THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 11451 - 11500 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 |
Post date![]() |
---|---|---|---|---|---|---|---|---|
HIA Brandvlei Reverse Osmosis Treatment Plant | Heritage Impact Assessment of the proposed reverse osmosis plant and associated infrastructure, Brandvlei, Hantam Local Municipality, Northern Cape. | HIA Phase 1 | 01/12/2012 | Lita Webley, Jayson Orton | ACO Associates CC | Van Zyl Environmental Consultants | 22/04/2014 - 17:42 | |
PIA: Desktop Study Welcome Wood PV Power Station 2&3 | PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY Proposed PV power stations Welcome Wood II and III adjacent to Welcome Wood Substation, near Daniëlskuil, Northern Cape Province | PIA Desktop | 01/02/2012 | John E Almond | Natura Viva CC | Van Zyl Environmental Consultants | 22/04/2014 - 16:07 | |
AIA Phase 1 Portion 4 & 5 of Farm 457 (Welcome Wood PV 2&3) | Archaeological Impact Assessment Phase 1: Proposed development of a PV Power Station at Welcome Wood (extended area), near Owendale, Northern Cape | AIA Phase 1 | 02/03/2012 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 22/04/2014 - 15:46 | |
PIA-Kati-Kati Housing Project, Kati-Kati (near Cathcart), Eastern Cape | Palaeontological Impact Assessment for Kati-Kati Housing Project, Kati-Kati, Cathcart | PIA Phase 1 | 22/04/2014 | Robert Gess | 22/04/2014 - 14:49 | |||
AIA-Kati-Kati Housing Project, Kati-Kati (near Cathcart), Eastern Cape | Phase 1 Archaeological Impact Assessment - Kati-Kati Housing Project, (Portion of) Erf 633, Kati-Kati (near Cathcart), Eastern Cape, South Africa | AIA Phase 1 | 07/03/2014 | Karen Van Ryneveld | 22/04/2014 - 14:33 | |||
First phase HIA for the proposed decommissioning of historic machinery n the Vereeniging property of Rand Water, | First phase HIA for the proposed decommissioning of historic machinery inside Engine Room no.1 and Boiler Houses no.1 and 2 as well as the alteration to the roof of Boiler House no. 1 and the demolition of Boiler House no. 2 on the Vereeniging property of Rand Water | AIA Phase 1 | 25/03/2014 | Sidney Miller | Rand Water | Aurecon - Head Office | 22/04/2014 - 14:19 | |
NONDABUYA PIPELINE | HERITAGE SURVEY OF THE JOZINI INGWAVUMA WATER SUPPLY PROJECT; NONDABUYA PIPELINE | HIA Phase 1 | 11/08/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | WSP Environmental Pty Ltd - Durban | 22/04/2014 - 12:43 | |
Klipgats Pan mitigation report | ARCHAEOLOGICAL MITIGATION OF LATER STONE AGE SITES ON THE REMAINDER OF PORTION 4 OF KLIPGATS PAN 117, PRIESKA MAGISTERIAL DISTRICT, NORTHERN CAPE | Archaeological Permit Report | 15/04/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Mulilo Sonnedix Prieska PV (Pty) Ltd | 17/04/2014 - 15:32 | |
Proposed reopening of an existing borrow pit at Mothibistad near Kuruman in the Northern Cape | Request: Exemption from having to conduct an archaeological assessment, the proposed reuse of an existing borrow pit at Mothibistad near Kuruman, Northern Cape | HIA Letter of Exemption | 19/04/2014 | Enviroafrica CC | 17/04/2014 - 11:21 | |||
AIA Industrial Park known as Chloorkop North, Gauteng. | Archaeological Impact Assessment Industrial Park known as Chloorkop North, Gauteng. | AIA Phase 1 | 29/03/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 17/04/2014 - 06:13 | |
Scoping HIA: Upington Solar Thermal 3 | Proposed development of Phase 2 and Phase 3 of the Upington Solar Thermal Plant on Portion 3 of the Farm McTaggarts Camp 453 near Upington, Northern Cape: Scoping Phase Heritage Input | Heritage Scoping | 01/09/2013 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 16/04/2014 - 13:38 | |
PHASE 1 HIA REPORT FOR THE PROPOSED | PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT (CITY DEEP EXT. 29) ON THE REMAINING EXTENT OF KLIPRIVIERSBERG 106IR CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG APAC014/10 | HIA Phase 1 | 03/02/2014 | Anton Pelser | A Pelser Archaeological Consulting | iProp Proprietary Limited | 16/04/2014 - 13:33 | |
PHASE 1 HIA REPORT FOR THE PROPOSED | PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT (CITY DEEP EXT. 29) ON THE REMAINING EXTENT OF KLIPRIVIERSBERG 106IR CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG APAC014/10 | HIA Phase 1 | 03/02/2014 | Anton Pelser | A Pelser Archaeological Consulting | iProp Proprietary Limited | 16/04/2014 - 13:21 | |
HIA - Ilanga Solar | Heritage Impact Assessment for the Proposed Establishment of the Ilanga Solar Thermal Power Plant near Upington, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 31/05/2011 | Johnny Van Schalkwyk | Savannah Environmental (Pty) Ltd | 16/04/2014 - 12:24 | ||
Deviations to approved plan 446-09-06 | Richard Arnold Nepgen | 16/04/2014 - 10:45 | ||||||
Updated Phase 1 HIA on Droogenfontein | UPDATED REPORT ON A PHASE 1 HIA FOR A PROPOSED COAL MINE ON PORTIONS 26, 46 & 47 OF THE FARM DROOGENFONTEIN 242IR, DELMAS DISTRICT, MPUMALANGA | HIA Phase 1 | 16/04/2014 | Anton Pelser | Shangoni Management Services | 16/04/2014 - 10:03 | ||
Deviation to Approved plan 464-07-04 | Richard Arnold Nepgen | 16/04/2014 - 09:25 | ||||||
Eston HIA | Heritage Impact Assessment of the Greater Eston Bulk Water Supply Project, KZN | HIA Phase 1 | 21/05/2009 | Len van Schalkwyk | 15/04/2014 - 15:54 | |||
Vuyani Hloba | The proposed forestry projects by D.T. Hloba (15ha) in respect of the same activity occurring in several locations in Stranger’s Rest farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 16:40 | |
Mnyembane | The Eucalyptus forestry projects proposed by V.V. Mnyembane (25ha), in respect of the same activity occurring in several locations in Driefontein 147ES Portion 3 farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 16:34 | |
Ntanzi | The proposed forestry projects by S.R.Ntanzi (40ha) in respect of the same activity occurring in several locations in Roodewal 148ES Portion 12 farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 16:31 | |
AIA - Bosjesmanberg Power | Archaeological Impact Assessment for the Proposed Bosjesmanberg Solar Facility and associated powerline options, located close to Copperton in the northern Cape. The attached Archaeological Impact Assessment refers to the entire Bosjesmansberg Solar Energy Facility (4 X 75MW projects) and power line infrastructure. SAHRA previously submitted comments with respect to the 4 proposed solar projects and split reports were submitted for each 75MW project. SAHRAs comments are requested on the power line component referred to in the consolidated AIA. | AIA Desktop | 20/12/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 14/04/2014 - 15:20 | |
Sibayi | The proposed forestry projects by N.A. Sibayi (40ha) in respect of the same activity occurring in several locations in Doefheids Bron 145ES Portion 2 farm in Umzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 14:46 | |
NOTICE OF BASIC ASSESSMENT PROCESS FOR THE PROPOSED DEMOLISHING OF THE EKANGALA OLD OXIDATION PONDS | NOTICE OF BASIC ASSESSMENT PROCESS FOR THE PROPOSED DEMOLISHING OF THE EKANGALA OLD OXIDATION PONDS ON BEHALF OF THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY WITHIN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | Non Impact Assessment Related Reports | 24/02/2014 | Khuliso Mudau | Nsovo Environmental Consulting | Nsovo Environmental Consulting | 14/04/2014 - 14:06 | |
HIA: Swaziland Rail Link | Cultural heritage impact assessment for THE PROPOSED SWAZILAND RAIL LINK, WESTERN SECTION, MPUMALANGA REGION | HIA Phase 1 | 01/09/2013 | Johnny Van Schalkwyk | Aurecon - Head Office | 14/04/2014 - 14:00 | ||
Zala | The proposed forestry projects by Zala, C.W. (10ha) in respect of the same activity occurring in several locations in Bedford 180ES Portion A farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 13:40 | |
Mdlozini | The proposed Eucalyptus forestry projects by H.D. Mdlozini (5ha) occurring in locations in Nienjaar Fontein 100 ES farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 13:30 | |
Mahlawe | The proposed Eucalyptus forestry projects by W.P Mahlawe (40ha), occurring in location in Vlakplaats 110ES Portion 10 (a portion of 2), farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 14/04/2014 - 10:52 | |
KwaCele HIA | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED KWACELE AND SURROUNDS BULK SEWER INFRASTRUCTURE, ETHEKWENI METRO MUNICIPALITY. | HIA Phase 1 | 15/12/2013 | Frans Prins | Active Heritage CC | Jeffares & Green - Pietermaritzburg | 14/04/2014 - 09:55 | |
Ga-Nkoana Human Remains | Heritage Inspection report for suspected human burial accidentally discovered during construction work for Apel,Nkuona and Mashung Electrification in Fetakgomo Local Municipality of Limpopo Province | Site Inspection Report | 03/02/2014 | McEdward Murimbika | 14/04/2014 - 08:44 | |||
HIA 182, 184 & 185 OF GOWRIE 1930 | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE REMAINDER OF PORTION 182, PORTION 184 (OF 182) AND 185 OF (182) OF THE FARM GOWRIE NO 1930, REGISTRATION DIVISION FS (THE OLD STOCKYARDS), NOTTINGHAM ROAD, KWAZULU-NATAL. | Heritage Scoping | 14/04/2014 | Frans Prins, Sian Hall | Active Heritage CC | Royal Haskoning DHV | 14/04/2014 - 08:36 | |
Georgedale HIA | Phase One Heritage Impact Assessment of the proposed Georgedale and Surrounds Bulk Sewer Infrastructure, eThekwini Metro Municipality | HIA Phase 1 | 15/12/2013 | Frans Prins | Active Heritage CC | Jeffares & Green - Pietermaritzburg | 14/04/2014 - 08:35 | |
P1AIA-Portions of Erf 1 & 176, Cofimvaba, EC | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SUBDIVISION AND REZONING OF PORTIONS ON REMAINDER ERF 1 AND ERF 176, COFIMVABA, EASTERN CAPE, SOUTH AFRICA | AIA Phase 1 | 25/03/2014 | Karen Van Ryneveld, John E Almond | Intsika Yethu Local Municipality | CTS_162035 | 11/04/2014 - 19:28 | |
Damoi | The proposed forestry projects by S. Damoi (40ha) in respect of the same activity occurring in several locations in Nooitgedacht farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 15:51 | |
G.A.M Mbombo | The proposed forestry projects by G.A. Mbombo (15ha) in respect of the same activity occurring in several locations in Deepkloof farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 15:47 | |
Eugene N. Dlamini | The proposed Eucalyptus forestry projects by Ngevu Development Company (193ha), occurring in the location lourens 69 farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 15:41 | |
B.J Mbanjwa | The proposed Eucalyptus forestry projects by B.J Mbanjwa occurring in Roodewal 209 farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province. | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 15:27 | |
Paleo - Umbani | Desktop Palaeontological Heritage Impact Assessment Report on the site of the proposed coal-fired plant to be known as the Umbani Power Plant on a site near Kriel, Mpumalanga Province | Palaeontological Specialist Reports | 06/02/2014 | Barry Millsteed | Savannah Environmental (Pty) Ltd | 11/04/2014 - 15:09 | ||
ASR - Umbani | Archaeological Scoping Report for the Proposed Establishment of the Umbani Coal-Fired Power Plant near Kriel, Mpumalanga Province | Archaeological Specialist Reports | 10/02/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 11/04/2014 - 15:07 | |
Gxumisa | The proposed Eucalyptus forestry projects by P. W. Gxumisa (24ha) occurring in locations in Kroomdraai 127ES Portion 13, 15, 17 & 18 farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 14:50 | |
Memela | The proposed forestry projects by Memela, M.W. (25ha) in respect of the same activity occurring in several locations in Boucher 15069ET Portion 1 farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw, Frans Roodt | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 14:13 | |
Bonginkosi Mbanjwa | The proposed forestry projects by Mbanjwa, B.W. (40ha) in respect of the same activity occurring in several locations in Bedford 180ES Portion A farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 13:58 | |
Paleo - Stormberg Renewable | Desktop Palaeontological Heritage Impact Assessment Report on the Site of the Proposed Solar and Wind Energy Generation Facilities (Stormberg Project) to be location on various farms near Sterkstroom, Eastern Cape Province | Heritage Impact Assessment Specialist Reports | 04/06/2013 | Barry Millsteed | Savannah Environmental (Pty) Ltd | 11/04/2014 - 10:42 | ||
ASR - Stormberg Renewable | Archaeological Scoping Report for the Proposed Stormberg Renewable Energy Project, Sterkstroom District, Eastern Cape | Archaeological Specialist Reports | 20/06/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 11/04/2014 - 10:40 | |
Pakkies | The proposed forestry projects by B.N. Pakkies (18ha) in respect of the same activity occurring in several locations in Valkop farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 09:51 | |
LETTER OF RECOMMENDATION FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MASAKHANE VILLAGE HOUSING PROJECT ON ERF 8531 AND ERF 52009, IBHAYI, PORT ELIZABETH, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE. | HIA Letter of Exemption | 07/04/2014 | Celeste Booth | Eastern Cape Provincial Heritage Resources Authority | Nelson Mandela Bay Municipality | 09/04/2014 - 10:35 | |
LETTER OF RECOMMENDATION FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MASAKHANE VILLAGE HOUSING PROJECT ON ERF 8531 AND ERF 52009, IBHAYI, PORT ELIZABETH, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE. | HIA Letter of Exemption | 07/04/2014 | Celeste Booth | Eastern Cape Provincial Heritage Resources Authority | Nelson Mandela Bay Municipality | 09/04/2014 - 10:15 | |
Exemption from an Archaeological Impact Study | Request for Exemption from an Archaeological Impact Study: Prevention of Water Ingress into Mined out Areas of the Witwatersrand Mining Basin, Gauteng Province | HIA Letter of Exemption | 25/03/2014 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Zitholele Consulting | 09/04/2014 - 08:19 | |
HIA Report for Solar-Ferrum 400kV Power Line | Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province | HIA Phase 1 | 15/04/2014 | Stephan Gaigher | Department of Environmental Affairs | Zitholele Consulting | 09/04/2014 - 07:48 | |
HIA Pongola-Candover 132kv Power Line BA2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover Switching Station, development of the Golela 132/22 kV Substation | HIA Phase 1 | 15/04/2014 | Wouter Fourie | Department of Environmental Affairs | Zitholele Consulting | 09/04/2014 - 06:58 |