM & GROUNDWATER DAM) FOR THE SISHEN MINE, KATHU, NORTHERN CAPE PROVINCE, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 31/03/2014 Neels Kruger AGES (PTY) Ltd - Pretoria Kumba Iron Ore 05/08/2014 - 11:33
West Riding Reservoir Pipeline Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed West Riding Reservoir Water Pipeline, eThekwini Metropolitan Municipality, KwaZulu-Natal, South Africa HIA Letter of Exemption 05/08/2014 Elizabeth Wahl eThembeni Cultural Heritage GIBB Engineering & Science - Durban 05/08/2014 - 11:31
INVESTIGATION FOR THE PROPOSED DEMARCATIONS RESIDENTIAL SITES ON FARM UITVLUGT 887 KS , LIMPOPO INVESTIGATIONS FOR THE PROPOSED DEMARCATIONS RESIDENTIAL SITES ON FARM UITVLUGT 887 KS IN CLOSE PROXIMITY OF DE HOOP DAM, WITHIN GREATER TUBATSE LOCAL MUNICIPALITY, SEKHUKHUNE DISTRICT, LIMPOPO PROVINCE AIA Phase 1 16/07/2013 Ndivhuwo Eric Mathoho 05/08/2014 - 10:25
NGWEGWENI ACCESS ROAD HERITAGE SURVEY OF THE PROPOSED NGWEGWENI ACCESS ROAD, NKANDLA WARD 4, UTHUNGULU DISTRICT MUNICIPALITY, KWAZULU-NATAL HIA Phase 1 21/07/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Geoff Silk Civil & Mining Consultant cc 05/08/2014 - 07:48
P1AIA-Keigate Commercial Development, Farm 1307 and Portion of RE-1-665, EL, EC Keigate Commercial Development, Farm 1307 and Portion of Farm RE/1/665 East London, Buffalo City Metropolitan Municipality, Eastern Cape, South Africa AIA Phase 1 16/06/2014 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Control Civil Services cc 04/08/2014 - 12:20
P1AIA-Keigate Commercial Development, Farm 1307 and Portion of RE-1-665, EL, EC Keigate Commercial Development, Farm 1307 and Portion of Farm RE/1/665 East London, Buffalo City Metropolitan Municipality, Eastern Cape, South Africa AIA Phase 1 16/06/2014 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Control Civil Services cc 04/08/2014 - 12:20
Heritage Statement Erf 3025 Constantia Ablution Blocks, former Tokai Primary School Heritage Statement 20/06/2014 Frederik Saaiman Vermeulen MLH Architects & Planners Constantia Uitsig Wine Estate (Pty) Ltd 04/08/2014 - 11:58
Educational Centre at Voortrekkermonument A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE BUILDING OF AN EDUCATIONAL CENTRE AT THE VOORTREKKER MONUMENT HERITAGE SITE ON THE FARM GROENKLOOF 358 JR, PRETORIA DISTRICT, GAUTENG PROVINCE HIA Phase 1 01/08/2014 Anton van Vollenhoven Archaetnos CC Voortrekker Monument and Nature Reserve 01/08/2014 - 08:18
Metsimatle Secondary School, Oranjeville Exemption of Phase 1 Heritage Impact Assessment for the replacement of the existing Metsimatle Secondary School, Oranjeville Townlands No. 1124, Oranjeville, FS Province. HIA Letter of Exemption 28/05/2014 Lloyd Rossouw National Museum Bloemfontein Eko Environmental 31/07/2014 - 10:08
Report Klerksdorp REPORT KLERKSDORP BRAKSPRUIT POWERLINE ENVIROLUTION 2014 (Brakspruit) HIA Phase 1 27/02/2014 Cobus Dreyer Envirolution Consulting (Pty) Ltd 30/07/2014 - 09:26
PIA - Kotulo Palaeontological Heritage Assessment: Desktop Study of the Proposed Kotulo Tsatsi Energy Solar Park, Including Concentrated Solar Power (Tower & Through Technologies) and Photovoltaic (PV) Solar Facilities, near Kenhardt, Northern Cape PIA Desktop 14/05/2014 John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 29/07/2014 - 15:29
PIA - Kotulo Palaeontological Heritage Assessment: Desktop Study of the Proposed Kotulo Tsatsi Energy Solar Park, Including Concentrated Solar Power (Tower & Through Technologies) and Photovoltaic (PV) Solar Facilities, near Kenhardt, Northern Cape PIA Desktop 14/05/2014 John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 29/07/2014 - 15:29
ASR - Kotulo Archaeological Scoping Report for the Proposed Kotulo Tsatsi Energy Solar Park including Concentrated Solar Power (Tower & Through Technologies) and Photovoltaic (PV) Solar Facilities, Northern Cape Archaeological Specialist Reports 12/05/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 29/07/2014 - 15:25
Wolmaransstad Extension 16 Phase 1 HIA Phase 1 HIA Report for the proposed subdivision of the Remaining Extent of Portion 2 of the farm Wolmaransstad Town and Townlands 184HO, WOlmaransstad. North West Province HIA Phase 1 03/02/2014 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 29/07/2014 - 13:06
Ndumo Stock Housing Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed Ndumo Rental Stock Housing Project, KwaZulu-Natal, South Africa HIA Letter of Exemption 12/06/2014 Elizabeth Wahl eThembeni Cultural Heritage HENWOOD & NXUMALO CONSULTING ENGINEERS CC 29/07/2014 - 08:46
Desktop Palaeontological Impact Assessment Report Annexure A Desktop Palaeontological Impact Assessment Report_Aggregate Quarry on Dwaalfontein 565_V1. PIA Desktop 13/07/2014 Barry Millsteed Heritage Contracts and Archaeological Consulting 28/07/2014 - 14:13
HIA - Eskom Delareyville A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 132KV POWER LINES BETWEEN THE DELAREYVILLE SUBSTATION AND THE PROPOSED NEW KOPELA AND PHAHAMENG SUBSTATIONS IN THE NORTH WEST PROVINCE Heritage Statement 01/07/2014 Julius CC Pistorius SRK Consulting (Pty) Ltd - Pretoria 28/07/2014 - 12:30
HIA - Eskom Delareyville A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 132KV POWER LINES BETWEEN THE DELAREYVILLE SUBSTATION AND THE PROPOSED NEW KOPELA AND PHAHAMENG SUBSTATIONS IN THE NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 01/07/2014 Julius CC Pistorius SRK Consulting (Pty) Ltd - Pretoria 28/07/2014 - 12:16
ASR - Sekoko Archaeological Scoping Report for the Proposed Sekoko Waterberg Collier, Lephalale, Limpopo Province Archaeological Specialist Reports 17/12/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/07/2014 - 14:25
AIA - Newcastle AIA for the Proposed Construction of the 5MW Newcastle Solar Energy Facility near Newcastle, KwaZulu Natal Archaeological Specialist Reports 14/07/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/07/2014 - 09:43
Paleo - Pongola Desktop Palaeontological Heritage Impact Assessment Report on the site of a Proposed Solar Power Production Facility known as the Pongola Solar Energy Facility to be located on Portion 260 of the Farm Pongola 61, Kwazulu Natal Province Heritage Impact Assessment Specialist Reports 16/07/2014 Barry Millsteed BM Geological Services Savannah Environmental (Pty) Ltd 25/07/2014 - 09:08
HIA portion of plot 1533, MARCHAND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED HOTEL DEVELOPMENT ONA SECTION OF THE FARM KAKAMAS SUID, MARCHAND, KAI !GARIB MUNICIPALITY NORTHERN CAPE PROVINCE HIA Phase 1 15/07/2014 Johnny Van Schalkwyk MEG Environmental Impact Studies 24/07/2014 - 21:51
Paleo - Newcastle Desktop Palaeontological Heritage Impact Assessment Report on a site of a Proposed Solar Power Production Facility known as the Newcastle Solar Energy Facility to be Located ion the Remainder of the EFT 13661 within Portion 17 of The Farm Tweefontein 344, Kwazulu-Natal Province Palaeontological Specialist Reports 13/07/2014 Barry Millsteed Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 24/07/2014 - 16:58
Harmony Estate - exemption RECOMMENDED EXEMPTION FROM AN ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT ON ERVEN 4995, 4997, 5007, & 5009, HARMONY ESTATE, SPRINGBOK (NAMA KHOI MUNICIPALITY), NORTHERN CAPE PROVINCE HIA Letter of Exemption 27/06/2014 Jonathan Kaplan Agency for Cultural Resources Management Enviro Logic 24/07/2014 - 15:52
Blue Bank Cemetery, Ladysmith CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED BLUEBANK CEMETERY, LADYSMITH, EMNAMBITHI LOCAL MUNICIPALITY, UTHUKELA DISTRICT, KWAZULU-NATAL HIA Phase 1 22/07/2014 Frans Prins Active Heritage CC Nature's Environmental Agency 24/07/2014 - 15:28
Loeriesfontein 2 HMP LOERIESFONTEIN 2 WIND ENERGY FACILITY - Heritage Management Plan for Construction Heritage Study 04/04/2014 Marko Hutten PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 24/07/2014 - 15:18
Khobab HMP KHOBAB WIND ENERGY FACILITY - Heritage Management Plan for Construction Heritage Study 04/04/2014 Marko Hutten PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 24/07/2014 - 15:16
Zeerust HIA Phase 1 HIA Report for the Proposed Zeerust Chicken Abattoir in Zeerust, North West Province HIA Phase 1 31/01/2014 Anton Pelser A Pelser Archaeological Consulting Strategic Environmental Focus (Pty) Ltd - Pretoria 24/07/2014 - 14:38
HIA Mathanjana A HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED PROVISION OF BULK WATER SUPPLY FROM RUST DE WINTER DAM TO MATHANJANA MAGISTERIAL DISTRICT , LIMPOPO/MPUMALANGA PROVINCES, SOUTH AFRICA Nkosinathi Godfrey Tomose Green Gold Consulting 24/07/2014 - 14:31
Table Mountain National Park- Park Management Plan March 2008 Table Mountain National Park- Park Management Plan March 2008 Conservation Management Plan 15/03/2008 Paddy Gordon, Gregory Ontong Table Mountain National Park Table Mountain National Park 24/07/2014 - 13:16
AIA FOR THE PROPOSED ANJUTONE 2 SOLAR PARK, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM MACHOROGAN 106 FOR THE PROPOSED ANJUTONE 2 PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 24/07/2014 Neels Kruger AGES (PTY) Ltd - Pretoria Vidigenix 24/07/2014 - 12:05
AIA FOR THE PROPOSED ANJUTONE 2 PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM MACHOROGAN 106 FOR THE PROPOSED ANJUTONE 2 PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 24/07/2014 Neels Kruger AGES (PTY) Ltd - Pretoria Vidigenix 24/07/2014 - 12:00
AIA FOR THE PROPOSED VIDIGENIX 2 SOLAR PARK, NORTHWEST PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM KANGKATJES 919 HN FOR THE PROPOSED VIDIGENIX 2 PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, GREATER TAUNG LOCAL MUNICIPALITY, NORTHWEST PROVINCE AIA Phase 1 24/07/2014 Neels Kruger AGES (PTY) Ltd - Pretoria Vidigenix 24/07/2014 - 10:58
HMP for NOUPOORT WIND ENERGY FACILITY NOUPOORT WIND ENERGY FACILITY - Heritage Management Plan for Construction Heritage Study 04/04/2014 Marko Hutten PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 24/07/2014 - 10:55
Memel Phase 1 HIA Memel Phase 1 HIA Lloyd Rossouw Paleo Field Services 23/07/2014 - 14:32
Vrede Phase 1 HIA Vrede Phase 1 HIA Lloyd Rossouw Paleo Field Services 23/07/2014 - 14:03
Thabong Homestead Phase 1 HIA Lloyd Rossouw Paleo Field Services 23/07/2014 - 13:20
AIA FOR THE PROPOSED VIDIGENIX PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM KANGKATJES 919 HN FOR THE PROPOSED VIDIGENIX PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, GREATER TAUNG LOCAL MUNICIPALITY, NORTHWEST PROVINCE AIA Phase 1 30/11/2013 Neels Kruger AGES (PTY) Ltd - Pretoria Vidigenix 23/07/2014 - 13:10
Letter for exemption of Arcaeological Assessment AIA Desktop 23/07/2014 Jonathan Kaplan Agency for Cultural Resources Management 23/07/2014 - 12:04