Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 13351 - 13400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany |
Post date![]() |
---|---|---|---|---|---|---|---|
HIA NR27 Borrow Pit | Heritage Impact Assessment: PROPOSED STRENGTHENING (PARTIAL RECONSTRUCTION) OF NATIONAL ROUTE 27 SECTION 7 & 8 BETWEEN WESTERN/NORTHERN CAPE BORDER (KM 40.0) AND CALVINIA (KM 70.0) CONTRACT R.027-080-2011/1D | HIA Phase 1 | 10/04/2011 | Dave Halkett, Timothy Hart | ACO Associates CC | CCA ENVIRONMENTAL (Pty) Ltd | 28/06/2012 - 16:21 |
ERVEN 269 AND 272 IN VOLKSRUST | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSOLIDATION OF ERVEN 269 AND 272 IN VOLKSRUST, MPUMALNGA PROVINCE | AIA Phase 1 | 01/06/2012 | Anton van Vollenhoven | Archaetnos CC | 28/06/2012 - 16:06 | |
Middelburg Eastern Bypass | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MIDDELBURG EASTERN BYPASS ROUTE (AS REVISED), MIDDELBURG, MPUMALANGA PROVINCE | AIA Phase 1 | 01/06/2012 | Anton van Vollenhoven | Archaetnos CC | 28/06/2012 - 15:52 | |
Meppel/Joubertsvlei | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR A PROPOSED OPENCAST COAL MINE ON THE FARMS JOUBERTSVLEI 260 IT AND MEPPEL 264 IT, CLOSE TO ERMELO, MPUMALANGA PROVINCE | AIA Phase 1 | 01/06/2012 | Anton van Vollenhoven | Archaetnos CC | 28/06/2012 - 15:41 | |
Yzermyn Coal Mine | A REPORT ON A PRE- FEASIBILITY HERITAGE STUDY FOR THE PROPOSED YZERMYN COAL MINE CLOSE TO DIRKIESDORP, MPUMALANGA PROVINCE | AIA Phase 1 | 01/04/2012 | Anton van Vollenhoven | Archaetnos CC | WSP Environmental Pty Ltd - Johannesburg | 28/06/2012 - 15:08 |
Rietfontein Open Cast Coal Mine | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UMCEBO RIETFONTEIN OPENCAST MINE NEAR MIDDELBURG IN THE MPUMALANGA PROVINCE | AIA Phase 1 | 01/04/2012 | Anton van Vollenhoven | Archaetnos CC | 28/06/2012 - 14:46 | |
Leeuwpan Coal Consolidation | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE EXXARRO LEEUWPAN COAL CONSOLIDATION OF EMPR’S, CLOSE TO DELMAS IN THE MPUMALANGA PROVINCE | AIA Phase 1 | 01/04/2012 | Anton van Vollenhoven | Archaetnos CC | Ground Water Consulting Services | 28/06/2012 - 14:32 |
Kriel Colliery Beneficiation Plant | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BENEFICATION PLANT AT KRIEL COLLIERY, MPUMALANGA PROVINCE | AIA Phase 1 | 01/04/2012 | Anton van Vollenhoven | Archaetnos CC | SRK Consulting (Pty) Ltd - Pretoria | 28/06/2012 - 14:07 |
400 Kv Middelburg Power Line | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE DIVERSION OF A 400kV ESKOM POWERLINE NEAR MIDDELBURG IN THE MPUMALANGA PROVINCE | AIA Phase 1 | 28/06/2012 | Anton van Vollenhoven | Archaetnos CC | 28/06/2012 - 12:59 | |
Eskom Camcoll-Jericho 88kV line | Eskom Camcoll-Jericho 88kV line | PIA Desktop | 28/06/2012 | Heidi Fourie | Ditsong Museums of South Africa | Texture Environmental Consultants | 28/06/2012 - 12:23 |
Friedenheim Office Complex | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXTENTION OF THE FRIEDENHEIM OFFICE COMPLEX, NELSPRUIT, MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA | AIA Phase 1 | 28/06/2012 | Anton van Vollenhoven | Archaetnos CC | Aurecon - Head Office | 28/06/2012 - 12:10 |
PIA Koingnaas WEF | Palaeontological Impact Assessment (Desktop Study) Proposed Wind Energy Facility: Koingnaas Wind Energy Facility (Proposed by Just Palm Tree Power) | PIA Desktop | 22/09/2011 | John Pether | Geological and Palaeontological Consultant | Savannah Environmental (Pty) Ltd | 27/06/2012 - 10:34 |
HIA Koingnaas WEF | Heritage Impact Assessment for the Proposed Koingnaas Wind Energy Facility, Namakwa Magisterial District, Northern Cape | HIA Phase 1 | 09/09/2011 | Jayson Orton | ACO Associates CC | Savannah Environmental (Pty) Ltd | 27/06/2012 - 10:32 |
Misgund Interchange | INTERIM REPORT: ARCHAEOLOGICAL MITIGATION WORK, SITE PGS 01: N1 FREEWAY – MISGUND INTERCHANGE PROJECT, JOHANNESBURG, GAUTENG PROVINCE – SAHRA PERMIT 80/12/01/003/51 | AIA Phase 2 | 21/05/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 22/06/2012 - 15:31 | |
HIA Tharisa Mine | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED NEW THARISA MINE ON THE FARMS KAFFERSKRAAL 342 AND ELANDSDRIFT 467 NEAR MARIKANA IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/09/2009 | Julius CC Pistorius | SLR Consulting (Africa) | 22/06/2012 - 14:04 | |
Fairview Mine Dump_Pelser A | A Report on a 2nd opinion on possible graves found during a HIA done for the Fairview Mine Tailings Dam Reworking Project, near Barberton, Mpumalanga. | AIA Phase 1 | 01/04/2012 | Anton Pelser | Archaetnos CC | 22/06/2012 - 12:43 | |
fairview Mine | Heritage Impact Assessment for the proposed expansion of the Tailings Dam, Fairview Gold Mine, Barberton Region, Mpumalanga | AIA Phase 1 | 01/11/2011 | Johnny Van Schalkwyk | Heritage Consultants | 22/06/2012 - 12:39 | |
Van Stadens Wind Energy Facility PIA | Desktop Palaeontological Impact Assessment for Van Stadens Wind Farm | PIA Desktop | 22/06/2012 | Robert Gess | Rob Gess Consulting | SRK Consulting (Pty) Ltd - Pretoria | 22/06/2012 - 12:27 |
Erven 269 and 272 in Volkrust | A Report on a Heritage Impact Assessment for the proposed consolidation of Erven 269 and 272 in Volksrust, Mpumalanga Province. | AIA Phase 1 | 22/06/2012 | Anton van Vollenhoven | Archaetnos CC | 22/06/2012 - 12:23 | |
Middelburg Eastern Bypass | A Report on a Cultural Heritage Impact Assessment for the proposed Middelburg Eastern Bypass Route (As Revised), Middelburg, Mpumalanga Province | AIA Phase 1 | 12/06/2012 | Anton van Vollenhoven | Archaetnos CC | 22/06/2012 - 12:09 | |
Coal Mine_Joubertsvlei/Meppel_Van Vollenhoven AC_June 2012 | A Report on a Heritage Impact Assessment for a proposed opencast Coal Mine on the farms Joubertsvlei 260IT and Meppel 264It close to Ermelo, Mpumalanga Province. | AIA Phase 1 | 01/06/2012 | Anton van Vollenhoven | Archaetnos CC | 22/06/2012 - 11:46 | |
PIA Blue Wind | Palaeontological Impact Assessment (Desktop Study) Proposed Wind Energy Facility on Three Project Areas on the Namaqualand Coast, Northern Cape, Including Project Blue Wind Energy Facility, North of Kleinsee | PIA Desktop | 22/09/2011 | John Pether | Geological and Palaeontological Consultant | Savannah Environmental (Pty) Ltd | 22/06/2012 - 11:31 |
HIA Blue Wind | Heritage Impact Assessment for the Proposed Project Blue Wind Energy Facility, Kleinzee, Namakwa Magisterial District, Northern Cape | HIA Phase 1 | 30/05/2012 | Jayson Orton, Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 22/06/2012 - 11:25 |
Van Stadens Wind Energy Facility 2 | AN ARCHAEOLOGICAL ‘GROUND-TRUTHING’ SURVEY OF THE FOOTPRINT FOR THE PROPOSED METROWIND WIND ENERGY FACILITY (WEF) ON THE FARM RIETFONTEIN VAN STADENS, NELSON MANDELA BAY MUNICIPALITY, PORT ELIZABETH, EASTERN CAPE PROVINCE. | Archaeological Specialist Reports | 22/06/2012 | Celeste Booth | Albany Museum - Archaeology | SRK Consulting (Pty) Ltd - Pretoria | 22/06/2012 - 10:44 |
Van Stadens Wind Energy Facility | A phase 1 Archaeological Impact Assessment (AIA) for the proposed 20MW wind farm on three alternative sites: Erf 121, Driftsands (Site Alternative 1), Bushy Park Farm, Remainder of Erf 26, as well as portions 5, 6 and 7 thereof (Site Alternative 2) and Rietfontein Farm, Erf 594, Van Stadens East (Site Alternative 3), Nelson Mandela Metropolitan Municipality, Port Elizabeth, Eastern Cape Province | AIA Phase 1 | 22/06/2012 | Johan Binneman, Celeste Booth | Albany Museum - Archaeology | SRK Consulting (Pty) Ltd - Pretoria | 22/06/2012 - 10:36 |
PIA LOE SANRAL N10 Bridges | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES & MITIGATION: PROPOSED UPGRADING OF FOUR ROAD BRIDGES ALONG THE N10 BETWEEN GROBLERSHOOP & LAMBRECHTSDRIFT, NORTHERN CAPE | Palaeontological Specialist Reports | 01/03/2012 | John E Almond | Natura Viva CC | Van Zyl Environmental Consultants | 22/06/2012 - 09:36 |
Heritage Report SANRAL N10 Bridges | DOCUMENTATION OF FOUR BRIDGES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE | Heritage Statement | 01/04/2012 | Johnny Van Schalkwyk | Van Zyl Environmental Consultants | 22/06/2012 - 09:30 | |
PIA Aggeneys Orlight PV | BRIEF PALAEONTOLOGICAL IMPACT ASSESSMENT PROPOSED ORLIGHT SA DEVELOPMENT OF A SOLAR PHOTOVOLTAIC POWER PLANT NEAR AGGENEYS, NORTHERN CAPE PROVINCE Portion 1 of Farm Aroams 57 RD | PIA Phase 1 | 23/04/2012 | John Pether | Digby Wells Environmental | 21/06/2012 - 16:11 | |
PIA Aggeneys Orlight PV | BRIEF PALAEONTOLOGICAL IMPACT ASSESSMENT PROPOSED ORLIGHT SA DEVELOPMENT OF A SOLAR PHOTOVOLTAIC POWER PLANT NEAR AGGENEYS, NORTHERN CAPE PROVINCE Portion 1 of Farm Aroams 57 RD | PIA Phase 1 | 23/04/2012 | John Pether | Geological and Palaeontological Consultant | Digby Wells Environmental | 21/06/2012 - 16:10 |
Dobbin 75MW PIA | PALAEONTOLOGICAL ASSESSMENT: COMBINED DESKTOP & FIELD-BASED ASSESSMENT Proposed Dobbin Solar Farm on Portion 1 of Farm Het Fortuin No. 66 near Cradock, Eastern Cape Province | PIA Phase 1 | 21/03/2012 | John E Almond | Natura Viva CC | SRK Consulting (Pty) Ltd - Pretoria | 21/06/2012 - 15:53 |
Dobbin 75MW AIA | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED 75MW DOBBIN PHOTOVOLTAIC SOLAR FARM ON THE FARM HET FONTEIN 1/66, NEAR CRADOCK, INXUBA YETHEMBA DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 01/03/2012 | Celeste Booth | Albany Museum - Archaeology | SRK Consulting (Pty) Ltd - Pretoria | 21/06/2012 - 15:46 |
Palaeontological Report Kangnas craters | Report on site visit to potential meteorite impact site near Kangnas | Site Inspection Report | 16/05/2012 | Chris Harris | University of Cape Town - Geology | Aurecon - Head Office | 21/06/2012 - 14:38 |
Tselentis Colliery | Tselentis Colliery – Msobo Coal Ramp 9 Expansion Project, Lilliput 83 IT, Breyten, Mpumalanga | AIA Phase 1 | 21/06/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 21/06/2012 - 14:32 | |
HIA Aggeneys Aroams Orlight PV | Heritage Impact Assessment: Proposed Aggeneys Photo-voltaic Solar Power Plant on Portion 1 of the Farm Aroams 57, Northern Cape Province | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Aurecon - Head Office | 21/06/2012 - 13:00 |
Kudumane Mining | PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT FOR A MANGANESE MINE Farms York 279, Devon 277 and Telele 312, near Hotazel Town in the John Toalo Gaetsewe District Municipality in the Northern Cape Province | PIA Phase 1 | 29/03/2011 | Gideon Groenewald, Tom Hugo | Metsi Metseng Geological Services CC | Metago Environmental Engineers (Pty) Ltd | 21/06/2012 - 10:10 |
Potch 20 MW LOE | LETTER OF EXEMPTION OF AN HIA FOR THE PROPOSED CONSTRUCTION OF A GRI-CONNECTED 20MWp PHOTOVOLTAIC POWER PLANT & ITS ASSOCIATED INFRASTRUCTURE ON PORTION 434 OF TOWN AND TOWNLANDS 435 IQ, POTCHEFSTROOM, NORTH WEST | HIA Letter of Exemption | 19/06/2012 | Anton van Vollenhoven | Archaetnos CC | MGTD Environmental | 20/06/2012 - 14:24 |
Heritage Survey Kabi Vaalkop PV | Cultural Heritage Survey of the Proposed Kabi Vaalkop PV Facility near Orkney, Dr Kenneth Kaunda District, North West Province | Heritage Study | 01/04/2012 | Francois P Coetzee | Department of Anthropology and Archaeology, UNISA | Savannah Environmental (Pty) Ltd | 20/06/2012 - 08:40 |
HIA Loeriesfontein Orlight PV | Heritage Impact Assessment: Proposed Loeriesfontein Photo-voltaic Solar Power Plant on Portion 5 of the Farm Klein Rooiberg 227, Northern Cape Province | HIA Phase 1 | 01/05/2012 | Lita Webley, Dave Halkett, John Pether | ACO Associates CC, Geological and Palaeontological Consultant | Digby Wells Environmental | 19/06/2012 - 16:33 |
HIA Kenhardt Orlight PV | Heritage Impact Assessment: Proposed Kenhardt Photo-voltaic Solar Power Plant on Remainder of the Farm Klein Zwart Bast 188, Northern Cape | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett, John Pether | ACO Associates CC, Geological and Palaeontological Consultant | Digby Wells Environmental | 19/06/2012 - 16:26 |
HIA Aggeneys Orlight PV | Heritage Impact Assessment: Proposed Aggeneys Photo-voltaic Solar Power Plant on Portion 1 of the Farm Aroams 57, Northern Cape Province | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Digby Wells Environmental | 19/06/2012 - 16:21 |
Senekal Proposed Waste Disposal Site | PROPOSED SENEKAL SOLID WASTE FACILITY Senekal, Free State Province of South Africa Farm:Townlands in the Setsoto Municipality within the Thabo Mofutsanyane District Municipality | PIA Phase 1 | 30/01/2012 | Gideon Groenewald, Tom Hugo | Metsi Metseng Geological Services CC | 19/06/2012 - 15:56 | |
N9 section 7 - PIA | THE PROPOSED REHABILITATION OF SECTION 7 OF THE N9 NATIONAL ROAD Middelburg, Eastern Cape Province South Africa Road reserve, Section 7 of the N9 National Road , Luxuba Yethemba Municipality within the Chris Hani District Municipality | PIA Phase 1 | 24/10/2011 | Gideon Groenewald, Tom Hugo | Metsi Metseng Geological Services CC | Coastal & Environmental Services - East London | 19/06/2012 - 09:50 |
N9 section 7 | HERITAGE SURVEY OF THE N9 SECTION 7 FROM MIDDELBURG (km 0) TO CARLTON HEIGHTS (km 29) | HIA Phase 1 | 02/03/2012 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 19/06/2012 - 09:44 |
HIA Tutwa PV amended | HERITAGE IMPACT ASSESSMENT REPORT BASIC ASSESSMENT PHASE Proposed establishment of the Tutwa Solar Energy Facility located West of Upington on a Portion 4 of the Farm Narries 7, Northern Cape Province | HIA Phase 1 | 01/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 19/06/2012 - 09:36 |
AIA Inkululeko Carolus Poort 553 | A Phase 1 Archaeological Impact Assessment for the Proposed Establishment of the Inkululeko Solar Energy Facility on Portion 2 of the Farm Carolus Poort 167, near Noupoort, Northern Cape Province | AIA Phase 1 | 01/04/2012 | Celeste Booth | Albany Museum | Savannah Environmental (Pty) Ltd | 19/06/2012 - 08:39 |
PIA LOE Aroams PT2 Gravel mine | NOTE IN SUPPORT OF EXEMPTION FROM DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED EXTENSION OF EXISTING RAUMIX AGGREGATES (PTY) LTD. QUARRY NEAR AGGENEYS, NORTHERN CAPE Portion of Portion 2 of the Farm Aroams 57, Namaqualand | PIA Desktop | 12/06/2012 | John Pether | Geological and Palaeontological Consultant | Greenmined Environmental | 18/06/2012 - 13:20 |
HIA Aroams Pt 2 Gravel Mine | DESKTOP HERITAGE IMPACT ASSESSMENT: PROPOSED 1.5 HA EXTENSION OF GRAVEL MINE, PORTION 2 OF THE FARM AROAMS 57, NEAR AGGENEYS, NORTHERN CAPE PROVINCE | Heritage Scoping | 18/06/2012 | Lita Webley | ACO Associates CC | Greenmined Environmental | 18/06/2012 - 13:18 |
AIA Herbert Power Station II 2637 - Letter | Development of PV Power Station at Herbert near Douglas, Northern Cape | Archaeological Specialist Reports | 18/06/2012 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 18/06/2012 - 11:57 |
AIA Greefspan Power Station II 2637 - Letter | Development of PV Power Station at Greefspan near Douglas, Northern Cape | Archaeological Specialist Reports | 18/06/2012 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 18/06/2012 - 11:55 |
PIA Herbert Power Station II 2637 - scoping | PALAEONTOLOGICAL IMPACT ASSESSMENT: FIELD SCOPING STUDY Proposed photovoltaic power station adjacent to Herbert Substation near Douglas, Northern Cape Province | PIA Phase 1 | 01/10/2010 | John E Almond | Natura Viva CC | 18/06/2012 - 09:27 |