THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 12901 - 12950 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 |
Post date![]() |
---|---|---|---|---|---|---|---|---|
Heritage Report TSE Distribution Substation 732 | Archaeological Impact Assessment for the Proposed Establishment of the TSE Distribution Substation on Portion 8 of the Farm Damfontein 114, Near Nourpoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 08/02/2013 - 11:12 | ||
Palaeontology Report for Tse Distribution Substation 732 | Proposed TSE Distribution Substation, Noupoort, Northern Cape Province. Scoping Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | Skarab CC | 08/02/2013 - 11:06 | ||
Heritage Report for TSE Distribution Substation 732 | Aracheological Impact Assessment for the Proposed Establishment of the Tse Distribution Substation on Portion 8 of the Farm Damfontein 114, near Nourpoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | CTS_11079 | 08/02/2013 - 11:03 | |
Palaeontology Report for Damfontein Solar Energy Facility 728 | Proposed Damfontein Solar Energy Facility, Noupoort, Northern Cape Province. Palaeontology Report | PIA Phase 1 | 30/10/2012 | JF Durand | Skarab CC | 08/02/2013 - 10:22 | ||
Heritage Report for Damfontein Solar Energy Facility 728 | Archaeological Impact Assessment for the Proposed Establishment of the Damfontein Solar Energy Facility on Portion 8 of Farm damfontein 114, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 08/02/2013 - 10:15 | ||
Heritage Report for Wonderheuwel Solar Energy Facility 731 | Archaeological Impact Assessment for the Proposed Establishment of the Wondergeuwel Solar Energy Facility on Portion 7 of Farm Damfontein 114, near Nourpoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 08/02/2013 - 10:08 | ||
Mthatha HIA | Mthatha Mall Phase I Cultural Heritage Impact Assessment | HIA Phase 1 | 28/11/2012 | Mamoluoane Seliane | Strategic Environmental Focus (Pty) Ltd - KwaZulu-Natal | Mthatha Mall (Pty) | 07/02/2013 - 16:48 | |
HIA_SASOL SHONDONI CONVEYER AMENDMENT PROJECT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE SASOL SHONDONI CONVEYER AMENDMENT PROJECT ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/11/2011 | Julius CC Pistorius | Sasol (Pty) Ltd | 06/02/2013 - 12:40 | ||
HIA_Siyathuthuka Road Upgrade | PHASE 1 HIA FOR THE SIYATHUTHUKA ROAD UPGRADE, BELFAST, MPUMALANGA | HIA Phase 1 | 01/09/2012 | Makhosazana Mngomezulu | Nemai Consulting | Nemai Consulting | 06/02/2013 - 11:26 | |
Basic Heritage Impact Assessment | A BASIC HERITAGE IMPACT ASSESSMENT REPORT FOR THE LAKEVIEW FLOODLINE CONFINEMENT AND WATER USE LICENCE APPLICATION, CONSTANTIA KLOOF, ROODEPOORT | HIA Phase 1 | 31/01/2013 | Anton Pelser | A Pelser Archaeological Consulting | 05/02/2013 - 12:15 | ||
Prestwich Precinct Revitalization Stage 1 HIA | PRESTWICH PRECINCT REVITALISATION ERVEN 738, 734, 564, 202, 566 GREEN POINT. | Burial Grounds and Graves Specialist Reports | 01/02/2011 | Timothy Hart | ACO Associates CC | Citythinkspace | 05/02/2013 - 11:46 | |
Grootspruit 252 Solar | Phase 1 Heritage Impact Assessment of a Proposed New Solar Facility at Grootspruit 252 near Allanridge, FS | HIA Phase 1 | 10/09/2012 | Lloyd Rossouw | H2ON Environmental | CTS_109887 | 05/02/2013 - 09:58 | |
Wonderfontein Colliery | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/08/2008 | Julius CC Pistorius | Zyntha Consulting (Pty) Ltd | 04/02/2013 - 16:02 | ||
HIA Askham Development | Heritage Impact Assessment Report Proposed residential development of 100 erven and associated infrastructure on Portion 1 of Farm No 139, Gordonia Road, Mier Municipality, Northern Cape Province. | HIA Phase 1 | 01/01/2013 | Renee Rust, Liezl van Pletzen-Vos | Pro-Active Archaeology | Enviroafrica CC | 04/02/2013 - 15:54 | |
HIA Prieska 313 Scoping Report | Heritage Impact Scoping Report: Proposed Establishment of a Photovoltaic Energy Generation Facility near Prieska in the Northern Cape Province | Heritage Scoping | 03/08/2012 | Stephan Gaigher | Gaigher & Associates | Savannah Environmental (Pty) Ltd | 04/02/2013 - 13:19 | |
PIA Prieska 313 | Proposed Solar Energy Facility at Prieska, Northern Cape Province: Scoping Report Palaeontology | PIA Desktop | 06/11/2012 | JF Durand | Gaigher & Associates | Savannah Environmental (Pty) Ltd | 04/02/2013 - 12:58 | |
HIA Buffelskloof Revised | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT OF PORTIONS OF PORTION 3 OF THE FARM BUFFELSKLOOF 511 IQ NORTH WEST PROVINCE | HIA Phase 1 | 09/12/2011 | Udo Kusel | African Heritage Consultants CC | Welwyn Town Planners | 04/02/2013 - 12:09 | |
Kambaku Private School | Heritage impact Assessment for the Proposed Development of the Kambaku private School on the Farm Vlakplaats 137 KQ, approximately 15 km north of Thabazimbi, Limpompo Province | HIA Phase 1 | 01/02/2012 | Marko Hutten | Hutten Heritage Consultants | Tekplan Environmental | 04/02/2013 - 11:57 | |
Postmasburg Power Line | 132 kV Power line connection to the Humasrus Solar Thermal Energy Power plant, postmasburg. | HIA Phase 1 | 22/03/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 04/02/2013 - 10:32 | |
Letter of Exemption: Lekkersing Alt 2 | RECOMMENDED EXEMPTION FROM HAVING TO CONDUCT AN ARCHAEOLOGICAL STUDY: THE PROPOSED CONSTRUCTION OF A WASTE DISPOSAL FACILITY AT LEKKERSING (ALTERNATIVE 2), NORTHERN CAPE PROVINCE | HIA Letter of Exemption | 05/12/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviro Logic | 04/02/2013 - 10:12 | |
Sannaspos Solar Farm - Palaeontological Report | Proposed PIA for the PV solar energy facilities in Sannaspos, near Bloemfontein, Free State. DEA REF: 14/12/16/3/3/2/360 (Phase 1) DEA REF: 14/12/16/3/3/1/615 (Phase 2) | 31/07/2012 | Job M. Kibii | University of the Witwatersrand - Institute for Human Evolution | 01/02/2013 - 15:16 | |||
Hoekplaas Photovoltaic Energy Plant | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED PHOTOVOLTAIC ENERGY PLANT ON THE FARM HOEKPLAAS NEAR COPPERTON, NORTHERN CAPE. | HIA Phase 1 | 10/01/2012 | Jayson Orton | ACO Associates CC | Aurecon - Head Office | 01/02/2013 - 15:04 | |
Sannaspos Solar Farm - Heritage Report | Phase 1 HIA study for the proposed PV solar energy facilities in Sannaspos, near Bloemfontein, Free State. DEA REF: 14/12/16/3/3/2/360 (Phase 1) DEA REF: 14/12/16/3/3/1/615 (Phase 2) | HIA Phase 1 | 07/07/2012 | Nkosinathi Godfrey Tomose | 01/02/2013 - 14:54 | |||
Springtontein Wind Energy Facility - Palaeontology Report | Proposed Wind and Solar Energy Facility at Springfontein, Free State - Desktop Report Palaeontology | JF Durand | G & A Heritage | 01/02/2013 - 14:43 | ||||
Springtontein Wind Energy Facility - Heritage Report | Heritage Impact Assessment Report - Wind Energy Generation Facility near Springfontein in the Free State Province | Stephan Gaigher | G & A Heritage | 01/02/2013 - 14:34 | ||||
Klipgat Heritage & Palaeontological Report | Phase 1 Heritage Impact Assessment for the Proposed Klipgat Solar Energy Facility (75MW), Near Noupooort, Northern Cape. DEA Ref No: 14/12/16/3/3/2/354 | 30/11/2012 | Nkosinathi Godfrey Tomose | 01/02/2013 - 14:20 | ||||
Palaeontology Report for Wonderheuwel Solar Energy Facility 731 | Proposed Wonderheuwel Solar Energy Facility, Noupoort, Northern Cape Province. Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | Skarab CC | 01/02/2013 - 13:12 | ||
Heritage Report for Wonderheuwel Solar Energy Facility 731 | Archaeological Impact Assessment for the Proposed Establishment of the Wonderheuwel Solar Energy Facility on Portion 7 of Farm Damfontein 114 near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Sholeen Shanker, Celeste Booth | Albany Museum - Archaeology | CTS_109707 | 01/02/2013 - 13:11 | |
Palaeontology Report for Damfontein Solar Energy Facility | Proposed Damfontein Solar Energy Facility, Noupoort, Northern Cape Province. Basic Assessment Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | Skarab CC | 01/02/2013 - 13:04 | ||
Heritage Report for Damfontein Solar Energy Facility | Archaeological Impact Assessment for the Proposed Establishment of the Damfontein Solar Energy Facility on Portion of Farm Damfontein 114, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 01/02/2013 - 12:57 | |||
Palaeontology Report for Allemans Fontein Solar Energy Facility 730 | Proposed Allemans Fontein Energy Facility, Noupoort, Northern Cape Province. Basic Assessment Report Palaeontology | 30/10/2012 | JF Durand | Skarab CC | 01/02/2013 - 12:48 | |||
Heritage Report for Allemans Fontein Solar Energy Facility 730 | Archaeological Impact Assessment for the Proposed Establishment of the Allemans Fontein Solar Energy Facility on remainder of Farm Allemans RE/83, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 01/02/2013 - 12:46 | ||
Palaeontology Report for Carolus Poort Solar Energy Facility 729 | Proposed Carolus Poort Solar Energy Facility, Noupoort, Northern Cape Province. Basic Assessment Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | Skarab CC | 01/02/2013 - 12:26 | ||
Heritage Report for Carolus Poort Solar Energy Facility 729 | Archaeological Impact Assessment for the Proposed Establishment of the Carolus Poort Energy Facility on remainder of Farm Carolus Poort RE/207, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 01/02/2013 - 12:24 | ||
ZWART BOOIS BERG ANNEX 475 Mitigation | ARCHAEOLOGICAL MITIGATION OF ARTEFACT SCATTERS ON ZWART BOOIS BERG ANNEX 475, KAKAMAS, NORTHERN CAPE | AIA Phase 2 | 12/01/2013 | Jayson Orton | ACO Associates CC | Aurecon - Nelspruit | 01/02/2013 - 12:22 | |
HIA_Northam Ext 17_De Put Residential Township | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DE PUT RESIDENTIAL TOWNSHIP DEVELOPMENT SOUTH OF NORTHAM, LIMPOPO | HIA Phase 1 | 01/05/2010 | M Hutten | Hutten Heritage Consultants | Tekplan Environmental | 01/02/2013 - 11:10 | |
HIA_Balloon Village, Ptn 27 of Farm Lofdal 42 | BASIC HERITAGE IMPACT ASSESSMENT REPORT FOR THE BALLOON VILLAGE DEMARCATION PROJECT | HIA Phase 1 | 28/06/2011 | Stephan Gaigher | Gaigher & Associates | Tekplan Environmental | 01/02/2013 - 10:46 | |
Palaeontology Report for Gilmer Solar Energy Facility 735 | Proposed Gilmer Solar Energy Facility, Noupoort, Northern Cape Province. Basic Assessment Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | 31/01/2013 - 14:12 | |||
HIA Mookodi - revised | ESKOM DISTRIBUTION MOOKODI INTEGRATION PROJECT HERITAGE REPORT – ENVIRONMENTAL IMPACT ASSESSMENT PHASE | HIA Phase 1 | 01/01/2013 | Johnny Van Schalkwyk | Heritage Consultants | Sivest - Gauteng | 31/01/2013 - 13:00 | |
Heritage Report for Gilmer Solar Energy Facility 735 | Archaeological Impact Assessment for the Proposed Establishment of the Gilmer Solar Energy Facility on remainder of ERF306, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 31/01/2013 - 12:59 | |||
Kanana Park Ext 6 | Proposed Kanana Park Extension 6 Township, Gauteng Province: Archaeological and Heritage Impact Assessment Report | AIA Phase 1 | 01/03/2012 | McEdward Murimbika, Trust Mlilo, Nkosinathi Godfrey Tomose | Nzumbululo Heritage Solutions | Kala-hari Survey Solutions and Products | 31/01/2013 - 09:15 | |
PIA_PV Facility_Farm Struisbult | PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM STRUISBULT (PORTION 1 OF FARM 104) NEAR COPPERTON, NORTHERN CAPE | PIA Desktop | 01/02/2012 | John E Almond | Natura Viva CC | Aurecon - Head Office | 30/01/2013 - 15:23 | |
HIA_PV Facility_Farm Vogelstruisbult | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED PHOTOVOLTAIC ENERGY PLANT ON THE FARM VOGELSTRUISBULT NEAR COPPERTON, NORTHERN CAPE | HIA Phase 1 | 02/02/2012 | Jayson Orton | ACO Associates CC | Aurecon - Head Office | 30/01/2013 - 15:19 | |
PIA_Access Road_Rem Farm Van Der Lindes Kraal 79 | PALAEONTOLOGICAL FIELD INVESTIGATION PHASE 1 REPORT FOR THE PROPOSED ACCESS ROAD ON THE REMAINDER OF THE FARM VAN DER LINDES KRAAL NO. 79, HANOVER, NORTHERN CAPE | PIA Phase 1 | 24/01/2013 | Gideon Groenewald | Metsi Metseng Geological Services CC | Simacel 160 ( Pty) Ltd | CTS_109627 | 30/01/2013 - 14:41 |
HIA Mooidraai-Smitskloof 132kV | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED CONSTRUCTION OF THE ESKOM MOOIDRAAI-SMITSKLOOF 132/22 KV POWERLINE AND SUBSTATION NEAR PRIESKA NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/08/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | SSI Engineering and Environmental Consultants | 30/01/2013 - 13:05 | |
Strybult_542_Sasol_Secunda_archaeology | A Phase 1 Heritage Impact Assessment (HIA) Study for Sasol’s Proposed new shaft complex on Strybult 542 and for the North Block on the Eastern Highveld in the Mpumalanga Province. | AIA Phase 1 | 01/05/2008 | Julius CC Pistorius | Clean Stream Environmental Services | 30/01/2013 - 09:09 | ||
Photovoltaic Facility, Kakamas | Heritage Impact Assessment Report for the proposed establishment of the Inca Soalr PV Power Plant, Kakamas region, Northern Cape Region. | HIA Phase 1 | 01/04/2011 | INCA Kakamas Solar (Pty) Ltd | 29/01/2013 - 16:08 | |||
Inca Solar Energy Facility | AIA FOR THE PROPOSED ESTABLISHMENT OF THE INCA SOLAR ENERGY FACILITY, DE AAR, NORTHERN CAPE. | AIA Phase 1 | 01/12/2012 | Jaco van der Walt | INCA De Aar (Pty) Ltd | 29/01/2013 - 15:36 | ||
HIA San Solar 273 revised | HERITAGE IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT PHASE Proposed establishment of the San Solar Energy Facility located south of Kathu on a Portion of the Farm Wincanton 472, Northern Cape Province. | Heritage Statement | 09/05/2012 | Stephan Gaigher | Gaigher & Associates | Savannah Environmental (Pty) Ltd | 28/01/2013 - 14:45 | |
PIA Rosendal | PALAEONTOLOGICAL HERITAGE ASSESSMENT: DESKTOP STUDY Proposed PV Solar Facility on a portion of the farm Rosendal 673 near Vryburg, Naledi Local Municipality, North-West Province | PIA Desktop | 01/01/2013 | John E Almond | Natura Viva CC | Sonvanger Solar Power Plant (Pty) Ltd. | 28/01/2013 - 14:22 |