FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Heritage Screener: Red Sands PV 2 Desktop Heritage Screening Assessment for the Proposed development of the Red Sands PV 2 Facility in the Northern Cape Heritage Scoping 28/10/2021 Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 08/04/2022 - 10:49
HIA: Red Sands PV 1 HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Red Sands PV 1 Facility in the Northern Cape HIA Phase 1 17/03/2022 Jenna Lavin, Nicholas Wiltshire, marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 08/04/2022 - 10:42
Heritage Screener: Red Sands PV 1 Desktop Heritage Screening Assessment for the Proposed development of the Red Sands PV 1 Facility in the Northern Cape Heritage Scoping 28/10/2021 Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 08/04/2022 - 10:40
PIA: Wolf-Skillpad-Grassridge 132kV Transmission Line Palaeontological Impact Assessment for the proposed Wolf-Skilpad-Grassridge 132 kV powerline, Kirkwood area, Eastern Cape Province PIA Phase 2 29/03/2022 Marion Bamford University of the Witwatersrand Zutari (Pty) Ltd 08/04/2022 - 09:52
HIA: Wolf-Skillpad-Grassridge 132kV Transmission Line A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE NEW WOLF – SKILPAD – GRASSRIDGE 132 KV TRANSMISSION LINE, KARIEGA / KIRKWOOD, EASTERN CAPE PROVINCE AIA Phase 1 31/03/2022 Kobus Reichert Eastern Cape Heritage Consultants Zutari (Pty) Ltd 08/04/2022 - 09:48
Status Quo Report for the proposed relocation of graves at Wolvefontein 471 JS Status Quo and pre-mitigation Heritage Impact Assessment Report for Burials Identified during Phase 1 Impact Assessment Study for South 32 mining expansion in Steve Tshwete Local Municipality, in Mpumalanga Province. Site Inspection Report 30/07/2019 Trust Mlilo Sativa Travel and Environmental Consultants Seriti Power (Pty) Ltd 07/04/2022 - 21:46
Heritage Screening Assessment: Mercury Solar PV Desktop Heritage Screening Assessment for the Proposed development of the Mercury Solar PV Cluster near Orkney in the Free State Heritage Scoping 07/04/2022 Jenna Lavin CTS Heritage Landscape Dynamics - Cape Town 07/04/2022 - 18:11
Heritage Specialist Comment Letter (07/04/2022) Appendix C - Heritage Specialist Comment Letter Heritage Statement 07/04/2022 John Gribble ACO Associates CC Savannah Environmental (Pty) Ltd 07/04/2022 - 11:34
Cultural Heritage Scoping Assessment: Cultural Heritage Scoping Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 17 AND THE REMINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE Heritage Scoping 01/12/2021 Johnny van Schalkwyk 06/04/2022 - 08:54
PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 7 (DE VALERA), PORTION 16, THE REMAINING EXTENT OF PORTION 5 (GELUK), PORTION 17 AND THE REMAINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE PIA Desktop 03/12/2021 Elize Butler Banzai Environmental (Pty) Ltd 06/04/2022 - 08:50
Mining Permit application on a certain portion of portion 3 of the farm Farview 410 JQ Draft BAR Mining Permit application on a certain portion of portion 3 of the farm Farview 410 JQ in the jurisdiction of Mahikeng Local Municipality 06/04/2022 Tshiala Silas Raluthaga Malebogo Mining Company UGWA Consulting Services 06/04/2022 - 02:02
Smero human settlements project Smero human settlements project, uMsunduzi Local Municipality, KwaZulu-Natal HIA Phase 1 15/03/2022 Jean Beater JLB Consulting SPHE Consulting Services 05/04/2022 - 17:03
PIA 11kV line desktop Palaeontological Impact Assessment for the proposed powerline for Cavalier Foods, Cullinan, east of Pretoria, Gauteng Province PIA Desktop 05/01/2022 Prof Marion Bamford Prof Marion Bamford Beyond Heritage 05/04/2022 - 15:16
AIA/HIA for proposed development of chicken broilers on portion of portion 20 of the Farm Schoonoord 164 IS. PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED CHICKEN BROILER (FARM) DEVELOPMENT ON PORTION 20 OF THE FARM SCHOONOORD 164 IS, SITUATED IN THE MAGISTERIAL DISTRICT OF MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY IN MPUMALANGA PROVINCE. HIA Phase 1 04/03/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Singo Consulting (Pty) Ltd 05/04/2022 - 10:39
Telecommunication Base Station: Sable View Farm Heritage Impact Assessment for the proposed Telecommunication Base Station: Sable View Farm, Thabazimbi Limpopo Province Archaeological Specialist Reports 30/03/2022 Jaco van der Walt Boniswa Towerco (Pty) Ltd Tekplan Environmental 05/04/2022 - 08:49
Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Heritage Scoping 20/01/2022 Liesl Stegmann AGES (PTY) Ltd - Limpopo 05/04/2022 - 08:39
Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Heritage Scoping 20/01/2022 Liesl Stegmann AGES (PTY) Ltd - Limpopo 05/04/2022 - 08:20
Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Heritage Scoping 20/01/2022 Liesl Stegmann AGES (PTY) Ltd - Limpopo 05/04/2022 - 08:15
Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Proposed Deerpark Intersection Filling Station on erf 4413 Tzaneen Heritage Scoping 20/01/2022 Liesl Stegmann AGES (PTY) Ltd - Limpopo 04/04/2022 - 16:24
HIA: Becrux PV 2 Heritage Impact Assessment for the Proposed development of a solar photovoltaic (PV) energy facility and associated infrastructure with a generation capacity of up to 10MWac, located near Sasolburg in the Free State Province HIA Phase 1 15/03/2022 Jenna Lavin, Heidi Fivaz, marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 04/04/2022 - 14:32
Heritage Screener: Becrux PV 2 Desktop Heritage Screening Assessment for the Proposed development of a solar photovoltaic (PV) energy facility and associated infrastructure with a generation capacity of up to 10MWac, located near Sasolburg in the Free State Province Heritage Scoping 21/02/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 04/04/2022 - 14:32
BASIC HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX 3.6MWp SOLAR PV FACILITY A REPORT ON A BASIC HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX 3.6MWp SOLAR PV FACILITY ON 3.8HA OF THE PROPERTY OF UNILEVER BOKSBURG ERVEN 757 & 758 BOKSBURG EAST PORTIONS 127 & 128 OF VOGELFONTEIN 84IR CITY OF EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG - APAC021/87 HIA Phase 1 01/10/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Ecoleges Environmental Consultants 04/04/2022 - 12:05
Lakeside/Leeuwfontein AIA PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Lakeside/Leeuwfontein Colliery Expansion near Ogies, Mpumalanga AIA Phase 1 01/07/2020 Tobias Coetzee Eco Elementum (Pty) Ltd 01/04/2022 - 20:30
Wonderwerk Cave 2019 Report of Wonderwerk Cave 2019 Excavation Archaeological Permit Report Michael Chazan Department of Anthropology, University of Toronto 01/04/2022 - 19:51
Wonderwerk Cave 2018 Report on 2018 excavation at Wonderwerk Cave Archaeological Permit Report 01/04/2022 Michael Chazan Department of Anthropology, University of Toronto 01/04/2022 - 19:24
Oakfield Development, Portion 240, 241 and 242 of the Farm Rietfontein 189, I.Q., Mogale Municipality Heritage Impact Assessment for the Proposed Oakfield Development located on Portions 240, 241 and 242 of Farm Rietfontein 189 I.Q. Mogale Municipality, West Rand District Municipality PIA Phase 1 01/04/2022 - 10:44
Palaeontological Impact Assessment for the Proposed Residential Township (Andeon X47), on Portion 183 (a Portion of Portion 179) of the Farm Zandfontein 317-JR, City of Tshwane, Gauteng Province Palaeontological Impact Assessment for the Proposed Residential Township (Andeon X47), on Portion 183 (a Portion of Portion 179) of the Farm Zandfontein 317-JR, City of Tshwane, Gauteng Province PIA Desktop 29/10/2021 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 31/03/2022 - 17:10
Proposed residential township development on Portion 183 of the Farm Zandfontein 317-JR, City of Tshwane Metropolitan Municipality, Gauteng Province Proposed residential township development on Portion 183 of the Farm Zandfontein 317-JR, City of Tshwane Metropolitan Municipality, Gauteng Province HIA Phase 1 04/12/2021 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 31/03/2022 - 17:08
CMP - Kaditshwene Cultural landscape Conservation Management Plan Of Kaditshwene Cultural Landscape Conservation Management Plan South African Heritage Resources Agency 31/03/2022 - 14:14
Goudkoppie Klerksdorp PHASE 1 HIA REPORT FOR THE PROPOSED DEVELOPMENT OF AN OFFICE AND VEHICLE WORKSHOP LOCATED ON A PORTION TOWNLANDS OF KLERKSDORP 424IP CITY OF MATLOSANA LOCAL MUNICIPALITY NORTHWEST PROVINCE HIA Phase 1 15/09/2021 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 31/03/2022 - 12:44
HIA FOR JOHANDEHO TOWNSHIP ESTABLISHMENT Phase 1 archaeological and Heritage Impact Assessment for Johandeho Township Establishment - Phase 2, situated on the Remainder of Portion 8 of the Farm Rietkuil 554 IQ, eMfuleni Local Municipality in Gauteng Province HIA Phase 1 01/02/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Gauteng Department of Human Settlements 31/03/2022 - 12:14
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 16/03/2022 Stephan Gaigher Tekplan Environmental 30/03/2022 - 12:30
HIA for Proposed Schoemanskloof R539 Improvement Project, Mpumalanga Heritage Impact Assessment required under Section 38(8) if the NHRA, 1999 (Act 25 of 1999) for the Proposed Schoemanskloof Route R539 Improvement Project, Mpumalanga HIA Phase 1 15/03/2022 Jaco van der Walt Beyond Heritage Prism Environmental Management Services cc 30/03/2022 - 11:22
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS IN KIMBERLITE (DK) ON THE REMAINING EXTENT, PORTION 1, PORTION 2 AND PORTION 3 (BOORWATER) OF THE FARM BULTFONTEIN 327, REGISTRATION DIVISION: HAY, NORTHERN CAPE PROVINCE HIA Phase 1 10/03/2022 Johnny van Schalkwyk 30/03/2022 - 10:26
PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR The proposed Prospecting Right combined with a Waste Licence application to prospect for Diamonds Alluvial (DA), Diamonds General (D) and Diamonds in Kimberlite (DK) on the Remaining Extent, Portion 1, Portion 2, and Portion 3 (Boorwater) of the farm Bultfontein 327, Registration Division: Hay, Northern Cape Province. PIA Desktop 10/03/2022 Elize Butler Banzai Environmental (Pty) Ltd 30/03/2022 - 10:24
Final HIA Report Phase 1 Heritage Impact Assessment HIA Phase 1 29/03/2022 Lloyd Rossouw Palaeo Field Services 29/03/2022 - 14:26
Pofadder 3 WEF Heritage Reports PROPOSED POFADDER WIND ENERGY FACILITY 3, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 01/03/2022 Jayson Orton ASHA Consulting(Pty) Ltd SiVEST SA (Pty) Ltd 29/03/2022 - 11:30
Pofadder 2 WEF Heritage Reports PROPOSED POFADDER WIND ENERGY FACILITY 2, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 01/03/2022 Jayson Orton ASHA Consulting(Pty) Ltd SiVEST SA (Pty) Ltd 29/03/2022 - 11:18
Pofadder 1 WEF Heritage Reports PROPOSED POFADDER WIND ENERGY FACILITY 1, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 30/07/2022 Jayson Orton ASHA Consulting(Pty) Ltd SiVEST SA (Pty) Ltd 29/03/2022 - 10:28
Derdepoort Residential Development PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 426 OF THE FARM DERDEPOORT 326JR, CITY OF TSHWANE, GAUTENG HIA Phase 1 07/02/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 29/03/2022 - 09:17
Paleontology IA - Block L Palaeontology Desktop Assessment for the proposed N'Komati Anthracite Mine Extension, in the Barberton Magisterial District, Mpumalanga Province PIA Desktop 09/12/2021 Elize Butler PGS Heritage (Pty) Ltd Alta van Dyk Environmental Consultants cc 28/03/2022 - 16:47
HIA - Block L Heritage Impact Assessment for the N'Komati Anthracite Mine, Nkomazi Local Municipality, in the Ehlanzeni Ditrict Municipality, Mpumalanga Province HIA Phase 1 27/01/2022 Henk Steyn PGS Heritage (Pty) Ltd Alta van Dyk Environmental Consultants cc 28/03/2022 - 16:43
HERITAGE BASELINE REPORT For the Elandsfontein PV Cluster (Themeda PV and Aristida PV) , Lichtenburg, North-West Province HERITAGE BASELINE REPORT For the Elandsfontein PV Cluster (Themeda PV and Aristida PV), Lichtenburg, North-West Province Heritage Scoping 22/03/2022 28/03/2022 - 13:24
Palaeontological Impact Assessment for the proposed Botterblom Wind Energy Facility, north of Loeriesfontein, Northern Cape Province Palaeontological Impact Assessment for the proposed Botterblom Wind Energy Facility, north of Loeriesfontein, Northern Cape Province PIA Desktop 18/09/2021 Marion Bamford Prof Marion Bamford Enviro-Insight CC 28/03/2022 - 10:24
PIA Dawkinsville Cemetery Desktop Phase 1 Palaeontological Impact Assessment for the proposed Dawkinsville Cemetery, Klerksdorp, North West Province PIA Desktop 25/03/2022 Prof Marion Bamford Prof Marion Bamford Setala Environmental 26/03/2022 - 16:07
PIA for Rosaly Farms Vaalwater Palaeontological Impact Assessment for the proposed land clearing on Farm Sterkstroom 250, Vaalwater, Limpopo Province PIA Desktop 14/02/2022 Marion Bamford SPOOR Environmental Services (PTY) Ltd. 25/03/2022 - 17:08
HIA For Rosaly Farms Vaalwater Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF IRRIGATED CROP FIELDS AND THE CONSTRUCTION OF DAMS FOR AGRICULTURAL CROP PRODUCTION, ROSALY FARMS, VAALWATER AREA, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 22/02/2022 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. SPOOR Environmental Services (PTY) Ltd. 25/03/2022 - 17:04
Phase 1 AIA for proposed Mareesburg Mining Application Phase 1 Archaeological Impact Assessment for the Proposed ECM Mareesburg Mining Development on Portions of the Farm Helena 6 JT and Mareesburg 8 JT, Steelpoort, Limpopo AIA Phase 1 01/02/2022 Tobias Coetzee Tobias Coetzee Envass 25/03/2022 - 12:23
Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Surface Infrastructure changes at the UMK Mine on Farm Botha 313, the Remaining Extent (Re) of the Farm Smartt 314, and Portion 1 and Remaining Extent (RE) of the Farm Rissik 330, Northern Cape Province Palaeontological Specialist Reports 11/03/2022 Marion Bamford Wits Archaeology Consulting (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 25/03/2022 - 11:11
Heritage Impact Assesment Heritage Impact Assessment for New Surface Infrastructure at United Manganese Kalahari, Hozatel Northern Cape Province Heritage Impact Assessment Specialist Reports 11/03/2022 Jaco van der Walt HCAC Heritage Consultants SLR Consulting (Africa) (Pty) Ltd 25/03/2022 - 11:07

Pages

CSV
 
 

Search form