FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Paleontological Impact Assessment IMPACT ASSESSMENT FOR THE WASTE PYROLYSIS FACILITY IN CENTURION, GAUTENG Palaeontological Specialist Reports 25/06/2022 Elize Butler Banzai Environmental (Pty) Ltd EScience Associates (Pty) Ltd 15/07/2022 - 12:38
D2312 culvert washaway project D2312 culvert washaway project, Ndwedwe Local Municipality, KwaZulu-Natal Heritage Statement 03/05/2022 Jean Beater JLB Consulting EnviroPro 15/07/2022 - 10:32
Heritage Impact Assessment for the Demolition of the Old Railway Building on the Farm Driehoekspan 435, Glosam Northern Cape Application submitted to the South African Heritage Resources Agency (SAHRA) in terms Section 34 and Section 38 of the National Heritage Resources Act (No 25 of 1999) for the demolition of an Old Railway Building on the Farm Driehoekspan 435 near Glosam in the Tsantsabane Local Municipality, Northern Cape Heritage Impact Assessment Specialist Reports 11/07/2022 Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 14/07/2022 - 14:09
Application for Demolition of the Old Railway Building on the Farm Driehoekspan 435 near Glosam, Northern Cape Application submitted to the South African Heritage Resources Agency (SAHRA) in terms Section 34 and Section 38 of the National Heritage Resources Act (No 25 of 1999) for the demolition of an Old Railway Building on the Farm Driehoekspan 435 near Glosam in the Tsantsabane Local Municipality, Northern cape HIA Phase 1 11/07/2022 Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 14/07/2022 - 13:20
41032 Senekal Abstraction Heritage Impact Assessment for proposed construction of a new water abstraction facility at the Cyferfontein Dam near Senekal, Setsotso Local Municipality, FS Province. Heritage Impact Assessment Specialist Reports 01/03/2022 Lloyd Rossouw 14/07/2022 - 10:28
Elliot Agricultural Developments PHASE 1 HIA REPORT RELATED TO THE PROPOSED ELLIOT AGRICULTURAL DEVELOPMENTS [PIGGERY/FEEDMILL AND CLOETE SITESS 1–3], NEAR KHOWA (ELLIOT) IN THE SAKHISIZWE LOCAL MUNICIPALITY OF THE EASTERN CAPE - APAC022/43a HIA Phase 1 16/05/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bioblue Environmental Sustainability 13/07/2022 - 13:45
Elandsfontein Quarry MRA A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE HIGHLY BLUE TRADING (PTY) LTD MINING RIGHTS APPLICATION ON VARIOUS PORTIONS OF THE FARM ROODEKOPJES OR ZWARTKOPJES 427JQ MAGISTERIAL DISTRICT OF BRITS, NORTHWEST PROVINCE - APAC022/65 Heritage Impact Assessment Specialist Reports 12/07/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Gudani Consulting 13/07/2022 - 13:15
Phase 1 Cultural Heritage Impact Assessment: Demilander 273 Feedlot Phase 1 Cultural Heritage Impact Assessment: RECTIFICATION APPLICATION FOR THE CONSTRUCTION OF A CATTLE FEEDLOT ON THE FARM DEMILANDER 273, MARQUARD REGION, SETSOTO LOCAL MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 17/06/2022 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. 12/07/2022 - 21:19
HIA for Rosaly Farms Vaalwater Phase 1 Cultural Heritage Impact Assessment: RECTIFICATION APPLICATION FOR THE CONSTRUCTION OF A CATTLE FEEDLOT ON THE FARM DEMILANDER 273, MARQUARD REGION, SETSOTO LOCAL MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 07/06/2022 J A van Schalkwyk J A van Schalkwyk SPOOR Environmental Services (PTY) Ltd. 12/07/2022 - 20:49
PIA report Koria Boesmanskop PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KORIA-BOESMANSKOP 22 KV OHL ON FARM WORKSHOP 97, BETWEEN WEPENER AND VANSTADENSRUS, FREE STATE PROVINCE PIA Phase 2 17/06/2022 Marion Bamford 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 12/07/2022 - 15:56
Request for Exemption of any Palaeontological Impact Assessment for the proposed developments in Golden Harvest Park, northern Johannesburg, Gauteng Province Request for Exemption of any Palaeontological Impact Assessment for the proposed developments in Golden Harvest Park, northern Johannesburg, Gauteng Province PIA Desktop 23/05/2022 Marion Bamford Prof Marion Bamford 1World Consultants (Pty) Ltd 12/07/2022 - 15:55
Duho Mining CC- NC 12952 PR BASIC ASSESSMENT REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING TO PROSPECT FOR URANIUM ORE SITUATED ON THE FARMS DE VREEDE 133, MATJESFONTEIN 97 AND BLAAUBLOEMETJES KEEP 95 IN THE ADMINISTRATIVE DISTRICT OF SUTHERLAND, NORTHERN CAPE. 12/07/2022 - 15:29
Saco Mining (Pty) Ltd-NC 12953 PR BASIC ASSESSMENT REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING TO PROSPECT FOR BA (BARYTES), RE (RARE EARTHS), TA (TANTALUM/NIOBIUM), COLUMBIUM ORE, U (URANIUM ORE), F (FLUORSPAR) AND PC (PSEUDOCOAL) SITUATED ON THE FARM KUILEBURG 96 IN THE ADMINISTRATIVE DISTRICT OF SUTHERLAND, NORTHERN CAPE 12/07/2022 - 15:27
Saco Mining (Pty) Ltd- NC 13095 PR BASIC ASSESSMENT REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING TO PROSPECT FOR BA (BARYTES), RE (RARE EARTHS), TA (TANTALUM/NIOBIUM), NIOBIUM (COLUMBIUM) ORE, U (URANIUM ORE) AND F (FLUORSPAR) SITUATED ON THE FARMS GUNSTFONTEIN 151 AND BEERENVALLEY 150 IN THE ADMINISTRATIVE DISTRICT OF SUTHERLAND, NORTHERN CAPE 12/07/2022 - 15:23
Paarde Valley PV2 OHPL Palaeontological Impact Assessment PALAEONTOLOGICAL IMPACT ASSESSMENT PAARDE VALLEY PV2 GRID CONNECTION TO VETLAAGTE MAIN TRANSMISSION SUBSTATION (MTS) Palaeontological Specialist Reports 30/06/2022 Elize Butler Banzai Environmental (Pty) Ltd Holland & Associates Environmental Consultants 12/07/2022 - 15:17
Paarde Valley PV2 OHPL Heritage Impact Assessment HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINE FOR PAARDE VALLEY PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 16/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd Holland & Associates Environmental Consultants 12/07/2022 - 15:12
HIA Phase 1 for Zwemkuil Gordonii_track log Amended HIA for Zwemkuil Gordonii to include the track log HIA Phase 1 01/05/2022 Lloyd Rossouw Digital Soils Africa (Pty) Ltd 12/07/2022 - 10:15
Heritage Impact Assessment Environmental Impact Assessment process for the Eros –Vuyani 400kV line towers within 32m of a watercourse in KwaZulu Natal AIA Phase 1 12/09/2012 W Fourie PGS Heritage and Grave Relocation Consultants 10/07/2022 - 13:48
PIA Wag 'n Bietjie electrical infrastructure PIA Wag 'n Bietjie electrical infrastructure PIA Desktop 04/12/2021 Marion Bamford 10/07/2022 - 11:25
AIA for the WAg 'n Bietjie electrical infrastructure AIA Wag 'n Bietjie electrical infrastructure AIA Phase 1 11/11/2021 Jenna Lavin 10/07/2022 - 11:22
HIA Wag 'n Bietjie electrical infrastructure HIA Wag 'n Bietjie electrical infrastructure HIA Phase 1 01/12/2021 Jenna Lavin 10/07/2022 - 11:18
Brakpan Tailings Dam OVH Line & New Substation Motivation for Exemption from a full Phase I Heritage Impact Assessment - Environmental Impact Assessment for the Proposed construction of a 3.2 km long, 132kV overhead line (to be operated at 88kV) and a 88 kV substation (To be known as Brakpan Tailings dam Substation) located on Portion 77 of the farm Withok 131IR, Portion 76 of the farm Withok 131IR and Portion 5 of the farm Rooikraal 156IR, City of Ekurhuleni Metropolitan Municipality, Gauteng Province. APAC022/61 HIA Letter of Exemption 06/07/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING AB Enviro Consult CC 09/07/2022 - 10:11
38 Montpelier Place Building History Heritage Study Mike Backler Plans & Projects Plans & Projects 08/07/2022 - 13:51
Mandlakazi Bulk Mains HIA Mandlakazi Bulk Water Supply Scheme Upstream Main Heritage Assessment HIA Phase 1 20/02/2022 Jean Beater JLB Consulting Greenbelt Projects(Pty) Ltd 08/07/2022 - 13:33
Heritage Screening Impact Assessment (FBAR) SE3347 Appendix F Heritage Screening Impact Assessment HIA Phase 1 07/07/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 07/07/2022 - 14:20
1 Lydia Drive Alterations to a building older than 60 years Built Environment and Cultural Landscapes 07/07/2022 07/07/2022 - 13:41
Cultural Heritage Survey of the Proposed Gold Mine Operation by Gold One Africa Limited, Ventersburg Project, Lejweleputswa District Municipality, Free State Cultural Heritage Survey of the Proposed Gold Mine Operation by Gold One Africa Limited, Ventersburg Project, Lejweleputswa District Municipality, Free State HIA Phase 1 12/12/2011 Francois P Coetzee 07/07/2022 - 11:24
Palaeontological Impact Assessment for the proposed drilling of a well, AFO-024 (Well 1) on Farm Vogelrand 720, southeast of Hennenman, Free State Province Palaeontological Impact Assessment for the proposed drilling of a well, AFO-024 (Well 1) on Farm Vogelrand 720, southeast of Hennenman, Free State Province PIA Phase 1 20/03/2022 Marion Bamford 07/07/2022 - 11:14
Extension of Validity Letter: Vaal River Solar PVs THE EXTENSION OF VALIDITY TO THE EA - Vaal River Solar 1, 2, 3 and 4 PV Facilities and grid connection infrastructure (as amended) on a Site near Orkney, North West Province (previously called the Proposed Kabi Vaalkop Solar PV Facility) SAHRIS Case 57 HIA Letter of Exemption 05/07/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 06/07/2022 - 16:29
Mogalakwena mine Mogalakwena Mine North 06/07/2022 - 15:34
Repairs and Renovations to 287 Church Street ( amendment to permit 21/346) Repairs and Renovations to 287 Church Street, Portion 2 of erf 2428 Pietermaritzburg. Amendments to Permit 21/346. Built Environment and Cultural Landscapes 10/01/2022 Sumesh Govender 06/07/2022 - 14:40
Repairs and Renovations to 287 Church Street, Pietermaritzburg Repairs and Renovations to 287 Church Street, Portion 2 of erf 2428 Pietermaritzburg, Kwa Zulu Natal Built Environment and Cultural Landscapes 10/01/2022 Sumesh Govender 06/07/2022 - 14:09
1477_Phase 1 HIA AN UPDATED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR RHOVAN OPERATIONS IN THE CENTRAL BANKEVELD OF THE NORTH-WEST PROVINCE OF SOUTH AFRICA HIA Phase 1 Dr Julius CC Pistorius Glencore Operations South Africa (Pty) Ltd 06/07/2022 - 10:23
Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province HIA Phase 1 27/06/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 06/07/2022 - 09:14
Phase 1 HIA:Windhoek 393 Phase 1 Heritage Impact Assessment HIA Phase 1 05/07/2022 Lloyd Rossouw Electri City Mining (Pty) Ltd 05/07/2022 - 11:53
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tsebeblox Prospecting Right Application on Portion 25 and the Remaining Extent of the Farm Bankpan 225 IS and Portion 1 and the Remaining Extent of the Farm Killowen 465 IS, Bethal, Mpumalanga AIA Desktop 30/05/2022 Tobias Coetzee Tobias Coetzee 04/07/2022 - 14:26
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed New Peacanwood Coal Mining Development on a Portion of the Remaining Extent of the Farm Wildfontein 420 JS, district Middelburg, Mpumalanga AIA Phase 1 20/06/2022 Tobias Coetzee Tobias Coetzee 04/07/2022 - 13:35
HIA_NABOOMSPRUIT 348 KR Heritage Impact Assessment for the proposed Naboomspruit Township Development Limpopo Province HIA Phase 1 Jaco van der Walt 04/07/2022 - 11:26
Phase 1 HIA Groblershoop Phase 1 Heritage Impact Assessment of the proposed Orange River Solar 1 SPV facility on Portion 18 of the farm Rooisand 387 near Groblershoop, NC Province. HIA Phase 1 22/06/2022 Lloyd Rossouw Paleo Field Service 01/07/2022 - 09:15
Mitigation Report - Recording of York-001 Heritage – Mitigation: Recording of Farm Dwelling on the farm York, Kudumane Manganese Mining Co, Hotazel, Northern Cape Province AIA Phase 2 16/05/2022 Mauritz Naude PGS Heritage (Pty) Ltd Kudumane Manganese Resources (Pty) Ltd 30/06/2022 - 22:38
Archaeological & Paleontological Reports Archaeological & Paleontological Reports for Glencore Eastern Mines Residue Facility Extension project Archaeological Specialist Reports 01/12/2019 Nelius Kruger Exigo Coastal Environmental Services 30/06/2022 - 15:07
Proposed SANSA Space Operations at portion 8 of Farm Matjiesfontein Western Cape HIA: Proposed SANSA Space Operations at portion 8 of Farm Matjiesfontein Western Cape HIA Phase 1 Jenna Lavin CTS Heritage Coastal Environmental Services 30/06/2022 - 14:23
Heritage Impact Exemption and 2014 HIA LETTER FOR HIA EXEMPTION REQUEST: THE PROPOSED ESKOM MATIMBA POWER STATION ASH DISPOSAL FACILITY POLLUTION CONTROL DAMS, CLOSE TO LEPHALALE, LIMPOPO PROVINCE HIA Letter of Exemption 12/01/2022 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants WSP Group Africa (Pty) Ltd 30/06/2022 - 10:44
Heritage Screener: Claire PV i and II Desktop Heritage Screening Assessment for the Proposed development of Claire PV 1 and Claire PV 2 in Clayville, Gauteng HIA Letter of Exemption 23/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 30/06/2022 - 08:18
Palaeontological Impact Assessment for the proposed Lichtenburg Solar Park – L22 026E North West Province Palaeontological Impact Assessment for the proposed Lichtenburg Solar Park North West Province PIA Phase 1 23/04/2022 Marion Bamford Prof Marion Bamford AGES (PTY) Ltd - Limpopo 29/06/2022 - 11:04
Heritage Impact Assessment for the Lichtenburg Solar Park, North West Province Heritage Impact Assessment for the Lichtenburg Solar Park, North West Province HIA Phase 1 22/04/2022 Jaco van der Walt Beyond Heritage AGES (PTY) Ltd - Limpopo 29/06/2022 - 11:00
MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED UNIVERSITY OF PRETORIA (UP) SOLAR FACILITY DEVELOPMENT MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED UNIVERSITY OF PRETORIA (UP) SOLAR FACILITY DEVELOPMENT ON A PORTION OF KOEDOESPOORT 456JR, UNIVERSITY OF PRETORIA, CITY OF TSHWANE HIA Letter of Exemption 16/06/2022 Anton Pelser University of Pretoria 29/06/2022 - 09:19
Heritage Screener: Kiara PV 7 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 7 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:42
Heritage Screener: Kiara PV 6 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 6 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:41
Heritage Screener: Kiara PV 5 Desktop Heritage Screening Assessment for the Proposed development of the Kiara PV 5 Facility and Associated Infrastructure, North West Province Heritage Scoping 24/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 28/06/2022 - 16:40

Pages

CSV
 
 

Search form